Filter interviews by
I applied via Job Portal and was interviewed in Jul 2024. There were 4 interview rounds.
Site execution, design evaluation, material planning, resource management, strategy management.
Planning session, design discussion, contract term & conditions.
My last and final expectation is to successfully complete the project within the given timeline and budget.
Completion of project within timeline and budget
Achieving project goals and objectives
Ensuring quality deliverables
Effective communication and coordination with team members
Receiving positive feedback from stakeholders
Yes, I currently live in a different state.
Yes, I am currently residing in another state for work purposes.
I have been living in a different state for the past two years.
I am open to relocating for the Project Incharge role.
I am currently working as a Senior Project Manager in a software development company.
Leading a team of developers and ensuring project deadlines are met
Collaborating with clients to gather requirements and provide updates on project progress
Creating project plans, assigning tasks, and monitoring team performance
Conducting regular meetings to discuss project status and address any issues
Managing project budget and resou
I have 5 years of experience in project management, including leading teams and overseeing project timelines.
5 years of experience in project management
Experience in leading teams
Experience in overseeing project timelines
I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.
Yes, I have experience in designing Fire Protection systems.
I have worked on designing fire sprinkler systems for commercial buildings.
I am familiar with NFPA codes and standards related to fire protection.
I have also designed fire alarm systems and emergency lighting systems.
I have collaborated with architects and MEP engineers to ensure fire protection systems are integrated seamlessly into building design.
Top trending discussions
HSE Plan is a document outlining how health, safety, and environmental risks will be managed on a project or in a workplace.
HSE Plan includes identification of hazards and risks
It outlines control measures to mitigate risks
Includes emergency response procedures
Assigns responsibilities to individuals or teams
Regular review and updates are essential
Improving workplace safety culture involves leadership commitment, employee engagement, training, communication, and continuous improvement.
Promote leadership commitment to safety by setting clear expectations and leading by example
Engage employees in safety initiatives through regular communication, feedback mechanisms, and involvement in safety committees
Provide comprehensive safety training for all employees, includ...
Subcontractors can be managed by establishing clear communication, setting expectations, monitoring performance, and providing necessary support.
Establish clear communication channels with subcontractors to ensure alignment on project goals and expectations.
Set clear expectations regarding safety protocols, quality standards, and project timelines.
Regularly monitor subcontractor performance to ensure compliance with HS...
Different types of Permit to Work (PTW) include hot work permit, confined space entry permit, electrical work permit, etc.
Hot work permit
Confined space entry permit
Electrical work permit
Excavation permit
Working at height permit
posted on 21 Dec 2024
posted on 30 Dec 2024
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 2 interview rounds.
ETL stands for Extract, Transform, Load. It is a process used to extract data from various sources, transform it into a consistent format, and load it into a target database or data warehouse.
Extract: Involves extracting data from different sources such as databases, files, APIs, etc.
Transform: Data is cleaned, validated, and transformed into a consistent format suitable for analysis.
Load: The transformed data is loade...
The correct structure of a DBMS diagram includes entities, attributes, relationships, and keys.
Entities represent the main objects in the database (e.g. Customer, Product).
Attributes are characteristics of entities (e.g. CustomerID, ProductName).
Relationships show how entities are related to each other (e.g. one-to-many, many-to-many).
Keys uniquely identify each record in a table (e.g. Primary Key, Foreign Key).
posted on 16 Sep 2024
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
To find the middle of a linked list, use the slow and fast pointer technique.
Initialize two pointers, slow and fast, at the head of the linked list.
Move the slow pointer by one node and the fast pointer by two nodes until the fast pointer reaches the end of the list.
The node pointed to by the slow pointer at this point is the middle of the linked list.
ANR stands for Application Not Responding, it occurs when the main UI thread is blocked for too long.
ANR can be prevented by offloading long-running tasks to background threads or services.
Optimizing code and reducing UI thread workload can also help prevent ANR.
Using tools like StrictMode can help identify potential ANR issues during development.
Threading in Android allows multiple tasks to run concurrently, improving performance and responsiveness.
Threading can be implemented using classes such as AsyncTask, Handler, and Thread.
AsyncTask is used for short background tasks that need to update the UI, while Handler is used for communication between threads.
Thread is a low-level way to create a new thread for longer background tasks.
Care must be taken to avoid m...
ArrayList is faster for accessing elements, while LinkedList is better for frequent insertions and deletions.
ArrayList uses an array to store elements, allowing for fast random access but slower insertions and deletions.
LinkedList uses nodes with references to the next and previous elements, making insertions and deletions faster but access slower.
For example, if you need to frequently add or remove elements in the mid...
ChatGpt will replace the employment
I generate leads through a combination of digital marketing strategies, networking events, and referrals.
Utilize social media platforms to create targeted ads and engage with potential leads
Attend industry conferences and trade shows to network and generate leads
Ask satisfied customers for referrals to expand the lead pool
Heat detectors are devices that sense abnormally high temperatures and are typically used in areas where smoke detectors may not be suitable.
Types of heat detectors include fixed temperature detectors, rate-of-rise detectors, and combination detectors.
Fixed temperature detectors activate when a specific temperature is reached.
Rate-of-rise detectors activate when the temperature increases rapidly.
Combination detectors c...
NWC, NWF, and NWD are different file formats used in BIM modeling.
NWC (Navisworks Cache) is a lightweight file format used for sharing models with stakeholders who do not have access to the original software.
NWF (Navisworks File) is a project file format that references multiple NWD files and allows for collaboration and coordination.
NWD (Navisworks Document) is a published file format that contains all the data and ge
based on 81 reviews
Rating in categories
Project Engineer
16
salaries
| ₹3 L/yr - ₹5.2 L/yr |
Project Manager
12
salaries
| ₹5.7 L/yr - ₹13.5 L/yr |
Safety Engineer
11
salaries
| ₹2.8 L/yr - ₹4.5 L/yr |
Associate Manager
9
salaries
| ₹6.7 L/yr - ₹13.2 L/yr |
Safety Officer
9
salaries
| ₹2.2 L/yr - ₹4.1 L/yr |
Honeywell Automation
Siemens
Johnson Controls Hitachi Air Conditioning
Bosch