Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Uniparts Group Team. If you also belong to the team, you can get access from here

Uniparts Group Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Uniparts Group Team Manager Interview Questions and Answers

Updated 23 Jul 2024

Uniparts Group Team Manager Interview Experiences

1 interview found

Team Manager Interview Questions & Answers

user image Anonymous

posted on 23 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. RCA, Counter measures, Customer Complaints,8D
Round 2 - Technical 

(2 Questions)

  • Q1. Parts per Milllion
  • Ans. 

    Parts per million (ppm) is a unit of measurement used to describe the concentration of a substance in a solution.

    • PPM is used to express very small concentrations of substances in a solution.

    • 1 ppm is equivalent to 1 part of solute for every 1 million parts of solution.

    • PPM is commonly used in environmental monitoring, water treatment, and chemical analysis.

  • Answered by AI
  • Q2. Kaizens Poka yoke

HCL Healthcare

Rated 4.5 for Work-Life Balance by our employees on AmbitionBox

Success to our employee's well-being? A work-life balance that's simply unbeatable.

Interview questions from similar companies

Manager Interview Questions & Answers

Bosch user image Anonymous

posted on 30 May 2022

I appeared for an interview before May 2021.

Interview Preparation Tips

Interview preparation tips for other job seekers - Brush up your technical knowledge. You should be well versed in the aspects you have mentioned in your resume.

I applied via Other and was interviewed before Oct 2020. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How will u handle workers if they dont work as u asked, one case study.
  • Q2. How will u reduce machine downtime?
  • Ans. 

    I will implement preventive maintenance, train operators, and monitor machine performance.

    • Implement a preventive maintenance program

    • Train operators on proper machine usage and maintenance

    • Monitor machine performance and address issues promptly

    • Regularly inspect machines for signs of wear and tear

    • Use data analysis to identify patterns and potential issues

    • Invest in high-quality equipment and parts

    • Establish clear communicat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared for domain, multiple rounds

I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to welding and quality

Interview Preparation Tips

Interview preparation tips for other job seekers - Companies environment is not healthy, avoid to join RKFL if you have other option.

I applied via Referral and was interviewed in Apr 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. How mainten in company
  • Q2. Company system perfectly
  • Q3. My team work my responsibility

Interview Preparation Tips

Interview preparation tips for other job seekers - Iam handle in company good work mainten

I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.

Interview Preparation Tips

Topics to prepare for Endurance Technologies Team Lead interview:
  • Just ignore the interview
Interview preparation tips for other job seekers - This company does not compensate employees as per market. There salaries are almost near to nothing
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 2 interview rounds.

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There was 1 interview round.

Interview Questionnaire 

8 Questions

  • Q1. How you will boost your team?
  • Q2. Draw a PLC logic for some example given?
  • Ans. 

    PLC logic is a programming language used to control industrial processes. Here's an example:

    • Start with inputs and outputs

    • Define the conditions for each input

    • Create a ladder diagram

    • Add rungs to the diagram for each condition

    • Test and debug the logic

  • Answered by AI
  • Q3. Robot axis types?
  • Ans. 

    Robot axis types refer to the number and direction of movement of a robot's joints.

    • There are typically 4-6 axis types in industrial robots

    • The most common types are linear, rotary, and spherical

    • Each axis type allows for different degrees of freedom and range of motion

  • Answered by AI
  • Q4. Robot programming?
  • Q5. Robot position modification?
  • Q6. Manual operation of robot?
  • Ans. 

    Manual operation of a robot involves controlling its movements and actions through physical manipulation.

    • Manual operation is typically done through a remote control or joystick.

    • The operator must have a clear understanding of the robot's capabilities and limitations.

    • Manual operation may be necessary in situations where the robot's sensors or programming are insufficient.

    • Examples include bomb disposal robots and surgical...

  • Answered by AI
  • Q7. Preventive maintenance?
  • Q8. Spare management?
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I appeared for an interview in Mar 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Can’t specify any thing
  • Q2. Hr final Round discussion.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always keep all the communication in mail or written format otherwise they will surely cut some amount you discussed . HR is not cooperative. Every time you have to remind he that you have mailed pls check and revert .
Contribute & help others!
anonymous
You can choose to be anonymous

Uniparts Group Interview FAQs

How many rounds are there in Uniparts Group Team Manager interview?
Uniparts Group interview process usually has 2 rounds. The most common rounds in the Uniparts Group interview process are One-on-one Round and Technical.
What are the top questions asked in Uniparts Group Team Manager interview?

Some of the top questions asked at the Uniparts Group Team Manager interview -

  1. Parts per Milll...read more
  2. RCA, Counter measures, Customer Complaints...read more
  3. Kaizens Poka y...read more

Recently Viewed

REVIEWS

L&T Valves

No Reviews

REVIEWS

Uniparts Group

No Reviews

COMPANY BENEFITS

Uniparts Group

No Benefits

COMPANY BENEFITS

L&T Valves

No Benefits

COMPANY BENEFITS

L&T Valves

No Benefits

COMPANY BENEFITS

Fuji Electric

No Benefits

SALARIES

Europa Locks

JOBS

ELGI Equipments

No Jobs

SALARIES

Europa Locks

SALARIES

L&T Valves

Tell us how to improve this page.

Uniparts Group Team Manager Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

Sun Pharmaceutical Industries

Join us and thrive in a company culture that inspires and empowers.

Interview Questions from Similar Companies

Bosch Interview Questions
4.2
 • 331 Interviews
UNO Minda Interview Questions
4.0
 • 170 Interviews
Bharat Forge Interview Questions
3.9
 • 55 Interviews
View all
Assistant Manager
82 salaries
unlock blur

₹4.2 L/yr - ₹9.5 L/yr

Engineer
76 salaries
unlock blur

₹2 L/yr - ₹7.3 L/yr

Senior Engineer
72 salaries
unlock blur

₹2.5 L/yr - ₹7.5 L/yr

Assistant Engineer
50 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Production Engineer
37 salaries
unlock blur

₹1.2 L/yr - ₹5.5 L/yr

Explore more salaries
Compare Uniparts Group with

Bharat Forge

3.9
Compare

Samvardhana Motherson Group

3.7
Compare

Sundaram Clayton

4.0
Compare

Ramkrishna Forgings

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview