i
Varroc Group
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 3 interview rounds.
1. Discuss with sales and marketing team and fix three months rolling plans
2. According to rolling plans prepare capacity plan and mold combination plan considering bottlenecks in production
3. Prepared and fix weekly plan taking into consideration MKT requirement, material availability and mold combination, machine availability
4. Generate Day wise plan, put in to SAP to generate production order to take MRP run
...
My salary range is competitive and negotiable based on the job requirements and responsibilities.
My salary range is based on my experience, skills, and the job market.
I am open to negotiation based on the job requirements and responsibilities.
I am looking for a competitive salary that reflects my value and contribution to the company.
Top trending discussions
posted on 9 Apr 2024
I applied via campus placement at Birsa Institute of Technology (BIT) Sindri, Jharkhand and was interviewed in Mar 2024. There were 4 interview rounds.
Verbal, quantitative and reasoning
Current relevance topics
posted on 5 Jul 2023
I applied via Company Website
Ball screws are used for converting rotational motion into linear motion, while LM guides are used for guiding linear motion.
Ball screws use ball bearings to reduce friction and increase efficiency in converting rotational motion into linear motion.
LM guides use linear motion bearings to provide smooth and precise linear motion guidance.
Ball screws are commonly used in CNC machines, robotics, and other precision machin...
I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.
The 7 wastes of production are categories of waste that can occur in manufacturing processes.
Transportation: Unnecessary movement of materials or products
Inventory: Excess inventory leading to storage costs and potential waste
Motion: Unnecessary movement of workers
Waiting: Idle time during production processes
Overproduction: Producing more than needed
Overprocessing: Using more resources than necessary
Defects: Errors le
Lean manufacturing is a production method focused on minimizing waste and maximizing efficiency.
Focuses on eliminating waste in all forms, including time, materials, and resources
Involves continuous improvement and problem-solving to streamline processes
Emphasizes value creation for the customer
Utilizes tools such as 5S, Kanban, and Kaizen
Promotes a culture of employee involvement and empowerment
Kaizen is a Japanese term meaning continuous improvement. There are several types of Kaizen, including Gemba Kaizen, Flow Kaizen, and Process Kaizen.
Kaizen is a Japanese business philosophy focused on continuous improvement.
Gemba Kaizen involves making improvements at the workplace where the work is done.
Flow Kaizen focuses on improving the flow of work or processes.
Process Kaizen involves making improvements to specif
posted on 20 Dec 2021
I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2022. There were 6 interview rounds.
Like that behaviour company experience grooming
Checking my technical skills and knowledge
posted on 29 Oct 2022
I applied via Campus Placement
50% Aptitude + 50% core questions are asked
Topic given 10 minutes before the GD
posted on 31 Mar 2023
based on 2 reviews
Rating in categories
Quality Engineer
308
salaries
| ₹1.1 L/yr - ₹7.2 L/yr |
Assistant Manager
240
salaries
| ₹4.6 L/yr - ₹13.9 L/yr |
Production Engineer
236
salaries
| ₹1.2 L/yr - ₹6.8 L/yr |
Senior Engineer
235
salaries
| ₹2.5 L/yr - ₹9.4 L/yr |
Maintenance Engineer
166
salaries
| ₹1.5 L/yr - ₹8.4 L/yr |
Bharat Forge
Samvardhana Motherson Group
Sundaram Clayton
Endurance Technologies