Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 3 interview rounds.
GD&T is a symbolic language used to specify the geometric tolerances of a part. Least material count is the minimum amount of material required to meet the design requirements. Angularity is the tolerance for the angle between two surfaces.
GD&T stands for Geometric Dimensioning and Tolerancing
It is used to define the allowable variation in form, size, orientation, and location of features on a part
Symbols are used to r...
MIG and MAG welding differ in the type of shielding gas used. CO2 is preferred over Argon due to its cost-effectiveness. Efficiency depends on the application.
MIG welding uses a mixture of Argon and CO2, while MAG welding uses pure CO2
CO2 is preferred over Argon due to its lower cost and higher penetration power
Efficiency of the mixture depends on the application and the type of metal being welded
For example, a higher ...
Explanation of 8D, A3, action plan and demonstration of an action plan using pen and paper and 7QC tools.
8D is a problem-solving methodology used to identify, correct and prevent recurring problems.
A3 is a structured problem-solving approach that uses a single sheet of paper to document the problem, analysis, and solution.
An action plan is a detailed plan outlining actions needed to achieve a specific goal or objective...
FoA, MoA, LoA are types of documents used in quality engineering.
FoA stands for Field of Application, which defines the scope and limitations of a product or process.
MoA stands for Method of Analysis, which outlines the procedures and techniques used to analyze a product or process.
LoA stands for Limit of Acceptance, which specifies the acceptable range or criteria for a product or process.
Other types of documents in q...
1. Nugget test
2. Penetration test .
3. Welding process
4. Tensile strength
5. Alloy
I applied via Walk-in and was interviewed before Nov 2021. There were 3 interview rounds.
OEE stands for Overall Equipment Effectiveness and PPM stands for Parts Per Million.
OEE is a metric used to measure the productivity of a manufacturing process.
It takes into account three factors: availability, performance, and quality.
PPM is a measure of the number of defective parts per million produced.
It is commonly used in quality control and Six Sigma methodologies.
KPI stands for Key Performance Indicator and TPM stands for Total Productive Maintenance.
KPI is a measurable value that indicates how well an organization is achieving its business objectives.
TPM is a maintenance strategy that aims to maximize the productivity of equipment by reducing downtime and improving efficiency.
KPIs can be financial or non-financial, and can be used to track progress towards goals and identify a...
Top trending discussions
I was interviewed in Jan 2025.
I was interviewed in Jan 2025.
I was interviewed in Jan 2025.
I was interviewed in Jan 2025.
A sequence was provided: 4181, 2684, 1597, 987, 610.
first 2 are given and write code for other value calculation using java 8
The second question required writing a reverse of a palindrome using both Java 8 streams. I was able to successfully write both and clear the first round.
Java 17 introduces sealed classes to restrict inheritance and improve code maintainability.
Sealed classes are declared using the 'sealed' keyword followed by the permitted subclasses.
Subclasses of a sealed class must be either final or sealed themselves.
Errors may occur when trying to extend a sealed class with a non-permitted subclass.
Implementation of 'notify me if item is back in stock' feature in an ecommerce application
Create a database table to store user notifications for out-of-stock items
Implement a service to check item availability and send notifications to subscribed users
Provide a user interface for users to subscribe to notifications for specific items
I was interviewed in Jan 2025.
posted on 6 Jan 2025
I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.
The number of variances in SAP can vary depending on the specific processes and transactions being analyzed.
The number of variances in SAP can be influenced by factors such as data entry errors, system glitches, or discrepancies in invoice processing.
Variances in SAP may be identified through reconciliation processes, exception reports, or manual reviews of accounts payable transactions.
Examples of variances in SAP inc...
Accounts receivable and accounts payable are two important aspects of a company's financial operations.
Accounts receivable refers to money owed to a company by its customers for goods or services provided.
Accounts payable refers to money owed by a company to its suppliers or vendors for goods or services received.
Accounts receivable is an asset on the balance sheet, while accounts payable is a liability.
Managing accoun...
Cost element and cost center are key concepts in accounting for tracking and allocating costs within an organization.
Cost element refers to the specific types of costs incurred by an organization, such as materials, labor, or overhead.
Cost center is a specific department, team, or function within an organization that is responsible for incurring costs.
Cost elements are assigned to cost centers to track and allocate cos...
SAP supports over 160 currencies worldwide.
SAP supports over 160 currencies for global transactions.
Currencies can be configured in SAP using transaction code OB22.
Each currency is assigned a unique currency code (e.g. USD for US Dollar, EUR for Euro).
There are various types of projects, including internal projects, external projects, research projects, and development projects.
Internal projects focus on improving processes within the organization.
External projects involve working with external partners or clients.
Research projects aim to gather data and analyze findings.
Development projects focus on creating new products or services.
Examples: IT system implementati...
I was interviewed in Jan 2025.
Some of the top questions asked at the Toyo Sharda interview -
based on 34 reviews
Rating in categories
Junior Engineer
16
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Diploma Trainee Engineer
11
salaries
| ₹1.5 L/yr - ₹2.2 L/yr |
Senior Engineer
9
salaries
| ₹4.5 L/yr - ₹7.2 L/yr |
Assistant Manager
6
salaries
| ₹5.5 L/yr - ₹11.5 L/yr |
Engineer
6
salaries
| ₹2.8 L/yr - ₹5.3 L/yr |
TCS
Accenture
Wipro
Cognizant