Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Tuaman Engineering Team. If you also belong to the team, you can get access from here

Tuaman Engineering Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Tuaman Engineering Resident Construction Manager Interview Questions and Answers

Updated 13 Dec 2022

Tuaman Engineering Resident Construction Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2021. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Construction based questions
Round 3 - Group Discussion 

Construction based questions about previous employment

Round 4 - HR 

(1 Question)

  • Q1. Work culture of previous organizations,opportunities and skill
Round 5 - One-on-one 

(1 Question)

  • Q1. With attending the question of different fields from seniors about site related

Interview Preparation Tips

Interview preparation tips for other job seekers - Best of luck for current endeavors have patience work hard

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Accounts related
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical. Designing. Standard specification, Oil and Gas International (American Petroleum) codes. Din, etc.
  • Q2. HR related

I applied via Company Website and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

12 Questions

  • Q1. 1. Make a layout of combined cycle power plant with different structures and components.
  • Ans. 

    Layout of combined cycle power plant with different structures and components.

    • Combined cycle power plant consists of gas turbine, heat recovery steam generator, and steam turbine.

    • Gas turbine generates electricity by burning natural gas or oil.

    • Heat recovery steam generator recovers waste heat from gas turbine exhaust and generates steam.

    • Steam turbine generates additional electricity using the steam produced by heat reco...

  • Answered by AI
  • Q2. 2 How you design machine foundation for Gas turbine. which are the different types of machine foundations.
  • Ans. 

    Designing machine foundation for gas turbine involves several factors and types of foundations.

    • Factors to consider include soil type, turbine size and weight, seismic activity, and environmental conditions.

    • Types of foundations include block, pile, and raft foundations.

    • Block foundations are suitable for smaller turbines on stable soil.

    • Pile foundations are used for larger turbines or unstable soil.

    • Raft foundations are us...

  • Answered by AI
  • Q3. 3. How you do ductile detailing for beam , column and foundation . which are the IS code you use for ductile detailing.
  • Ans. 

    Ductile detailing for beam, column, and foundation involves following IS codes and ensuring proper reinforcement placement.

    • For beams, IS 13920 is followed and reinforcement is placed at the bottom of the beam.

    • For columns, IS 13920 and IS 456 are followed and reinforcement is placed in a spiral pattern.

    • For foundations, IS 13920 and IS 2911 are followed and reinforcement is placed in a specific pattern based on the type ...

  • Answered by AI
  • Q4. 4.what are the different type of pile foundation and how you design them .
  • Ans. 

    Pile foundations are used to transfer loads from structures to soil. Different types include driven piles, bored piles, and screw piles.

    • Driven piles are installed by hammering or vibrating them into the ground.

    • Bored piles are created by drilling a hole and then filling it with concrete and steel reinforcement.

    • Screw piles are twisted into the ground using a hydraulic motor.

    • Design considerations include soil type, load c...

  • Answered by AI
  • Q5. 5. How you design shear wall and how you detail it .
  • Ans. 

    Shear walls are designed to resist lateral forces. Detailing includes reinforcement placement and anchorage.

    • Design shear walls based on the building code requirements and structural analysis.

    • Select appropriate materials and thickness for the shear wall.

    • Detail the reinforcement placement and anchorage to ensure proper load transfer.

    • Provide adequate boundary elements and openings for ducts and pipes.

    • Consider seismic and ...

  • Answered by AI
  • Q6. 6. which are the different software you are using for structural analysis.
  • Ans. 

    I have experience with various software for structural analysis.

    • STAAD.Pro

    • SAP2000

    • ETABS

    • ANSYS

    • AutoCAD Structural Detailing

  • Answered by AI
  • Q7. 7. How you model raft foundation or shear wall in finet element method.
  • Ans. 

    To model raft foundation or shear wall in finite element method, one needs to follow certain steps.

    • First, create a 3D model of the foundation or wall using a CAD software.

    • Next, import the model into a finite element analysis software.

    • Define the material properties and boundary conditions.

    • Mesh the model to create finite elements.

    • Solve the model to obtain the stresses and displacements.

    • Finally, analyze the results and ma...

