A project programme is completed by following a structured plan, monitoring progress, addressing issues, and ensuring all tasks are completed on time.
Develop a detailed project plan outlining tasks, timelines, resources, and responsibilities
Monitor progress regularly to ensure tasks are on track and adjust as needed
Address any issues or roadblocks promptly to keep the project on schedule
Ensure all tasks are completed o...
I maintain safety by implementing strict protocols, conducting regular safety training, and ensuring all equipment is up to code.
Implementing strict safety protocols for all employees to follow
Conducting regular safety training sessions to educate employees on best practices
Ensuring all equipment is regularly inspected and up to code
Encouraging open communication about safety concerns and incidents
Regularly reviewing a
I appeared for an interview before Feb 2023.
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers are used to increase or decrease the voltage in an electrical circuit.
They consist of two or more coils of wire, known as windings, that are wound around a core made of magnetic material.
The primary winding is connected to the power source, while the secondary winding is con...
A motor is a device that converts electrical energy into mechanical energy based on the principles of electromagnetism.
A motor consists of a rotor and a stator.
When an electric current flows through the stator windings, it creates a magnetic field.
The interaction between the magnetic field and the rotor's magnetic field causes the rotor to rotate.
Motors can be classified into various types such as DC motors, AC motors,...
MCB stands for Miniature Circuit Breaker. It is an electrical switch designed to protect an electrical circuit from damage caused by overload or short circuit.
MCB is a type of circuit breaker that automatically switches off the electrical circuit when it detects an overload or short circuit.
It is commonly used in residential, commercial, and industrial electrical installations.
MCBs are more compact and efficient compar...
Handling in construction line involves effective planning, communication, problem-solving, and coordination.
Develop a detailed project plan and schedule to ensure smooth execution.
Communicate effectively with team members, contractors, and clients to ensure everyone is on the same page.
Identify and solve problems promptly to avoid delays and cost overruns.
Coordinate with different stakeholders, such as architects, engi...
DG stands for Diesel Generator. It is a backup power source that uses diesel fuel to generate electricity.
DG is an acronym for Diesel Generator.
It is commonly used as a backup power source in case of power outages.
DGs are often used in industries, commercial buildings, hospitals, and residential complexes.
They work on the principle of converting diesel fuel into mechanical energy, which is then converted into electrica...
I applied via LinkedIn and was interviewed in Jul 2023. There were 2 interview rounds.
Tuaman Engineering interview questions for popular designations
I appeared for an interview before Mar 2024, where I was asked the following questions.
As Site Incharge Manager, I oversee project execution, manage teams, and ensure compliance with safety and quality standards.
Project Management: Oversee the planning and execution of construction projects, ensuring they are completed on time and within budget.
Team Leadership: Manage a diverse team of engineers, laborers, and subcontractors, fostering collaboration and productivity.
Safety Compliance: Implement and enfor...
I successfully led a project that improved site efficiency and team collaboration, resulting in a 20% increase in productivity.
Implemented a new scheduling system that reduced downtime by 15%.
Organized team-building activities that enhanced communication and morale.
Introduced safety protocols that led to zero accidents over six months.
Streamlined reporting processes, allowing for quicker decision-making.
I applied via Referral and was interviewed in Oct 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.
JSA is Job Safety Analysis and HIRA is Hazard Identification and Risk Assessment. Lifting plan is a document that outlines the safe lifting procedures.
JSA is a process of identifying potential hazards and risks associated with a specific job or task
HIRA is a systematic approach to identify, assess and control hazards and risks in the workplace
Lifting plan is a document that outlines the safe lifting procedures, includi...
I applied via Approached by Company and was interviewed before Dec 2022. There were 3 interview rounds.
To attract candidates while sourcing, use targeted job advertisements, showcase company culture, offer competitive compensation and benefits, and leverage social media platforms.
Create targeted job advertisements to reach the desired candidate pool
Highlight the company's unique culture and values to attract candidates who align with them
Offer competitive compensation and benefits packages to entice candidates
Utilize so...
I applied via Walk-in and was interviewed in Jul 2022. There was 1 interview round.
Top trending discussions
The duration of Tuaman Engineering interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 12 interviews
Interview experience
based on 315 reviews
Rating in categories
Assistant Manager
48
salaries
| ₹6 L/yr - ₹11.2 L/yr |
Project Engineer
44
salaries
| ₹3.2 L/yr - ₹7.2 L/yr |
Safety Supervisor
32
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Deputy Manager
31
salaries
| ₹5.8 L/yr - ₹10 L/yr |
Safety Officer
30
salaries
| ₹2 L/yr - ₹6 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
B.L. Kashyap & Sons