Upload Button Icon Add office photos

Filter interviews by

USM Business Systems Project Engineer - Civil Interview Questions and Answers

Updated 26 Aug 2022

USM Business Systems Project Engineer - Civil Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Feb 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Experience in villa , buildings, technical questions about the work

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst company to work. Sudden termination

Interview questions from similar companies

I applied via Walk-in and was interviewed before Mar 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

Aptitude test

Round 2 - Group Discussion 

Current affairs

Round 3 - Technical 

(1 Question)

  • Q1. Puzzle , sql related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be yourself, whatever you know just be confident
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Google and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Coding Test 

Coding questions about array and string.

Round 2 - Coding Test 

Cosing questions about sql and ds.

Round 3 - HR 

(1 Question)

  • Q1. Personal and behavioral questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well with the fundamentals.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Coding Test 

2 questions of DSA medium to hard

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I applied via Walk-in

Round 1 - Technical 

(2 Questions)

  • Q1. How make a queue using a stack
  • Ans. 

    To implement a queue using a stack, use two stacks and simulate the queue operations.

    • Use two stacks, one for enqueue operation and one for dequeue operation.

    • For enqueue operation, simply push elements onto the stack used for enqueueing.

    • For dequeue operation, if the dequeue stack is empty, pop all elements from enqueue stack and push onto dequeue stack.

    • Then pop from the dequeue stack to simulate dequeue operation.

  • Answered by AI
  • Q2. Create a linked list
  • Ans. 

    A linked list is a data structure consisting of nodes where each node points to the next node in the sequence.

    • Create a Node class with data and next pointer

    • Initialize a head pointer to null

    • Add nodes by updating next pointers

    • Traverse the list by following next pointers

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-

I applied via Campus Placement and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Coding Test 

Easy to medium leetcode questions

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Closures, hostings, react js, redux, hooks basic
  • Q2. Html5, css3, basic javascript stuff
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Job Portal

Round 1 - Coding Test 

60mintues DSA level coding exam

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. React js, ReactHooks, es67 features, bootstrap
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. What is Connection pooling
  • Q2. What is mounting in docker
  • Q3. What is decorators
  • Q4. Shell script question

USM Business Systems Interview FAQs

How many rounds are there in USM Business Systems Project Engineer - Civil interview?
USM Business Systems interview process usually has 1 rounds. The most common rounds in the USM Business Systems interview process are Technical.

Tell us how to improve this page.

Interview Questions from Similar Companies

Affine Interview Questions
3.3
 • 49 Interviews
IT By Design Interview Questions
3.6
 • 40 Interviews
ConsultAdd Interview Questions
3.5
 • 36 Interviews
Systems Plus Interview Questions
4.3
 • 28 Interviews
DISYS Interview Questions
3.0
 • 27 Interviews
VDart Interview Questions
4.0
 • 27 Interviews
View all
US IT Recruiter
53 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Senior IT Recruiter
21 salaries
unlock blur

₹2.8 L/yr - ₹7.2 L/yr

Information Technology Recruiter
17 salaries
unlock blur

₹3 L/yr - ₹5.5 L/yr

SEO Executive
16 salaries
unlock blur

₹1.8 L/yr - ₹3.8 L/yr

Senior Recruiter
10 salaries
unlock blur

₹3.5 L/yr - ₹6.7 L/yr

Explore more salaries
Compare USM Business Systems with

Value Point Systems

3.6
Compare

JoulestoWatts Business Solutions

2.9
Compare

Saama Technologies

3.7
Compare

Systems Plus

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview