Filter interviews by
Be the first one to contribute and help others!
posted on 2 Mar 2025
I was interviewed before Mar 2024.
posted on 28 Jan 2025
I was interviewed in Dec 2024.
I was interviewed in Jan 2025.
Aptitude questions will give
Two codes will give and we can write in any language
I was interviewed in Dec 2024.
Is easy 60 marks question in 60 min
I was interviewed in Jan 2025.
posted on 1 Dec 2024
I applied via Walk-in and was interviewed in Nov 2024. There were 2 interview rounds.
Folks,
Prepare the below topics very well.
1. Engineering mechanics
2. GD and T
3. Strength of materials
4. Manufacturing process
5. Tolerance stack up analysis
6. Engineering drawing
I had prepared them but still unable to clear the paper cause questions were tricky enough to answer.
I hope this helps you better for practice.
All the best “Brothers, Sister and Friends”.
posted on 12 Jan 2025
I applied via Times Job
OEE is a measure of how well a manufacturing process is utilized, calculated by multiplying availability, performance, and quality.
OEE is calculated by multiplying Availability x Performance x Quality.
Availability measures the percentage of time the equipment is running during planned production time.
Performance measures the speed at which the equipment is running compared to its maximum speed.
Quality measures the good...
5S is a methodology for organizing a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate needed tools, parts, and instructions from unneeded items. Remove unnecessary items from the work area.
Set in order: Arrange items so they are easy to use. Identify and locate items with labels and visual controls.
Shine: Clean ...
We are currently working on drilling, milling, tapping, and slotting machining processes.
Drilling involves creating holes in a workpiece using a rotating cutting tool.
Milling is the process of removing material from a workpiece using a rotating cutter.
Tapping is the process of creating internal threads in a hole.
Slotting involves cutting slots or grooves in a workpiece.
Setting up a new machine for production involves installing necessary software, configuring settings, and testing functionality.
Install required operating system and software
Configure network settings and security measures
Test machine functionality to ensure it meets production requirements
8D is a problem-solving methodology used to identify, correct, and prevent recurring problems. SPC stands for Statistical Process Control.
8D is an eight-step problem-solving process used to address and prevent recurring issues in a systematic manner.
SPC is a method of quality control which uses statistical tools to monitor and control a process.
Examples of SPC tools include control charts, histograms, and scatter diagr
Kaizens are continuous improvement initiatives aimed at enhancing processes and efficiency. The number of completed kaizens in a year reflects the organization's commitment to improvement.
Kaizens are small, incremental changes made to processes to improve efficiency and quality.
They are typically implemented by cross-functional teams and involve brainstorming, testing, and implementing solutions.
Examples of kaizens inc...
based on 13 reviews
Rating in categories
Production Engineer
4
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Assistant Manager
3
salaries
| ₹4.4 L/yr - ₹4.5 L/yr |
Junior Engineer
3
salaries
| ₹2.9 L/yr - ₹3 L/yr |
Quality Engineer
3
salaries
| ₹2.5 L/yr - ₹3.5 L/yr |
QA Engineer
3
salaries
| ₹3.9 L/yr - ₹6.5 L/yr |
Tata Advanced Systems
Hindustan Aeronautics
Honeywell Technology Solutions
GE