Quantitative reasoning
posted on 26 Oct 2024
I applied via campus placement at SRM Institute of Science & Technology, Chennai and was interviewed in Sep 2024. There was 1 interview round.
Starters are devices used to start and control the speed of induction motors.
Direct On-Line (DOL) starter: provides full voltage to the motor at start
Star-Delta starter: reduces the starting current by initially connecting the motor in star configuration
Auto-transformer starter: uses an auto-transformer to reduce the voltage during starting
Soft starter: gradually increases the voltage to the motor to reduce starting cu...
Earthing is the process of connecting electrical systems to the ground to prevent electric shock and protect equipment.
Types of earthing include plate earthing, pipe earthing, rod earthing, and strip earthing.
Methods of earthing include neutral earthing, equipment earthing, and system earthing.
Earthing is essential for safety in electrical systems to prevent electric shock and damage to equipment.
Proper earthing ensure...
TF stands for Transformer. It is a static device used to transfer electrical energy between two or more circuits through electromagnetic induction.
Principle of TF involves Faraday's law of electromagnetic induction.
Types of TF include step-up, step-down, isolation, auto-transformer, etc.
TFs are used in power distribution, voltage regulation, impedance matching, etc.
The starting current of a DOL starter is typically 6-8 times the rated current of the motor.
The Direct-On-Line (DOL) starter is used to start induction motors.
The starting current of a DOL starter is usually 6-8 times the rated current of the motor.
This high starting current can cause voltage drops and stress on the electrical system.
Choose AC cables based on current rating, insulation material, and environmental conditions.
Consider the current rating of the cable to ensure it can handle the load
Choose the appropriate insulation material based on the application and environment
Take into account environmental conditions such as temperature, moisture, and exposure to chemicals
Select the right cable size to minimize voltage drop and power loss
Ensure c...
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
LEL stands for Lower Explosive Limit, which is the minimum concentration of a gas or vapor in air that will ignite if a source of ignition is present.
LEL is used to determine the potential for a fire or explosion in a confined space.
Procedures for LEL testing involve using gas detection equipment to measure the concentration of a specific gas in the air.
If the LEL of a gas is exceeded, it indicates a potentially hazard...
Control of confined spaces is essential for ensuring the safety of workers in potentially hazardous environments.
Implementing a permit-to-work system to control access to confined spaces
Conducting thorough risk assessments before entry
Providing appropriate training for workers on confined space entry procedures
Using gas detectors and ventilation systems to monitor and control atmospheric conditions
Having a rescue plan
posted on 19 Sep 2024
There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.
VG-10: Suitable for low-traffic roads
VG-20: Suitable for medium-traffic roads
VG-30: Suitable for high-traffic roads
VG-40: Suitable for heavy-duty traffic areas like airports and container terminals
The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.
Compressive strength of cement mortar cube is an important parameter to assess its quality and durability
The strength of cement mortar increases with age, so 3 days is an early testing point
Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa
posted on 4 Aug 2024
Managed full-cycle recruitment process for various positions in a fast-paced tech company
Led recruitment efforts for technical roles such as software engineers and data scientists
Collaborated with hiring managers to understand hiring needs and develop job descriptions
Sourced candidates through various channels including job boards, social media, and employee referrals
Conducted phone screens, interviews, and assessments...
posted on 3 Jul 2024
I applied via Campus Placement and was interviewed in Jun 2024. There were 4 interview rounds.
The test was about our basic core engineering concepts (Electrical and Electronics Engineering)
The Group Discussion topic was Dine in or take away
posted on 15 Aug 2024
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
Earthwork refers to the process of moving, excavating, and compacting soil and rock to prepare the ground for construction.
Earthwork involves activities such as excavation, grading, compaction, and backfilling.
It is essential for creating a stable foundation for roads, buildings, and other structures.
Earthwork also includes the removal of unwanted materials and the addition of necessary materials to achieve the desired...
GSB stands for Granular Sub Base and WMM stands for Wet Mix Macadam. GSB WMM is a type of road construction method using layers of granular materials.
GSB is the layer of granular material placed on the subgrade of a road to provide a stable foundation.
WMM is a mixture of aggregates, filler, and water laid on the GSB layer to form a strong base for the road.
GSB WMM construction involves compacting each layer properly to...
based on 4 reviews
Rating in categories
Assistant Project Engineer
4
salaries
| ₹4 L/yr - ₹10 L/yr |
Senior Engineer
3
salaries
| ₹4 L/yr - ₹5 L/yr |
Project Engineer
3
salaries
| ₹6 L/yr - ₹10 L/yr |
Deputy Manager
3
salaries
| ₹15 L/yr - ₹17 L/yr |
Lea Associates South Asia
McNally Bharat Engineering
ABCI Infrastructures
R.V.R. PROJECTS