  • Answered by AI
  • Q8. 8. How you design water retaining structures. which is the IS code you use for water retaining structures. and what is the crack width for water retaining structures.
  • Ans. 

    Water retaining structures are designed as per IS code and crack width is limited to ensure safety.

    • Design of water retaining structures involves determining the loads, selecting materials, and ensuring stability.

    • IS 3370 is the code used for design of water retaining structures in India.

    • The crack width for water retaining structures is limited to 0.2 mm to ensure safety and prevent leakage.

    • Various types of water retaini...

  • Answered by AI
  • Q9. 9. Have you worked with international codes like American and British codes .
  • Ans. 

    Yes, I have worked with both American and British codes.

    • I have experience working with the International Building Code (IBC) which is based on American codes.

    • I have also worked with British Standards (BS) such as BS 5950 for structural steel design.

    • I am familiar with the differences between the two codes and can adapt accordingly.

  • Answered by AI
  • Q10. 10. What are the different load combination for RCC and Steal structures .
  • Ans. 

    Different load combinations for RCC and Steel structures.

    • Load combinations for RCC structures include dead load, live load, wind load, earthquake load, and temperature load.

    • Load combinations for Steel structures include dead load, live load, wind load, earthquake load, temperature load, and snow load.

    • Load combinations are determined based on the design codes and standards applicable to the project.

    • The load combinations...

  • Answered by AI
  • Q11. 11. Do you have exposure of site inspection and can you make progress and quality report .
  • Ans. 

    Yes, I have extensive experience in site inspections and creating progress and quality reports.

    • I have conducted site inspections for various projects in my previous roles.

    • I am proficient in creating detailed progress and quality reports based on my observations during site inspections.

    • I have also implemented corrective actions based on the findings of my inspections to ensure project success.

    • For example, in my previous...

  • Answered by AI
  • Q12. 12. Draw a bending moment and shear fonce diagram for portal frame with lateral force and UDL .
  • Ans. 

    To draw a bending moment and shear force diagram for a portal frame with lateral force and UDL.

    • Calculate the reactions at the supports

    • Determine the shear force and bending moment at each section

    • Plot the shear force and bending moment diagrams

    • Identify the maximum shear force and bending moment

    • Consider the sign conventions for shear force and bending moment

    • Use appropriate software or tools for accurate results

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - you should be perfect in design aspect and fundamentals, different codes and state of art software which you using.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Project management related questions
Round 2 - Technical 

(1 Question)

  • Q1. Project management
Round 3 - HR 

(1 Question)

  • Q1. General HR questions

I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.

Interview Questionnaire 

10 Questions

  • Q1. We will give only salary, no facilities, no guest house , no HRA, they keep only container at site no office building, transport one car 9 people sitting, no timings, heavy politics
  • Q2. Why to use 24/7 watsapp so many groups messages ?
  • Ans. 

    24/7 WhatsApp groups messages are essential for effective communication and quick decision-making.

    • WhatsApp groups allow for instant communication and collaboration among team members

    • 24/7 availability ensures that urgent matters can be addressed promptly

    • Group messages allow for sharing of important information and updates

    • Reduces the need for lengthy email chains and phone calls

    • Increases efficiency and productivity

    • Exampl...

  • Answered by AI
  • Q3. When you conduct meating with , why you not share MOM and distribute checklist, decsion/ changes taken in meetings if you dont deliver to ground workers , what is pupose of meeting?
  • Q4. Organogram designations should be in this way ,(keypersons) TL, DTL, desiner, planner, contract administrator, surveyor , architect, (profeessional staff ) qs engineer, qc engineer but here TL , Construct...
  • Q5. When nught shifts food not available
  • Ans. 

    Alternative food options will be provided for night shifts.

    • We understand the importance of providing food for our employees, especially during night shifts.

    • We will ensure that alternative food options are available for our employees during night shifts.

    • This may include providing pre-packaged meals or snacks, or arranging for food delivery services.

    • We will work with our employees to ensure that their dietary needs and p...

  • Answered by AI
  • Q6. They will listen only toTL only and no feedback from lower staff
  • Q7. Officer managers, document controller ,office boy , sweepers are not there
  • Q8. No place to eat in the afternoon
  • Q9. No sharing technical codes/training from head office
  • Q10. Politics are heavy

Interview Preparation Tips

Interview preparation tips for other job seekers - be honest

I applied via Referral and was interviewed in May 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical and Managerial.
  • Q2. Software Revit and BIM360

Interview Preparation Tips

Interview preparation tips for other job seekers - Good and thoughtful interview. First was with HR and then the head.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Questions on resource management

Round 2 - Case Study 

Senarios about work and attitue

Interview Preparation Tips

Interview preparation tips for other job seekers - be yourself
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is refrigeration cycle? Commissioning stages of Data center?
  • Ans. 

    The refrigeration cycle is a process that removes heat from a space and transfers it to the external environment.

    • The refrigeration cycle consists of four main components: compressor, condenser, expansion valve, and evaporator.

    • The compressor compresses the refrigerant gas, raising its temperature and pressure.

    • The high-pressure refrigerant then flows to the condenser, where it releases heat to the surroundings and conden...

  • Answered by AI
  • Q2. What is chilled water system? Types of ac system?
  • Ans. 

    A chilled water system is a cooling system that uses chilled water to remove heat from a building or process.

    • Chilled water systems use water as a cooling medium.

    • They typically consist of a chiller, chilled water pumps, and a distribution system.

    • Chilled water is circulated through coils or heat exchangers to cool air or equipment.

    • Chilled water systems are commonly used in large commercial buildings, data centers, and in...

  • Answered by AI
  • Q3. Types of pumps? Types of compressor
  • Ans. 

    Types of pumps include centrifugal pumps, reciprocating pumps, and rotary pumps.

    • Centrifugal pumps use centrifugal force to move fluid through a system.

    • Reciprocating pumps use a piston or diaphragm to create pressure and move fluid.

    • Rotary pumps use rotating mechanisms to transfer fluid.

    • Other types of pumps include gear pumps, peristaltic pumps, and vane pumps.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about yourself.
Study the jd
Introduce yourself in a good way
Dont use extra pause during explanation.
Should be well dressed
Use the language in whic you are comfortable

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Work related and current responsibility
Round 3 - Technical 

(1 Question)

  • Q1. Faculty and experience related

Tuaman Engineering Interview FAQs

How many rounds are there in Tuaman Engineering Resident Construction Manager interview?
Tuaman Engineering interview process usually has 5 rounds. The most common rounds in the Tuaman Engineering interview process are Resume Shortlist, Technical and Group Discussion.
How to prepare for Tuaman Engineering Resident Construction Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Tuaman Engineering. The most common topics and skills that interviewers at Tuaman Engineering expect are Construction Management, Project Management, Budgeting, Site Management and Construction Projects.
What are the top questions asked in Tuaman Engineering Resident Construction Manager interview?

Some of the top questions asked at the Tuaman Engineering Resident Construction Manager interview -

  1. With attending the question of different fields from seniors about site rela...read more
  2. Construction based questi...read more

Tell us how to improve this page.

Tuaman Engineering Resident Construction Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Tuaman Engineering Resident Construction Manager Salary
based on 16 salaries
₹6.2 L/yr - ₹15 L/yr
33% less than the average Resident Construction Manager Salary in India
View more details

Tuaman Engineering Resident Construction Manager Reviews and Ratings

based on 3 reviews

2.3/5

Rating in categories

1.8

Skill development

2.1

Work-life balance

1.8

Salary

1.9

Job security

1.8

Company culture

1.6

Promotions

1.6

Work satisfaction

Explore 3 Reviews and Ratings
Project Engineer
44 salaries
unlock blur

₹3.2 L/yr - ₹7.2 L/yr

Assistant Manager
40 salaries
unlock blur

₹6 L/yr - ₹11.2 L/yr

Deputy Manager
32 salaries
unlock blur

₹5.8 L/yr - ₹11 L/yr

Safety Supervisor
32 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Safety Officer
30 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Explore more salaries
Compare Tuaman Engineering with

Sterling & Wilson

4.1
Compare

Nasser S. Al Hajri Corporation

3.6
Compare

Navayuga Engineering Company

3.9
Compare

B.L. Kashyap & Sons

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview