i
United Hitech
Filter interviews by
Be the first one to contribute and help others!
posted on 14 Jan 2025
Quantitative reasoning
posted on 26 Oct 2024
I applied via campus placement at SRM Institute of Science & Technology, Chennai and was interviewed in Sep 2024. There was 1 interview round.
Starters are devices used to start and control the speed of induction motors.
Direct On-Line (DOL) starter: provides full voltage to the motor at start
Star-Delta starter: reduces the starting current by initially connecting the motor in star configuration
Auto-transformer starter: uses an auto-transformer to reduce the voltage during starting
Soft starter: gradually increases the voltage to the motor to reduce starting cu...
Earthing is the process of connecting electrical systems to the ground to prevent electric shock and protect equipment.
Types of earthing include plate earthing, pipe earthing, rod earthing, and strip earthing.
Methods of earthing include neutral earthing, equipment earthing, and system earthing.
Earthing is essential for safety in electrical systems to prevent electric shock and damage to equipment.
Proper earthing ensure...
TF stands for Transformer. It is a static device used to transfer electrical energy between two or more circuits through electromagnetic induction.
Principle of TF involves Faraday's law of electromagnetic induction.
Types of TF include step-up, step-down, isolation, auto-transformer, etc.
TFs are used in power distribution, voltage regulation, impedance matching, etc.
The starting current of a DOL starter is typically 6-8 times the rated current of the motor.
The Direct-On-Line (DOL) starter is used to start induction motors.
The starting current of a DOL starter is usually 6-8 times the rated current of the motor.
This high starting current can cause voltage drops and stress on the electrical system.
Choose AC cables based on current rating, insulation material, and environmental conditions.
Consider the current rating of the cable to ensure it can handle the load
Choose the appropriate insulation material based on the application and environment
Take into account environmental conditions such as temperature, moisture, and exposure to chemicals
Select the right cable size to minimize voltage drop and power loss
Ensure c...
posted on 30 Dec 2024
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
OSHA standards applicable to building construction include fall protection, hazard communication, scaffolding safety, and electrical safety.
Fall protection requirements include guardrails, safety nets, and personal fall arrest systems.
Hazard communication standards require employers to provide information about hazardous chemicals used on site.
Scaffolding safety regulations cover proper construction, use, and maintenan...
AISC codes applicable to steel structures include AISC 360 for design of structural steel buildings and AISC 341 for seismic design.
AISC 360 - Specification for Structural Steel Buildings
AISC 341 - Seismic Provisions for Structural Steel Buildings
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
I applied via Referral and was interviewed in Jul 2024. There were 3 interview rounds.
Purchase Assignment - Comparing PO's
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
based on 8 reviews
Rating in categories
Safety Officer
6
salaries
| ₹2.9 L/yr - ₹3 L/yr |
Mechanical Engineer
5
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Maintenance Engineer
4
salaries
| ₹2.4 L/yr - ₹3.6 L/yr |
Executive Accountant
4
salaries
| ₹3.5 L/yr - ₹3.6 L/yr |
Safety Supervisor
3
salaries
| ₹2.7 L/yr - ₹3.5 L/yr |
GAMMON INDIA
McNally Bharat Engineering
ABCI Infrastructures
Military Engineer Services