Filter interviews by
Be the first one to contribute and help others!
I applied via Approached by Company and was interviewed in Jul 2022. There were 3 interview rounds.
A CNC machine can have 3, 4, or 5 axes depending on its configuration.
The X, Y, and Z axes are common in 3-axis machines.
4-axis machines add a rotary axis, usually the A-axis.
5-axis machines add a second rotary axis, usually the B-axis.
Some machines may have additional axes for specialized operations, such as milling machines with a tilting spindle head.
The number of axes determines the machine's capabilities and the c
Maintenance procedure involves regular inspection, cleaning, repair and replacement of equipment to ensure optimal performance and prevent breakdowns.
Create a maintenance schedule based on manufacturer recommendations and equipment usage
Perform regular inspections to identify potential issues before they become major problems
Clean and lubricate equipment as needed to prevent wear and tear
Repair or replace damaged or wo...
The question is incomplete or incorrect. There is no such term as 'back las'.
There is no known term or phrase as 'back las'.
It is possible that the interviewer made a mistake or was trying to ask a different question.
As a maintenance engineer, it is important to clarify any unclear or confusing questions to ensure accurate responses.
Types of maintenance include corrective, preventive, predictive, and proactive maintenance.
Corrective maintenance involves fixing a problem after it has occurred.
Preventive maintenance involves regularly scheduled maintenance to prevent problems from occurring.
Predictive maintenance involves using data and analytics to predict when maintenance is needed.
Proactive maintenance involves identifying and addressing potentia...
The number of points in a PM checklist varies depending on the equipment being checked.
PM checklists are specific to each piece of equipment.
The number of points in a PM checklist can range from a few to hundreds.
Points in a PM checklist can include tasks such as inspecting, cleaning, and lubricating equipment.
The purpose of a PM checklist is to ensure that equipment is properly maintained and to prevent breakdowns.
The...
Machines need regular preventive maintenance (PM) to ensure optimal performance and longevity.
Regular cleaning and lubrication
Inspection and replacement of worn parts
Calibration and adjustment of sensors and controls
Testing and monitoring of performance
Documentation of maintenance activities
Training of operators and maintenance staff
MTTR stands for Mean Time To Repair and MTBF stands for Mean Time Between Failures.
MTTR is the average time taken to repair a failed system or equipment.
MTBF is the average time between two consecutive failures of a system or equipment.
MTTR is used to measure the efficiency of maintenance and repair processes.
MTBF is used to measure the reliability of a system or equipment.
MTBF = (total operating time - total downtime)...
MTTR is the average time to repair a failed system while MTBF is the average time between failures.
MTTR measures the maintainability of a system while MTBF measures its reliability.
MTTR is calculated by dividing the total downtime by the number of failures while MTBF is calculated by dividing the total uptime by the number of failures.
MTTR is usually shorter than MTBF as it only measures the time to repair a failed sys...
Breakdown is an unexpected failure of equipment or machinery. KPI stands for Key Performance Indicator, a measurable value that indicates how well a company is achieving its goals.
Breakdown can cause production delays and loss of revenue
KPIs can be used to track maintenance performance and identify areas for improvement
Examples of KPIs for maintenance include equipment uptime, mean time between failures, and maintenanc
I applied via LinkedIn and was interviewed before Mar 2020. There was 1 interview round.
Assignments with Reasoning and maths etc.
posted on 27 Jun 2022
I applied via Campus Placement and was interviewed in May 2022. There were 2 interview rounds.
I applied via Job Fair and was interviewed before Mar 2020. There were 3 interview rounds.
posted on 19 Nov 2020
I applied via Campus Placement and was interviewed before Nov 2019. There were 6 interview rounds.
I applied via Walk-in and was interviewed in Aug 2021. There were 3 interview rounds.
posted on 28 Jun 2020
I applied via Walk-in and was interviewed before Jun 2019. There was 1 interview round.
My family has a diverse background with members involved in various professions and industries.
My father is a doctor and my mother is a teacher.
My older brother is an engineer and my younger sister is studying to become a lawyer.
We have relatives who are business owners, artists, and government employees.
Our family values education and encourages pursuing different career paths.
I applied via Company Website and was interviewed in Aug 2021. There were 3 interview rounds.
I applied via campus placement at Kakatiya University
Sheet metal operations involve cutting, bending, and shaping metal sheets to create various products.
Sheet metal cutting can be done through various methods such as laser cutting, plasma cutting, and waterjet cutting.
Bending is done using press brakes or rollers to create angles and curves in the metal.
Shaping involves techniques such as deep drawing, spinning, and punching to create complex shapes and designs.
Sheet me...
I see myself in a leadership role, leading a team and driving the growth and success of the organization.
Leading a team
Driving growth and success
Taking on a leadership role
Continuing professional development
Contributing to the organization's strategic goals
My short term goal is to gain practical experience and develop my skills in the field. My long term goal is to take on leadership roles and make a positive impact in the organization.
Short term goal: Gain practical experience and develop skills
Long term goal: Take on leadership roles and make a positive impact
Examples: Short term - Complete training programs, work on real projects. Long term - Become a team leader, con
based on 4 reviews
Rating in categories
Senior Engineer
4
salaries
| ₹4.2 L/yr - ₹5.4 L/yr |
Senior QA QC Engineer
4
salaries
| ₹3.8 L/yr - ₹7.2 L/yr |
SAP end User
4
salaries
| ₹3 L/yr - ₹3 L/yr |
Assistant Manager
3
salaries
| ₹7.2 L/yr - ₹11.5 L/yr |
Mechanical Engg. Design
3
salaries
| ₹3 L/yr - ₹7 L/yr |
Yazaki
Delphi TVS
JK Tyres
Lucas-TVS