Upload Button Icon Add office photos

Unitech

Compare button icon Compare button icon Compare

Filter interviews by

Unitech Intern Interview Questions and Answers

Updated 13 Jun 2023

Unitech Intern Interview Experiences

1 interview found

Intern Interview Questions & Answers

user image Anonymous

posted on 13 Jun 2023

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Why want to join this company?
  • Q2. What do you under stand by summary trials

Interview questions from similar companies

Intern Interview Questions & Answers

Sobha user image Emad Mohammed

posted on 14 May 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Introduction about yourself
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction, previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Past experience and rates

Interview Preparation Tips

Interview preparation tips for other job seekers - Pressure will be more, since i worked in engineering team compare to others contracts department will be feeling the pressure more
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All related your experience
Round 3 - HR 

(1 Question)

  • Q1. Hr type question
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Dressing and personality

Round 2 - Technical 

(1 Question)

  • Q1. Site questions and finishing work

Senior Engineer Interview Questions & Answers

DLF user image MRITUNJAY KUMAR

posted on 15 Mar 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Structure work going on at site
  • Ans. 

    The structure work at the site involves the construction of a new building using steel beams and concrete columns.

    • Steel beams are being used for the framework of the building

    • Concrete columns are being installed to support the structure

    • The construction process includes pouring concrete, welding steel beams, and erecting walls

  • Answered by AI
  • Q2. Survey related questions
  • Q3. Planning related
  • Q4. About Relocation nearby site
  • Q5. Manage site works
  • Ans. 

    Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.

    • Coordinate with contractors and subcontractors to ensure work is completed on time and within budget

    • Monitor progress of construction activities and address any issues that may arise

    • Ensure compliance with safety regulations and quality standards

    • Communicat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready with your portfolio,and manage

I applied via Approached by Company and was interviewed in May 2022. There were 4 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Speak about yourself
Round 2 - Assignment 
Round 3 - Technical 

(1 Question)

  • Q1. Questions to test knowledge of the market
Round 4 - Technical 

(1 Question)

  • Q1. Market related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Get an idea about the company, their projects. Ask questions to interviewers.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary

Interview Questionnaire 

1 Question

  • Q1. Past work experience and some technical work related questions

Unitech Interview FAQs

How many rounds are there in Unitech Intern interview?
Unitech interview process usually has 2 rounds. The most common rounds in the Unitech interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

Unitech Intern Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.8
 • 136 Interviews
Lodha Group Interview Questions
4.0
 • 129 Interviews
DLF Interview Questions
4.0
 • 77 Interviews
Colliers India Interview Questions
3.9
 • 70 Interviews
Casagrand Interview Questions
3.8
 • 58 Interviews
View all

Unitech Intern Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Project Manager
26 salaries
unlock blur

₹6 L/yr - ₹12.5 L/yr

Senior Engineer
24 salaries
unlock blur

₹3.6 L/yr - ₹8.5 L/yr

Shift Engineer
19 salaries
unlock blur

₹2.7 L/yr - ₹4.6 L/yr

Assistant Manager
16 salaries
unlock blur

₹4.6 L/yr - ₹8 L/yr

Accounts Manager
15 salaries
unlock blur

₹6 L/yr - ₹12 L/yr

Explore more salaries
Compare Unitech with

Sobha

3.8
Compare

Lodha Group

4.0
Compare

Cushman & Wakefield

4.1
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview