Upload Button Icon Add office photos

Filter interviews by

The Braithwaite Burn & Jessop Construction Company Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Quantitative reasoning

Round 2 - One-on-one 

(5 Questions)

  • Q1. About yourself and past experiences.
  • Q2. Managerial round
  • Q3. About company information
  • Q4. About yourself and extracurricular activities
  • Q5. See yourself in the next 5 yrs

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for questions.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at SRM Institute of Science & Technology, Chennai and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. TYPES OF STARTERS
  • Ans. 

    Starters are devices used to start and control the speed of induction motors.

    • Direct On-Line (DOL) starter: provides full voltage to the motor at start

    • Star-Delta starter: reduces the starting current by initially connecting the motor in star configuration

    • Auto-transformer starter: uses an auto-transformer to reduce the voltage during starting

    • Soft starter: gradually increases the voltage to the motor to reduce starting cu...

  • Answered by AI
  • Q2. Types and methods of earthing
  • Ans. 

    Earthing is the process of connecting electrical systems to the ground to prevent electric shock and protect equipment.

    • Types of earthing include plate earthing, pipe earthing, rod earthing, and strip earthing.

    • Methods of earthing include neutral earthing, equipment earthing, and system earthing.

    • Earthing is essential for safety in electrical systems to prevent electric shock and damage to equipment.

    • Proper earthing ensure...

  • Answered by AI
  • Q3. Principle and types of TF
  • Ans. 

    TF stands for Transformer. It is a static device used to transfer electrical energy between two or more circuits through electromagnetic induction.

    • Principle of TF involves Faraday's law of electromagnetic induction.

    • Types of TF include step-up, step-down, isolation, auto-transformer, etc.

    • TFs are used in power distribution, voltage regulation, impedance matching, etc.

  • Answered by AI
  • Q4. Starting current of dol starter
  • Ans. 

    The starting current of a DOL starter is typically 6-8 times the rated current of the motor.

    • The Direct-On-Line (DOL) starter is used to start induction motors.

    • The starting current of a DOL starter is usually 6-8 times the rated current of the motor.

    • This high starting current can cause voltage drops and stress on the electrical system.

  • Answered by AI
  • Q5. How to choose the Ac cables
  • Ans. 

    Choose AC cables based on current rating, insulation material, and environmental conditions.

    • Consider the current rating of the cable to ensure it can handle the load

    • Choose the appropriate insulation material based on the application and environment

    • Take into account environmental conditions such as temperature, moisture, and exposure to chemicals

    • Select the right cable size to minimize voltage drop and power loss

    • Ensure c...

  • Answered by AI
  • Q6. Basic electric questions like ohms law formula

Interview Preparation Tips

Interview preparation tips for other job seekers - BE PREPARED , Asking aboug basic electrical questions
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is job safety analysis
  • Ans. 

    Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.

    • Involves breaking down a job task into steps

    • Identifying potential hazards for each step

    • Determining preventive measures to reduce risks

    • Ensures workers are aware of safety procedures

    • Examples: construction site JSA, manufacturing plant JSA

  • Answered by AI
  • Q2. What is hazard identification and risk assessment
  • Ans. 

    Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.

    • Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.

    • Risk assessment involves evaluating the likelihood and severity of harm from these hazards.

    • The goal is to implement con...

  • Answered by AI
  • Q3. What is fire safety
  • Ans. 

    Fire safety refers to measures taken to prevent and protect against the risks of fire.

    • Fire safety includes having working smoke detectors in place.

    • It also involves creating and practicing a fire escape plan.

    • Proper storage and handling of flammable materials is crucial for fire safety.

    • Regular maintenance of fire extinguishers and other fire safety equipment is important.

    • Training employees on fire safety protocols is ess

  • Answered by AI
  • Q4. Accident investigation
  • Q5. What is hazard site
  • Ans. 

    A hazard site is a location where there is a potential risk of harm to people, property, or the environment.

    • Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.

    • These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.

    • Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.

    • Examples of h...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is bar bending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.

    • It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.

    • Helps in estimating the quantity of steel required for construction.

    • Ensures proper placement and bending of reinforcement bars as per design specifications.

    • Used by contractors, engineers, and construction workers for re...

  • Answered by AI
  • Q2. 28 days concrete strength
  • Ans. 

    28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.

    • 28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing

    • It is important for assessing the quality of concrete and its ability to support structural loads

    • The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing

  • Answered by AI
  • Q3. Difference between mivan and conventional
  • Ans. 

    Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

    • Mivan is faster and more efficient than conventional construction methods.

    • Mivan requires skilled labor for installation of aluminum formwork.

    • Conventional construction is more labor-intensive and time-consuming.

    • Mivan provides better quality finishes compared to conventional...

  • Answered by AI
  • Q4. What is self leveling concrete
  • Ans. 

    Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

    • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

    • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

    • Self leveling concrete can be applied in thicknesses ranging from a featheredg...

  • Answered by AI
  • Q5. How many days will take 1st Aluform mockup Concreting
  • Ans. 

    The 1st Aluform mockup concreting typically takes 1-2 days to complete.

    • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

    • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

    • Proper planning and coordination can help expedite the process

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shimizu Senior Site Engineer interview:
  • Construction
  • Structural
  • Quality Control
  • Quality Assurance
  • Bar Bending Schedule
  • Project Execution
Interview preparation tips for other job seekers - Be active and action to learn every step and work hard and smart . Please ensure technical criticis and how it resolve it
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Whats LEL tell procedures
  • Ans. 

    LEL stands for Lower Explosive Limit, which is the minimum concentration of a gas or vapor in air that will ignite if a source of ignition is present.

    • LEL is used to determine the potential for a fire or explosion in a confined space.

    • Procedures for LEL testing involve using gas detection equipment to measure the concentration of a specific gas in the air.

    • If the LEL of a gas is exceeded, it indicates a potentially hazard...

  • Answered by AI
  • Q2. Tel us the control of confind
  • Ans. 

    Control of confined spaces is essential for ensuring the safety of workers in potentially hazardous environments.

    • Implementing a permit-to-work system to control access to confined spaces

    • Conducting thorough risk assessments before entry

    • Providing appropriate training for workers on confined space entry procedures

    • Using gas detectors and ventilation systems to monitor and control atmospheric conditions

    • Having a rescue plan

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How many grade of Bitumen ?
  • Ans. 

    There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.

    • VG-10: Suitable for low-traffic roads

    • VG-20: Suitable for medium-traffic roads

    • VG-30: Suitable for high-traffic roads

    • VG-40: Suitable for heavy-duty traffic areas like airports and container terminals

  • Answered by AI
  • Q2. What is the compressive strength of cement mortar cube 3 days
  • Ans. 

    The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.

    • Compressive strength of cement mortar cube is an important parameter to assess its quality and durability

    • The strength of cement mortar increases with age, so 3 days is an early testing point

    • Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Describe your previous role
  • Ans. 

    Managed full-cycle recruitment process for various positions in a fast-paced tech company

    • Led recruitment efforts for technical roles such as software engineers and data scientists

    • Collaborated with hiring managers to understand hiring needs and develop job descriptions

    • Sourced candidates through various channels including job boards, social media, and employee referrals

    • Conducted phone screens, interviews, and assessments...

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. It was more deep interview to understand the areas that I have worked .

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a treat experience and they had communicated the result promptly
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Jun 2024. There were 4 interview rounds.

Round 1 - Aptitude Test 

The test was about our basic core engineering concepts (Electrical and Electronics Engineering)

Round 2 - Group Discussion 

The Group Discussion topic was Dine in or take away

Round 3 - Presentation 

(1 Question)

  • Q1. No questions asked
Round 4 - HR 

(1 Question)

  • Q1. Self introduction.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. What is earthwork
  • Ans. 

    Earthwork refers to the process of moving, excavating, and compacting soil and rock to prepare the ground for construction.

    • Earthwork involves activities such as excavation, grading, compaction, and backfilling.

    • It is essential for creating a stable foundation for roads, buildings, and other structures.

    • Earthwork also includes the removal of unwanted materials and the addition of necessary materials to achieve the desired...

  • Answered by AI
  • Q2. What is GSB wmm
  • Ans. 

    GSB stands for Granular Sub Base and WMM stands for Wet Mix Macadam. GSB WMM is a type of road construction method using layers of granular materials.

    • GSB is the layer of granular material placed on the subgrade of a road to provide a stable foundation.

    • WMM is a mixture of aggregates, filler, and water laid on the GSB layer to form a strong base for the road.

    • GSB WMM construction involves compacting each layer properly to...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil field all the best

Tell us how to improve this page.

The Braithwaite Burn & Jessop Construction Company Reviews and Ratings

based on 4 reviews

4.5/5

Rating in categories

2.8

Skill development

2.9

Work-Life balance

2.9

Salary & Benefits

2.2

Job Security

2.4

Company culture

2.2

Promotions/Appraisal

3.1

Work Satisfaction

Explore 4 Reviews and Ratings
Assistant Project Engineer
4 salaries
unlock blur

₹4 L/yr - ₹10 L/yr

Senior Engineer
3 salaries
unlock blur

₹4 L/yr - ₹5 L/yr

Project Engineer
3 salaries
unlock blur

₹6 L/yr - ₹10 L/yr

Deputy Manager
3 salaries
unlock blur

₹15 L/yr - ₹17 L/yr

Explore more salaries
Compare The Braithwaite Burn & Jessop Construction Company with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.1
Compare

ABCI Infrastructures

3.5
Compare

R.V.R. PROJECTS

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview