Upload Button Icon Add office photos

Filter interviews by

Technoculture Building Center Civil Site Engineer Interview Questions and Answers

Updated 28 Aug 2022

Technoculture Building Center Civil Site Engineer Interview Experiences

1 interview found

I applied via Company Website and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Tecnical term and buildind construction
  • Q2. Tecnical term and building construction

Interview Preparation Tips

Interview preparation tips for other job seekers - I want to civil site Engineering job and construction work

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Past work experience and some technical work related questions

I applied via Approached by Company and was interviewed before May 2021. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Related to civil site or interior work also
Round 2 - Technical 

(1 Question)

  • Q1. Estimation & costing of materials related to civil works
  • Ans. 

    Estimation and costing of materials is a crucial aspect of civil engineering projects.

    • Estimation involves calculating the quantity of materials required for a project

    • Costing involves determining the cost of these materials

    • Factors such as market rates, transportation costs, and taxes must be considered

    • Software such as AutoCAD and Excel can be used for accurate estimation and costing

    • Regular updates and adjustments must b...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. To about my past work experience details
  • Q2. Ask me about my communication skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on your target and go hard untill success

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Start to bottom rcc work up to finishing work
  • Q2. Finishing sequence(block work- concild zari -waterproof work-concild piping, electrical work- internal gypsum., dado work, painting work

Interview Preparation Tips

Interview preparation tips for other job seekers - Experience of building &infrastructure execution work
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction, previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Past experience and rates

Interview Preparation Tips

Interview preparation tips for other job seekers - Pressure will be more, since i worked in engineering team compare to others contracts department will be feeling the pressure more

I applied via Referral and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. What are your salary expectations?
  • Q2. What are your strengths and weaknesses?
  • Q3. Tell me about yourself.
  • Q4. Why are you looking for a change?
  • Q5. Why should we hire you?
  • Q6. Share details of your previous job.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest and truth to what you know and what you have gone through your career .they will definitely helps you
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Estimation and budget related
Round 2 - Technical 

(1 Question)

  • Q1. Basic process follows while billing and budgeting
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Previous experience
  • Q2. About previous project
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Reconciliation format with example of construction materials
  • Q2. Types of foundation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .

Technoculture Building Center Interview FAQs

How many rounds are there in Technoculture Building Center Civil Site Engineer interview?
Technoculture Building Center interview process usually has 1 rounds. The most common rounds in the Technoculture Building Center interview process are Technical.
What are the top questions asked in Technoculture Building Center Civil Site Engineer interview?

Some of the top questions asked at the Technoculture Building Center Civil Site Engineer interview -

  1. Tecnical term and buildind construct...read more
  2. Tecnical term and building construct...read more

Tell us how to improve this page.

Technoculture Building Center Civil Site Engineer Salary
based on 28 salaries
₹1.2 L/yr - ₹5.2 L/yr
22% less than the average Civil Site Engineer Salary in India
View more details

Technoculture Building Center Civil Site Engineer Reviews and Ratings

based on 11 reviews

3.0/5

Rating in categories

2.8

Skill development

2.5

Work-life balance

2.4

Salary

2.8

Job security

3.0

Company culture

2.4

Promotions

2.8

Work satisfaction

Explore 11 Reviews and Ratings
Civil Site Engineer
28 salaries
unlock blur

₹1.2 L/yr - ₹5.2 L/yr

Accountant
15 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Executive Accountant
8 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Project Manager
5 salaries
unlock blur

₹2.4 L/yr - ₹4.6 L/yr

Senior Accountant
5 salaries
unlock blur

₹1.8 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Technoculture Building Center with

JLL

4.1
Compare

CBRE

4.2
Compare

NoBroker

3.2
Compare

Lodha Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview