i
Ultra Firetech Systems
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 2 interview rounds.
Human resource is the management of people within an organization to achieve its goals and objectives.
Recruiting and hiring employees
Training and development
Compensation and benefits
Employee relations and communication
Performance management
Compliance with labor laws and regulations
Creating a positive work culture
Managing diversity and inclusion
Succession planning
HR analytics and data-driven decision making
Handling grievances involves active listening, empathy, and prompt action to resolve the issue.
Listen actively and empathetically to the employee's complaint.
Investigate the issue thoroughly and gather all relevant information.
Identify the root cause of the grievance and take prompt action to address it.
Communicate clearly and transparently with the employee throughout the process.
Follow up with the employee to ensure ...
Job descriptions should be clear, concise, and accurately reflect the duties and responsibilities of the position.
Start with a clear job title and summary of the position
List the essential duties and responsibilities
Include any necessary qualifications or requirements
Use clear and concise language
Ensure the job description is compliant with company policies and legal requirements
Policy making and implementation should ...
I applied via Walk-in and was interviewed in Oct 2022. There was 1 interview round.
I am a dedicated and experienced Site Engineer with a strong background in construction management.
Bachelor's degree in Civil Engineering
5+ years of experience in site engineering
Proficient in AutoCAD and project management software
Strong communication and problem-solving skills
Managed construction projects such as building a new school and renovating a commercial building
Top trending discussions
posted on 10 Feb 2025
I was interviewed in Jan 2025.
Quantitative reasoning
I applied via Naukri.com and was interviewed in Nov 2024. There were 3 interview rounds.
General aptitude questions.(moderate level)
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
based on 1 interview
Interview experience
based on 18 reviews
Rating in categories
Site Engineer
8
salaries
| ₹2.3 L/yr - ₹6.2 L/yr |
Project Engineer
7
salaries
| ₹3 L/yr - ₹5.1 L/yr |
Safety Officer
7
salaries
| ₹2.5 L/yr - ₹4.5 L/yr |
Design Engineer
5
salaries
| ₹2.9 L/yr - ₹3.1 L/yr |
Senior Safety Officer
5
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Firepro Systems
Ceasefire Industries
Tyco Fire & Security
Honeywell International India