Bukolze relays are used in electrical engineering for their high reliability and ability to handle high voltage and current.
Bukolze relays are known for their robustness and durability.
They are commonly used in power systems and industrial applications.
These relays can handle high voltage and current levels, making them suitable for heavy-duty operations.
They provide reliable switching and protection in electrical circ...
CT and PT are used in electrical engineering for measurement and protection purposes.
CT (Current Transformer) is used to measure high currents and step them down to a level suitable for measurement instruments.
PT (Potential Transformer) is used to measure high voltages and step them down to a level suitable for measurement instruments.
CTs and PTs are also used for protection purposes, such as detecting faults and isola...
The number of transformer production varies depending on the company and market demand.
The number of transformer production is influenced by factors such as market demand, company size, and production capacity.
Large transformer manufacturers may produce thousands of transformers per year.
Smaller companies or custom transformer manufacturers may have lower production volumes.
The production volume can also vary based on ...
There are several types of breakers used in electrical engineering.
Circuit breakers are used to protect electrical circuits from overloads and short circuits.
Some common types of breakers include thermal, magnetic, and hydraulic-magnetic breakers.
Thermal breakers use a bimetallic strip to detect excessive heat and trip the circuit.
Magnetic breakers use a solenoid to detect high currents and trip the circuit.
Hydraulic-m...
I applied via Naukri.com
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
Previous site infrastructure included data centers, networking equipment, servers, and storage systems.
Data centers were located in multiple regions for redundancy.
Networking equipment included routers, switches, and firewalls.
Servers were a mix of physical and virtual machines.
Storage systems used SAN and NAS technologies.
Backup and disaster recovery plans were in place.
Monitoring tools were used to track performance
Multiple scenarios of UPS DG CHILLER FAILURES
I applied via Recruitment Consultant and was interviewed in Jun 2021. There was 1 interview round.
I have 10 years of work experience in mechanical engineering.
Designed and implemented mechanical systems for various projects
Performed analysis and simulations to optimize performance
Collaborated with cross-functional teams to ensure project success
Managed and supervised junior engineers
Implemented cost-saving measures in manufacturing processes
I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Facility Manager
71
salaries
| ₹0 L/yr - ₹0 L/yr |
Facility Executive
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Supervisor
37
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Urban Company
Housejoy
Qube Services
Timesaverz