Filter interviews by
Clear (1)
posted on 17 Feb 2021
I applied via Campus Placement and was interviewed before Feb 2020. There was 1 interview round.
Top trending discussions
posted on 18 Jun 2021
I applied via Recruitment Consultant and was interviewed in May 2021. There was 1 interview round.
Achieving 0% ppm (parts per million) is a goal for ensuring high quality in production processes.
ppm is a measurement used to quantify defects or errors in a production process
Achieving 0% ppm means that there are no defects or errors in the produced items
This requires implementing robust quality control measures and continuous improvement
Examples of quality control measures include thorough inspections, standardized p
The candidate should demonstrate their ability to manage small problems in production and material planning.
Provide examples of small problems that you have successfully managed in the past
Explain your problem-solving approach and how you prioritize tasks
Highlight your ability to work under pressure and meet deadlines
Discuss any relevant technical skills or tools you utilize in problem management
posted on 15 Dec 2020
I applied via Naukri.com and was interviewed before Dec 2019. There were 3 interview rounds.
Takt time is the rate at which a product must be produced to meet customer demand.
Takt time is calculated by dividing the available production time by the customer demand.
It helps in determining the production rate needed to meet customer demand.
Takt time is used in lean manufacturing to eliminate waste and improve efficiency.
For example, if the customer demand is 100 units per day and the available production time is ...
Line balancing is the process of evenly distributing work tasks among production line workers.
Line balancing aims to minimize idle time and maximize productivity.
It involves analyzing the tasks required in a production process and assigning them to workers in a way that optimizes efficiency.
The goal is to ensure that each worker has a similar workload and that no worker becomes a bottleneck.
Line balancing can be achiev...
Man management is the process of effectively leading and directing a team of individuals towards achieving a common goal.
It involves motivating and inspiring team members
It requires effective communication and delegation skills
It involves setting clear goals and expectations
It requires the ability to handle conflicts and resolve issues
It involves providing feedback and recognition to team members
Examples include managi...
I applied via Company Website and was interviewed in Dec 2022. There were 3 interview rounds.
Self introduction and education and family background and 5s
I applied via Walk-in and was interviewed before Oct 2023. There was 1 interview round.
Shift ownership issues can arise due to miscommunication, lack of accountability, or unclear procedures.
Ensure clear communication about shift responsibilities and handover procedures
Establish accountability among team members for their assigned shifts
Implement a system for tracking shift ownership and handovers
Address any conflicts or misunderstandings promptly to prevent escalation
posted on 21 Mar 2024
I applied via Walk-in
Technical skills about maching process
About presonal detail.
I appeared for an interview in Feb 2023.
posted on 9 Sep 2020
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 4 interview rounds.
posted on 13 Apr 2022
I applied via Campus Placement and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 19 Mar 2022
I applied via Company Website
Junior Engineer
143
salaries
| ₹1.7 L/yr - ₹4.2 L/yr |
Production Engineer
74
salaries
| ₹2.8 L/yr - ₹4.8 L/yr |
Engineer
72
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Senior Engineer
41
salaries
| ₹4.8 L/yr - ₹6.8 L/yr |
Assistant Manager
38
salaries
| ₹5.9 L/yr - ₹11.5 L/yr |
Bosch
Continental
Samvardhana Motherson Group
ZF Commercial Vehicle Control Systems