Upload Button Icon Add office photos

Filter interviews by

Vascon Engineers Senior Site Engineer Site Execution Interview Questions and Answers

Updated 28 Mar 2023

Vascon Engineers Senior Site Engineer Site Execution Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Only based on work experience
  • Q2. Previous company work profile
  • Ans. 

    I worked as a Senior Site Engineer at XYZ Construction Company.

    • Managed site execution activities and ensured adherence to project timelines.

    • Supervised a team of engineers and laborers to ensure smooth workflow.

    • Coordinated with architects, contractors, and clients to resolve any issues or conflicts.

    • Monitored quality control and conducted regular inspections to ensure compliance with specifications.

    • Prepared progress repo...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on work with deeply analysis, site management

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Conduct the offline test

Round 2 - Technical 

(8 Questions)

  • Q1. Density of steel, cement, concrete, sand, aggregates.
  • Ans. 

    Density of common construction materials

    • Steel: 7850 kg/m^3

    • Cement: 1440 kg/m^3

    • Concrete: 2400 kg/m^3

    • Sand: 1600-1700 kg/m^3

    • Aggregates: 1500-1750 kg/m^3

  • Answered by AI
  • Q2. How to find triangle concrete quantity.
  • Ans. 

    Triangle concrete quantity can be found using the formula: 1/2 * base * height * thickness.

    • Calculate the area of the triangle using the formula: 1/2 * base * height.

    • Multiply the area by the thickness to get the concrete quantity.

    • For example, if the base of the triangle is 5 meters, height is 8 meters, and thickness is 0.2 meters, the concrete quantity would be: 1/2 * 5 * 8 * 0.2 = 4 cubic meters.

  • Answered by AI
  • Q3. How to find circular column concrete quantity.
  • Ans. 

    Circular column concrete quantity can be found using the formula: Volume = πr^2h

    • Calculate the area of the circular column using the formula A = πr^2

    • Measure the height of the column

    • Multiply the area by the height to get the volume of concrete needed

    • Consider any additional factors such as wastage or reinforcement bars

  • Answered by AI
  • Q4. As a site engineer what is your roles and responsibilities.
  • Q5. What is slump test why we do.
  • Ans. 

    Slump test is a method to measure the consistency of concrete before it sets.

    • Slump test is used to determine the workability of fresh concrete.

    • It involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.

    • The amount of slump indicates the consistency of the concrete - a higher slump means a more workable mix.

    • Slump test helps in ensuring that the concrete mix ...

  • Answered by AI
  • Q6. Compressive strength of concrete after 14 & 28 days and also persentage of strength.
  • Ans. 

    Compressive strength of concrete is typically measured after 14 and 28 days to assess its strength development.

    • Compressive strength of concrete is usually measured in pounds per square inch (psi) or megapascals (MPa).

    • After 14 days, the average compressive strength of concrete is around 60-75% of its ultimate strength.

    • After 28 days, the concrete typically reaches about 90-95% of its ultimate strength.

    • The percentage of s...

  • Answered by AI
  • Q7. Mix ratios of concrete
  • Ans. 

    Mix ratios of concrete refer to the proportions of cement, sand, and aggregate used in a concrete mix.

    • Mix ratios are typically expressed as a ratio of cement:sand:aggregate, such as 1:2:4.

    • The mix ratio will vary depending on the strength and durability requirements of the concrete.

    • Common mix ratios include 1:2:3 for low strength concrete and 1:1.5:3 for high strength concrete.

    • Water is also added to the mix to achieve t

  • Answered by AI
  • Q8. Building IS Codes
Round 3 - HR 

(2 Questions)

  • Q1. Family background, Expected salary, present salary, Notice period.
  • Q2. Why you choose shoba.

Interview Preparation Tips

Interview preparation tips for other job seekers - Trust your self. And be prepare.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. How do you check slab shuttering? What is the process?
  • Ans. 

    Slab shuttering is checked by ensuring proper alignment, levelness, and stability of formwork before concrete pouring.

    • Check alignment of formwork with respect to the structural drawings

    • Ensure formwork is level using a spirit level

    • Inspect the stability of formwork to prevent any collapse during concrete pouring

    • Check for any gaps or misalignments in the formwork that may affect the quality of the slab

    • Verify that all nece...

  • Answered by AI
  • Q2. How to calculate concrete quantity
  • Ans. 

    Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.

    • Calculate the volume of the area to be filled (length x width x height)

    • Determine the density of the concrete (usually around 2400 kg/m^3)

    • Multiply the volume by the density to get the total concrete quantity needed

    • Consider adding a percentage for wastage or spillage

  • Answered by AI
  • Q3. How will you manage your site activities?
  • Q4. Where the lapping provided in coloumn?
  • Ans. 

    Lapping is provided in columns to ensure proper bonding between the column reinforcement and the beam reinforcement.

    • Lapping is typically provided at the junction of vertical and horizontal reinforcement bars in columns.

    • It helps in transferring the load from the column to the beam effectively.

    • The length of lapping required is specified in the structural drawings or as per design requirements.

    • Proper lapping ensures struc...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This is the best platform for experienced and freshers also
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Referral and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Quantity of the steel required per sqm
  • Ans. 

    The quantity of steel required per sqm varies depending on the type of structure and design specifications.

    • The quantity of steel required per sqm is typically calculated based on the structural design drawings and specifications.

    • Factors such as the type of structure, load requirements, and design codes influence the amount of steel needed per sqm.

    • For example, in a reinforced concrete structure, the quantity of steel pe...

  • Answered by AI
  • Q2. Painting specifications
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Reason for job change
  • Ans. 

    Seeking new challenges and opportunities for growth in a dynamic work environment.

    • Desire for professional development and advancement

    • Looking for new challenges and learning opportunities

    • Seeking a more dynamic work environment

    • Interested in applying skills and knowledge to different projects

  • Answered by AI
  • Q2. Salary expected
  • Ans. 

    Negotiable based on industry standards and job responsibilities.

    • Salary expectations are based on industry standards and the responsibilities of the role.

    • Consider factors such as location, company size, and years of experience when determining salary expectations.

    • Research average salaries for Site Engineers in the specific industry and location to have a realistic expectation.

    • Be prepared to discuss salary expectations d...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Mep engeneering
  • Q2. Plumbing drawing

Interview Preparation Tips

Interview preparation tips for other job seekers - One by one round
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about yourself Cement density Brick size Concrete grade
  • Ans. 

    I am a Site Engineer with expertise in cement density, brick size, and concrete grade.

    • I have extensive knowledge of different types of cement and their densities.

    • I am familiar with various brick sizes and their applications in construction.

    • I have experience working with different concrete grades for different structural requirements.

    • I can provide recommendations on the appropriate cement density, brick size, and concre

  • Answered by AI
  • Q2. Soil density Concrete lap joint Slab Cover
Round 3 - HR 

(3 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    I am a dedicated and experienced Site Engineer with a strong background in construction and project management.

    • Bachelor's degree in Civil Engineering

    • 5 years of experience in managing construction projects

    • Proficient in using construction software and tools

    • Strong problem-solving and decision-making skills

    • Excellent communication and leadership abilities

    • Completed successful projects such as building a commercial complex an

  • Answered by AI
  • Q2. Tell me about your family background
  • Ans. 

    My family background is diverse and has influenced my values and work ethic.

    • My parents are both engineers, which inspired me to pursue a career in engineering.

    • I come from a close-knit family that values education and hard work.

    • My grandparents were farmers, teaching me the importance of perseverance and adaptability.

    • I have a sibling who is a doctor, which has given me insights into the medical field.

    • My family has always...

  • Answered by AI
  • Q3. Education qualification

Interview Preparation Tips

Interview preparation tips for other job seekers - Dress well, confident , answer the questions confidently, don't nervous.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Nov 2022. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Last job and work details
  • Q2. Work experience details

Interview Preparation Tips

Topics to prepare for Oberoi Realty Civil Site Engineer interview:
  • Block work
  • Plaster work
Interview preparation tips for other job seekers - Work experience in details

I applied via Company Website and was interviewed in Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Good skills sincer good job
Round 3 - Case Study 

Interview Preparation Tips

Interview preparation tips for other job seekers - Good working good had work in job
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is formwork and their types
  • Q2. Grades of concrete and steel
Round 2 - HR 

(2 Questions)

  • Q1. Are to ready to work in tight schedule like overnight from 8 am to 6pm
  • Q2. How many years you are work in this company

Interview Preparation Tips

Interview preparation tips for other job seekers - If u are going to attend interview for site engineer Mainly focus on
1. IS456:2000
2.form Work
3. Steel Bar bending schedule
4. Basic civil engineering related knowledge

Vascon Engineers Interview FAQs

How many rounds are there in Vascon Engineers Senior Site Engineer Site Execution interview?
Vascon Engineers interview process usually has 2 rounds. The most common rounds in the Vascon Engineers interview process are Resume Shortlist and One-on-one Round.

Tell us how to improve this page.

Vascon Engineers Senior Site Engineer Site Execution Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 124 Interviews
DLF Interview Questions
4.0
 • 74 Interviews
Prestige Group Interview Questions
4.3
 • 35 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Ashiana Housing Interview Questions
4.0
 • 29 Interviews
Sunteck Realty Interview Questions
3.4
 • 23 Interviews
View all
Billing Engineer
30 salaries
unlock blur

₹2.2 L/yr - ₹7.1 L/yr

Executive Engineer
29 salaries
unlock blur

₹2.4 L/yr - ₹6 L/yr

Civil Site Engineer
28 salaries
unlock blur

₹2.2 L/yr - ₹4.7 L/yr

Junior Engineer
24 salaries
unlock blur

₹2.2 L/yr - ₹4 L/yr

Site Engineer
22 salaries
unlock blur

₹2.2 L/yr - ₹4.6 L/yr

Explore more salaries
Compare Vascon Engineers with

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Godrej Properties

3.7
Compare

DLF

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview