I applied via Naukri.com and was interviewed in May 2024. There were 5 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Discussed about previous experience, Salary, ask question related previous working experience and explained their company
Round 2 - Technical 

(2 Questions)

  • Q1. Taken by senior Manager asked Questions regarding billing process software using rates
  • Q2. RegardingJob role , Process
Round 3 - Technical 

(1 Question)

  • Q1. This round taken by VP they asked some technical questions regarding QS construction field rates and procedures
Round 4 - Assignment 

They given some assignments regarding their company

Round 5 - HR 

(1 Question)

  • Q1. Final HR they asked Questions like why you change the job like that and discussed about salary

Interview Preparation Tips

Topics to prepare for Total Environment Building Systems Senior QS and Billing Engineer interview:
  • Quantity Surveyor Activities
  • Civil Engineering
  • Procurement
Interview preparation tips for other job seekers - One of the good experiences with this interview all are very friendly very good responses from interviewer

Interview questions from similar companies

I applied via Company Website and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Type of work I am doing in previous company
  • Q2. All construction activities I handeld

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company & Good Culture
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025.

Round 1 - Technical 

(3 Questions)

  • Q1. Basic fundamentals of plumbing and fire fighting system.
  • Q2. Fire pump room single line diagram and working.
  • Ans. 

    A fire pump room single line diagram illustrates the components and flow of water in fire protection systems.

    • Includes main components: fire pump, controller, water supply, and discharge piping.

    • Fire pump types: centrifugal, positive displacement, each suited for different applications.

    • Controller manages pump operation, ensuring automatic activation during fire alarms.

    • Water supply sources: municipal water, tanks, or rese...

  • Answered by AI
  • Q3. Fire pump technical data sheet detail.
Round 2 - Group Discussion 

Plumbing and fire fighting NBC code Standard etc.

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion.
  • Q2. Why to join our organisation.
  • Ans. 

    I am excited to join your organization for its innovative projects, collaborative culture, and commitment to professional growth.

    • Innovative Projects: Your organization is known for cutting-edge technology, such as the recent AI-driven solutions that enhance user experience.

    • Collaborative Culture: I appreciate the emphasis on teamwork, as seen in your recent cross-departmental project that improved product delivery times...

  • Answered by AI

Junior Engineer Interview Questions & Answers

Nyati Group user image Chandan Shirbhayye

posted on 16 Mar 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. Have you ever used ERP ? And which one
  • Q2. Tell me about your past experience in your previous company

Interview Preparation Tips

Interview preparation tips for other job seekers - For junior level you will get good experience in this company
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Procedure for building construction
  • Ans. 

    The procedure for building construction involves several steps and processes.

    • Developing a project plan and obtaining necessary permits

    • Clearing the construction site and preparing the foundation

    • Constructing the structural framework and installing utilities

    • Completing interior and exterior finishes

    • Conducting inspections and obtaining certificates of occupancy

    • Handing over the completed building to the owner

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. How much experience in finishing work
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Aug 2024. There were 3 interview rounds.

Round 1 - Group Discussion 

Plaster wall thickness 6mm slab bottom
12mm plaster smooth surface

Round 2 - Case Study 

Cube test after 7 day nd 14 day

Round 3 - Case Study 

Slump cone test true

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Normal question about your experience and profile
Round 3 - HR 

(1 Question)

  • Q1. After hr interview they forward to you for technical round

Interview Preparation Tips

Interview preparation tips for other job seekers - Knightfrank is a good company but they will provide multiple locations for work.

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Primavera Schedule preparation
  • Q2. Cost review techniques
  • Ans. 

    Cost review techniques are used to evaluate and analyze project costs.

    • Cost-benefit analysis

    • Earned value management

    • Variance analysis

    • Life cycle costing

    • Activity-based costing

  • Answered by AI
  • Q3. Time delay analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to have grip on Primavera scheduling
Earned value analysis
Planning basics
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Tell me about your self
  • Q2. Density of building materials
  • Ans. 

    Building materials have varying densities depending on their composition.

    • Density is the mass per unit volume of a material.

    • Common building materials and their densities include concrete (2.4 g/cm³), brick (1.9-2.2 g/cm³), and wood (0.5-0.8 g/cm³).

    • Density affects the strength and durability of a structure, as well as its weight and cost.

  • Answered by AI
  • Q3. Billing procedure of your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not join if they told you to join in contracting division.

Total Environment Building Systems Interview FAQs

How many rounds are there in Total Environment Building Systems Senior QS and Billing Engineer interview?
Total Environment Building Systems interview process usually has 5 rounds. The most common rounds in the Total Environment Building Systems interview process are HR, Technical and Assignment.
What are the top questions asked in Total Environment Building Systems Senior QS and Billing Engineer interview?

Some of the top questions asked at the Total Environment Building Systems Senior QS and Billing Engineer interview -

  1. This round taken by VP they asked some technical questions regarding QS constru...read more
  2. Taken by senior Manager asked Questions regarding billing process software usin...read more
  3. RegardingJob role , Proc...read more

Tell us how to improve this page.

Total Environment Building Systems Senior QS and Billing Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

InvestoXpert Interview Questions
4.1
 • 63 Interviews
M3M India Interview Questions
4.1
 • 48 Interviews
Knight Frank Interview Questions
4.0
 • 45 Interviews
Smartworks Interview Questions
3.6
 • 33 Interviews
Aliens Group Interview Questions
3.2
 • 30 Interviews
Nyati Group Interview Questions
4.2
 • 29 Interviews
Berkadia Interview Questions
3.9
 • 28 Interviews
SMEC Interview Questions
3.7
 • 27 Interviews
Xanadu Interview Questions
3.5
 • 26 Interviews
View all

Total Environment Building Systems Senior QS and Billing Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.0

Salary

4.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
141 salaries
unlock blur

₹4.8 L/yr - ₹12 L/yr

Senior Executive
47 salaries
unlock blur

₹3.8 L/yr - ₹7.3 L/yr

Manager
43 salaries
unlock blur

₹8 L/yr - ₹18 L/yr

Senior Manager
23 salaries
unlock blur

₹9.2 L/yr - ₹24 L/yr

BIM Modeller
23 salaries
unlock blur

₹4 L/yr - ₹8 L/yr

Explore more salaries
Compare Total Environment Building Systems with

Knight Frank

4.0
Compare

M3M India

4.1
Compare

R.S. Infraprojects

3.9
Compare

SMEC

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview