Filter interviews by
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
Designing an exchanger involves determining the heat transfer area, fluid flow rates, and selecting appropriate materials.
Determine the heat transfer area required based on the heat duty and the overall heat transfer coefficient.
Calculate the fluid flow rates and pressure drops for both the hot and cold fluids.
Select appropriate materials based on the process conditions and compatibility with the fluids.
Consider factor...
Final OPOT of a column can be achieved through proper planning and execution.
Ensure proper alignment and positioning of the column
Check for any defects or damages in the column
Ensure proper reinforcement and formwork
Pour concrete in stages and compact it properly
Allow sufficient time for curing
Perform necessary tests and inspections before finalizing OPOT
I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.
Design parameters for steel structure
Load capacity and distribution
Material strength and durability
Environmental factors such as wind and seismic activity
Connection details and joint design
Fire resistance and protection measures
I have 5 years of exposure to STAAD software.
I have used STAAD for various structural analysis and design projects.
I am proficient in using STAAD for modeling, analysis, and design of steel and concrete structures.
I have experience in using STAAD for seismic analysis and design of structures.
I have also used STAAD for foundation design and analysis.
I keep myself updated with the latest versions and features of STAAD so
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
posted on 14 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
posted on 23 Aug 2023
Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.
Design a set of experiments based on a factorial design
Collect data from the experiments
Fit a regression model to the data
Analyze the model to determine optimal input settings for the response variable
I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.
I was interviewed in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
posted on 27 Aug 2015
Process Engineer
127
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
117
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Principal Engineer
108
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Designer
99
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
92
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Energy Hydrocarbon
Baker Hughes
McDermott International
Saipem