Upload Button Icon Add office photos

Filter interviews by

Tribeni Construction Interview Questions and Answers

Updated 23 Mar 2024

Tribeni Construction Interview Experiences

Popular Designations

2 interviews found

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Civil ,BBS, Drowning, Design mix concrete
  • Q2. Tem management, group work
  • Q3. Daily Progress Report
  • Q4. Checklist concrete construction
  • Q5. Maintenance Registra work

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (66)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. How to your expected slary
  • Ans. 

    I am looking for a competitive salary based on my experience and qualifications.

    • Research industry standards for Survey Engineers salaries

    • Consider your level of experience and qualifications

    • Negotiate based on the responsibilities and expectations of the role

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company

Survey Engineer Interview Questions asked at other Companies

Q1. What's is traversing, and describe it how to it calculate data.....
View answer (1)

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Asked about previous experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about what u know

I applied via Walk-in and was interviewed in Apr 2021. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Details of precast structures (Segment)
  • Ans. 

    Precast structures are pre-made concrete elements used in construction.

    • Precast segments are manufactured off-site and transported to the construction site for assembly.

    • They are commonly used in bridge construction, tunnels, and other large-scale infrastructure projects.

    • Precast segments can be designed to fit specific project requirements, reducing construction time and costs.

    • They offer high durability and strength, and...

  • Answered by AI
  • Q2. Which method use for segment casting?
  • Ans. 

    Segment casting can be done using various methods depending on the material and application.

    • One method is sand casting, where a mold is created using sand and the molten metal is poured into it.

    • Another method is investment casting, where a wax pattern is created and coated with ceramic before the metal is poured.

    • Die casting is a method where molten metal is forced into a mold under high pressure.

    • Continuous casting is u...

  • Answered by AI
  • Q3. Grade of concrete.
  • Ans. 

    Grade of concrete refers to its strength and durability.

    • Grade of concrete is denoted by a number followed by 'M' which stands for mix.

    • The number represents the compressive strength of concrete in megapascals (MPa).

    • Common grades of concrete include M10, M20, M30, etc.

    • Higher grade concrete has higher strength and durability.

    • For example, M20 grade concrete has a compressive strength of 20 MPa.

  • Answered by AI
  • Q4. Design mix of concrete.
  • Ans. 

    Design mix of concrete refers to the proportion of materials used in making concrete.

    • Design mix is determined based on the strength and durability requirements of the concrete.

    • The mix includes cement, water, aggregates (sand, gravel, crushed stone), and sometimes admixtures.

    • The proportions of each material are specified in terms of weight or volume.

    • For example, a common mix for general use is 1:2:3 (cement:sand:gravel)...

  • Answered by AI
  • Q5. Method of segment casting.
  • Ans. 

    Segment casting is a method of casting concrete segments for tunnel lining.

    • Segments are cast in a factory and transported to the tunnel site.

    • Segments are then assembled to form a complete tunnel lining.

    • This method is commonly used in tunnel construction projects.

    • It allows for faster construction and better quality control.

    • Examples include the Channel Tunnel and the SMART Tunnel in Malaysia.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge of autocad, bbs, excel and word.

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How about your previous company experience?
  • Q2. I was tell about my roles and what type of work I have done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Very easy interview questions I had faced.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Brief about my work experience
  • Ans. I explained my experience in Highways & structures
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - NEC ltd is wonderful company and excellent working culture.

Interview Questionnaire 

1 Question

  • Q1. Tell me about the project in your resume and your role in it

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well on technical aspects in your project
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Project details
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Stress strain curves
  • Q2. Asme codes for oil and gas
  • Ans. 

    ASME codes are widely used in the oil and gas industry to ensure safety and quality standards are met.

    • ASME B31.3 is the code for process piping in oil and gas facilities

    • ASME Section VIII is used for pressure vessels in oil and gas industry

    • ASME B31.4 is for liquid pipelines in oil and gas industry

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Accounts related

Tribeni Construction Interview FAQs

How many rounds are there in Tribeni Construction interview?
Tribeni Construction interview process usually has 2 rounds. The most common rounds in the Tribeni Construction interview process are Resume Shortlist and Technical.
What are the top questions asked in Tribeni Construction interview?

Some of the top questions asked at the Tribeni Construction interview -

  1. How to your expected sl...read more
  2. Civil ,BBS, Drowning, Design mix concr...read more
  3. Checklist concrete construct...read more

Tell us how to improve this page.

Tribeni Construction Interview Process

based on 5 interviews

Interview experience

4
  
Good
View more

Tribeni Construction Reviews and Ratings

based on 60 reviews

3.7/5

Rating in categories

3.3

Skill development

3.4

Work-life balance

3.0

Salary

3.2

Job security

3.2

Company culture

2.9

Promotions

3.4

Work satisfaction

Explore 60 Reviews and Ratings
Civil Site Engineer
39 salaries
unlock blur

₹1.7 L/yr - ₹4.3 L/yr

Site Engineer
14 salaries
unlock blur

₹1.8 L/yr - ₹3.6 L/yr

Project Manager
11 salaries
unlock blur

₹6 L/yr - ₹15 L/yr

Civil Engineer
11 salaries
unlock blur

₹2.2 L/yr - ₹3.8 L/yr

Project Engineer
7 salaries
unlock blur

₹3.5 L/yr - ₹5.6 L/yr

Explore more salaries
Compare Tribeni Construction with

Sterling & Wilson

4.1
Compare

Nasser S. Al Hajri Corporation

3.6
Compare

Navayuga Engineering Company

3.9
Compare

B.L. Kashyap & Sons

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview