TSN INFRASTRUCTURE Civil Site Execution Engineer Interview Questions, Process, and Tips

Updated 2 Sep 2024

TSN INFRASTRUCTURE Civil Site Execution Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is steel weight
  • Ans. 

    Steel weight refers to the mass of steel used in a structure or component.

    • Steel weight is typically measured in kilograms or pounds.

    • The weight of steel can vary depending on the type of steel used and the dimensions of the structure.

    • Calculating steel weight involves multiplying the volume of steel by its density.

    • Steel weight is an important factor in structural engineering to ensure the stability and safety of a buildi...

  • Answered by AI
  • Q2. What is the grade of m20 concrete
  • Ans. 

    The grade of M20 concrete refers to the mix ratio of cement, sand, and aggregate used in the concrete mix.

    • M20 concrete has a mix ratio of 1:1.5:3 (1 part cement, 1.5 parts sand, 3 parts aggregate)

    • The compressive strength of M20 concrete is 20 MPa (Megapascals) after 28 days of curing

    • M20 concrete is commonly used for residential construction like foundations, slabs, and columns

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Minimum 12 mm column use in structure
  • Ans. 

    Minimum 12 mm column is used in structures for providing adequate strength and stability.

    • Minimum 12 mm column is used to ensure structural integrity and load-bearing capacity.

    • Thicker columns are typically used in high-rise buildings or structures with heavy loads.

    • Reinforcement bars of 12 mm diameter or larger are commonly used in column construction.

  • Answered by AI
  • Q2. What density of steel
  • Ans. 

    The density of steel varies depending on the type of steel, typically ranging from 7,750 to 8,050 kg/m^3.

    • The density of steel is usually around 7,750 to 8,050 kg/m^3.

    • Different types of steel may have slightly different densities.

    • Density is an important factor to consider in structural engineering and construction.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Very nice

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the grade of concrete
  • Ans. 

    The grade of concrete refers to its strength and is determined by the ratio of cement to sand to aggregate.

    • The grade of concrete is typically denoted by a number followed by the letter 'M', such as M20, M30, etc.

    • The number in the grade represents the compressive strength of the concrete in megapascals (MPa) after 28 days of curing.

    • For example, M20 concrete has a compressive strength of 20 MPa, while M30 concrete has a ...

  • Answered by AI
  • Q2. What is the unit used for estimating painting work?
  • Ans. 

    The unit used for estimating painting work is square feet.

    • Square feet is commonly used to estimate the amount of paint needed for a project.

    • Other units like square meters can also be used depending on the region.

    • Calculations are based on the surface area to be painted.

  • Answered by AI
  • Q3. What you mean by RL in survey
  • Ans. 

    RL in survey stands for Reduced Level, which is the vertical distance between a point and a reference point.

    • RL is used in surveying to determine the elevation of a point relative to a known reference point.

    • It is commonly used in construction projects to ensure accurate leveling of structures and surfaces.

    • RL can be calculated using leveling instruments such as a dumpy level or a theodolite.

    • For example, if a benchmark ha...

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Types of cement
  • Ans. 

    Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement.

    • Portland cement is the most common type and is used in general construction.

    • Rapid-hardening cement sets quickly and is often used in repair work.

    • Sulfate-resistant cement is used in areas where soil or water has high sulfate content.

  • Answered by AI
  • Q2. Size of columns
  • Ans. 

    The size of columns in civil engineering is determined based on the load they will support and the height of the structure.

    • Columns are sized based on the load they will support, with larger loads requiring larger columns.

    • The height of the structure also plays a role in determining column size, with taller structures requiring larger columns for stability.

    • Factors such as material strength, column spacing, and building c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for the basic civil engineering concept and knowledge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

General knowledge skills

Round 2 - Technical 

(5 Questions)

  • Q1. Your previous company experience
  • Ans. 

    Worked as a Project Engineer at a construction company for 5 years.

    • Managed multiple civil engineering projects simultaneously

    • Coordinated with architects, contractors, and clients to ensure project success

    • Performed site inspections and quality control checks

    • Prepared project schedules and budgets

    • Resolved any issues or conflicts that arose during construction

  • Answered by AI
  • Q2. Asking your previous work experience
  • Q3. Structure related questions
  • Q4. Finishing related question
  • Q5. Water proofing related question and Bbs

Interview Preparation Tips

Interview preparation tips for other job seekers - Development your technical knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Explain mivan slab cycle
  • Ans. 

    Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.

    • Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.

    • The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.

    • This method is efficient, cost-effective, and results in high-quality finishes.

    • Mivan slab cycle reduces construction time ...

  • Answered by AI
  • Q2. What will you ensure before concreting
  • Ans. 

    Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.

    • Check formwork for proper alignment and stability

    • Ensure reinforcement bars are correctly placed as per design

    • Verify concrete mix design meets project specifications

    • Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Expected salary if selected
  • Ans. 

    My expected salary is based on my qualifications, experience, and the industry standards.

    • I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.

    • I have researched the average salary range for Civil Site Engineers in this region and industry.

    • I am open to negotiation based on the overall compensation package offered by the company.

    • I am looking for a salary that aligns w...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Abt work Experience?
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. My experience & my qualification &my knowledge
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. What is your work experience
  • Ans. 

    I have over 10 years of experience in civil engineering, managing various construction projects.

    • Managed construction projects from start to finish

    • Coordinated with architects, engineers, and contractors

    • Ensured projects were completed on time and within budget

    • Handled permits, inspections, and regulatory compliance

    • Implemented safety protocols and quality control measures

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About your self
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

Quality control and waste management

Round 2 - Aptitude Test 

Maths reasoning and core subjects

Interview Preparation Tips

Topics to prepare for Godrej Properties Civil Engineer interview:
  • RCC
Interview preparation tips for other job seekers - Many questions related to ambition box
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about your experience?
  • Q2. What salary you expect from us ?

TSN INFRASTRUCTURE Interview FAQs

How many rounds are there in TSN INFRASTRUCTURE Civil Site Execution Engineer interview?
TSN INFRASTRUCTURE interview process usually has 2 rounds. The most common rounds in the TSN INFRASTRUCTURE interview process are Technical.
What are the top questions asked in TSN INFRASTRUCTURE Civil Site Execution Engineer interview?

Some of the top questions asked at the TSN INFRASTRUCTURE Civil Site Execution Engineer interview -

  1. What is the grade of m20 concr...read more
  2. Minimum 12 mm column use in struct...read more
  3. What density of st...read more

Tell us how to improve this page.

TSN INFRASTRUCTURE Civil Site Execution Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 341 Interviews
CBRE Interview Questions
4.2
 • 254 Interviews
NoBroker Interview Questions
3.2
 • 225 Interviews
Sobha Interview Questions
3.9
 • 124 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
DLF Interview Questions
4.0
 • 73 Interviews
Kalpataru Group Interview Questions
4.0
 • 69 Interviews
View all
Project Manager
5 salaries
unlock blur

₹4.5 L/yr - ₹9 L/yr

Senior Accountant
4 salaries
unlock blur

₹4.2 L/yr - ₹4.2 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹4 L/yr - ₹5 L/yr

Site Engineer
3 salaries
unlock blur

₹2.4 L/yr - ₹3.6 L/yr

Quality Engineer
3 salaries
unlock blur

₹4.8 L/yr - ₹5.6 L/yr

Explore more salaries
Compare TSN INFRASTRUCTURE with

JLL

4.1
Compare

CBRE

4.2
Compare

Square Yards

4.0
Compare

NoBroker

3.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview