I applied via Walk-in and was interviewed in Jul 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Questions related to transformer safety, UPS operation and maintenance, Fire Fighting System , Fire Control System
  • Q2. Basic questions related to personal introduction, your past job experience, salary expectation,

Interview Preparation Tips

Interview preparation tips for other job seekers - Be gentle and confident, what you say.

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (3)

Jobs at VAR Facility Management Solutions

View all

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How to applyDear Mr.Nurul, Greetings from Kowju Airport Hotel, We are pleased to offer you the position of Housekeeping Associate. Kindly reply back mentioning you accept this offer. -----------------...
  • Q2. I am disturb interview

Interview Preparation Tips

Interview preparation tips for other job seekers - One your experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2024. There were 3 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Operation manager asking for general question
Round 2 - One-on-one 

(1 Question)

  • Q1. National head will asking your experience
Round 3 - One-on-one 

(1 Question)

  • Q1. CS head directly conducting the interviews
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What does the screening process by the recruitment team entail?
  • Ans. 

    The screening process involves reviewing resumes, conducting interviews, skills assessments, and background checks.

    • Reviewing resumes to assess qualifications and experience

    • Conducting interviews to evaluate communication and fit

    • Skills assessments to test technical abilities

    • Background checks for verification of information provided

    • Reference checks to gather feedback from previous employers

  • Answered by AI
  • Q2. Was a technical person from OCS conducting the interview?
  • Q3. How are shortlisted candidates aligned for interviews at the client site?
  • Ans. 

    Shortlisted candidates are aligned for interviews at the client site based on availability, location, and client preferences.

    • Coordinate with the client to determine their availability for interviews

    • Consider the location of the client site and the candidates' proximity

    • Take into account any specific preferences or requirements the client may have

    • Schedule interviews accordingly to ensure a smooth process

  • Answered by AI
  • Q4. Did the recruitment team conduct the HR round?

Interview Preparation Tips

Interview preparation tips for other job seekers - Fresher candidates are given the opportunity to experience the work culture in a data center.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - One-on-one 

(13 Questions)

  • Q1. How many year of experience
  • Ans. 

    I have 5 years of experience in housekeeping supervision.

    • I have worked as a Housekeeping Supervisor for 5 years.

    • During my time as a Housekeeping Supervisor, I have successfully managed a team of 15 staff members.

    • I have implemented new cleaning procedures and protocols to improve efficiency and cleanliness.

    • I have trained new staff members on proper cleaning techniques and safety procedures.

  • Answered by AI
  • Q2. Basic knowledge of chemicals
  • Q3. Basic knowledge of machinery
  • Q4. How many manpower handle
  • Ans. 

    The number of manpower handled depends on the size of the housekeeping department and the workload.

    • The number of manpower handled can range from a few employees to a large team, depending on the size of the facility.

    • It is important to have a sufficient number of staff to effectively manage the cleaning and maintenance tasks.

    • Factors such as shift schedules, workload distribution, and employee turnover can also impact th...

  • Answered by AI
  • Q5. HR policies and compliance
  • Q6. Reason of leaving the company
  • Ans. 

    Seeking new challenges and growth opportunities

    • Desire for career advancement

    • Looking for a new environment to learn and develop skills

    • Seeking better work-life balance

    • Company restructuring or downsizing

    • Relocation to a new area

  • Answered by AI
  • Q7. Short term goal and long term goal
  • Q8. Rolls and responsibilities
  • Q9. Ground staff briefing and how to teach them
  • Q10. Paper works of housekeeping supervisor
  • Ans. 

    The paper works of a housekeeping supervisor involve maintaining records, schedules, inventory, and communication with staff.

    • Maintaining records of cleaning schedules and tasks

    • Keeping track of inventory for cleaning supplies

    • Communicating with housekeeping staff regarding assignments and updates

    • Completing reports on room cleanliness and maintenance issues

  • Answered by AI
  • Q11. Salary expectation
  • Q12. Knowledge of consumption and inventory
  • Q13. Computer operating systems
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Parts of pumps and motors
  • Ans. 

    Parts of pumps and motors include impeller, casing, shaft, bearings, and seals.

    • Impeller: Rotating component that generates the flow in a pump.

    • Casing: Encloses and supports the impeller and other parts of the pump.

    • Shaft: Transfers power from the motor to the impeller.

    • Bearings: Support and align the shaft within the pump.

    • Seals: Prevent leakage of fluid from the pump.

  • Answered by AI
  • Q2. About conveyor and their problems
Round 2 - Technical 

(3 Questions)

  • Q1. About conveyors and problems
  • Q2. Parts of pumps and motors
  • Ans. 

    Parts of pumps and motors include impeller, casing, shaft, bearings, and motor housing.

    • Impeller: Rotating component that generates the flow within the pump.

    • Casing: Encloses the impeller and directs the flow of fluid through the pump.

    • Shaft: Transfers the rotational energy from the motor to the impeller.

    • Bearings: Support the shaft and reduce friction during rotation.

    • Motor housing: Encloses the motor and provides protecti

  • Answered by AI
  • Q3. About yaskawa robot
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What are your goals and how do you plan to achieve them?
  • Q2. What are some of the career role models that you identify with?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for anything and treat everyone with kindness.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Aptitude Test 

Self motivate for any work and good skill

Round 2 - Technical 

(2 Questions)

  • Q1. Very good solution any work
  • Q2. Are your location in meerut

Interview Preparation Tips

Interview preparation tips for other job seekers - any person mind and body hard work
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is transformer vector group
  • Ans. 

    Transformer vector group is a method used to represent the phase shift between the primary and secondary windings of a transformer.

    • Transformer vector group indicates the relationship between the primary and secondary winding phases.

    • It helps in determining the connection and phase shift of the transformer windings.

    • Common vector groups include Yy0, Yd1, Dyn11, etc.

    • Vector group is important for parallel operation of trans

  • Answered by AI
  • Q2. Why we are desting vbd test in transformer
  • Ans. 

    VBD test is conducted in transformers to ensure insulation integrity and detect any potential faults.

    • VBD test helps in identifying any weak spots in the insulation of the transformer

    • It helps in preventing breakdowns and ensuring the safety and reliability of the transformer

    • By conducting VBD test, any potential faults can be detected early and necessary maintenance can be carried out

    • It is a standard procedure in transfo

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Dusters Total Solutions Services Electrical Engineer interview:
  • Electricals
  • Documentation
Interview preparation tips for other job seekers - Any
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Sep 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Hello my self SWAGAT KUSHWAHA.
  • Q2. Bvg india ltd. In working job

Interview Preparation Tips

Interview preparation tips for other job seekers - My name is Swagat Kushwaha, I have been working in bVG India limited since 2 years and bVG India limited company provides us the facility to work satisfactorily, I hope to join BVG India limited company in my future. Thank you.

VAR Facility Management Solutions Interview FAQs

How to prepare for VAR Facility Management Solutions interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at VAR Facility Management Solutions. The most common topics and skills that interviewers at VAR Facility Management Solutions expect are Property Management, Communication Skills, Facility Management, Residential and Commercial Buildings.

Tell us how to improve this page.

VAR Facility Management Solutions Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Quess Interview Questions
3.9
 • 404 Interviews
JLL Interview Questions
4.1
 • 347 Interviews
CBRE Interview Questions
4.2
 • 260 Interviews
Sodexo Interview Questions
4.1
 • 160 Interviews
Leadec India Interview Questions
4.1
 • 65 Interviews
Colliers India Interview Questions
3.9
 • 63 Interviews
Knight Frank Interview Questions
4.1
 • 44 Interviews
View all

VAR Facility Management Solutions Reviews and Ratings

based on 84 reviews

4.3/5

Rating in categories

4.0

Skill development

4.2

Work-life balance

4.1

Salary

4.0

Job security

4.1

Company culture

3.8

Promotions

4.0

Work satisfaction

Explore 84 Reviews and Ratings
Property Manager - Residential

Bangalore / Bengaluru

8-10 Yrs

₹ 10-15 LPA

Explore more jobs
Shift Engineer
10 salaries
unlock blur

₹2.8 L/yr - ₹5.4 L/yr

Electrical Technician
8 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Property Manager
7 salaries
unlock blur

₹9 L/yr - ₹11.5 L/yr

Assistant Facility Manager
6 salaries
unlock blur

₹4.8 L/yr - ₹7.1 L/yr

Facility Manager
6 salaries
unlock blur

₹4.6 L/yr - ₹6.3 L/yr

Explore more salaries
Compare VAR Facility Management Solutions with

JLL

4.1
Compare

CBRE

4.2
Compare

Knight Frank

4.1
Compare

Colliers India

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview