i
Ven Consulting
Filter interviews by
I applied via Naukri.com and was interviewed in Feb 2022. There were 4 interview rounds.
Documents Verification
Total Float and Free Float are two important concepts in project management that help in scheduling and resource allocation.
Total Float is the amount of time a task can be delayed without affecting the project deadline.
Free Float is the amount of time a task can be delayed without affecting the start time of the next task.
Total Float = Late Finish - Early Finish or Late Start - Early Start
Free Float = Early Start of Ne...
Array command in AutoCAD is used to create multiple copies of objects in a pattern.
Select the object to be copied
Specify the base point for the array
Specify the distance and direction of the array
Specify the number of rows and columns in the array
Choose between rectangular and polar array
Press enter to complete the array
Critical Path is the longest sequence of activities in a project that must be completed on time to ensure the project is completed on schedule.
Critical Path determines the minimum time required to complete a project.
It helps in identifying the activities that are critical to the project's success.
Any delay in the critical path activities will delay the project's completion.
It involves identifying all the activities, th...
No, critical path cannot deviate.
Critical path is the longest path in a project network diagram.
It determines the shortest possible duration of the project.
Any deviation from the critical path will result in a delay in the project completion.
Therefore, the critical path cannot deviate.
The first row of a billing typically contains the name and address of the client or customer.
Name and address of the client
Date of the billing
Invoice number
Description of the work done
Quantity of work done
Rate per unit
Total amount
Rate of a quantity can be found from various sources.
Check government websites for official rates
Consult with industry experts
Research market trends and prices
Refer to pricing indexes and databases
A contractor's bill can be approved by verifying the work done and comparing it with the contract terms and conditions.
Verify the work done by the contractor
Compare the work done with the contract terms and conditions
Check for any discrepancies or errors in the bill
Ensure that all necessary documents and approvals are in place
Approve the bill only after thorough verification
Top trending discussions
I applied via Referral and was interviewed before Dec 2020. There was 1 interview round.
Threading is a way to execute multiple tasks concurrently in a single program.
Threading allows for parallel execution of code
Threads share the same memory space
Example: running a background task while the main program continues to run
posted on 6 Dec 2019
I applied via Naukri.com and was interviewed in Jun 2019. There were 6 interview rounds.
posted on 3 Jul 2024
Functions return a single value while stored procedures can perform multiple operations and return multiple values.
Functions return a single value while stored procedures can return multiple values.
Functions are used for computations and return values, while stored procedures are used for executing a series of statements.
Functions can be called from within SQL statements, while stored procedures are called using the EX...
Abstract class can have implementation details, while interface only contains method signatures.
Abstract class can have constructors, fields, and methods with implementation details, while interface can only have method signatures.
A class can inherit from only one abstract class, but can implement multiple interfaces.
Abstract classes are used when some common functionality needs to be shared among multiple classes, whi...
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Jun 2020. There were 3 interview rounds.
The latest trends include AI, remote work, sustainability, and digital transformation.
Artificial Intelligence (AI) is being integrated into various industries and processes to improve efficiency and accuracy.
Remote work is becoming more popular due to advancements in technology and the COVID-19 pandemic.
Sustainability is a growing concern for businesses and individuals, leading to a shift towards eco-friendly practices...
HR Executive Recruiter
41
salaries
| ₹2.6 L/yr - ₹3.7 L/yr |
HR Recruiter
38
salaries
| ₹1.6 L/yr - ₹4 L/yr |
HR Executive
24
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Resource Manager
21
salaries
| ₹5.4 L/yr - ₹9 L/yr |
Civil Engineer
16
salaries
| ₹2.9 L/yr - ₹7.7 L/yr |
US Tech Solutions
Kelly Services
Harjai Computers
Gi Group