Upload Button Icon Add office photos

Tata Steel

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Clear (1)

Tata Steel QA QC Engineer Interview Questions and Answers

Updated 1 Sep 2023

Tata Steel QA QC Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. How does your job role makes you technically sound? Mechanical properties of the alloys and how to test them? Technical achievements in your job field?
  • Ans. 

    My job role as a QA QC Engineer has made me technically sound by providing me with in-depth knowledge of mechanical properties of alloys and testing methods.

    • Regularly conducting tests on various alloys to determine their mechanical properties such as strength, hardness, and ductility

    • Utilizing testing methods such as tensile testing, hardness testing, impact testing, and metallography to assess the quality of alloys

    • Anal...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Why do you want to join us? What are your expectations from us?

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare thoroughly about the fundamentals and basics.

Rate your
company

🤫 100% anonymous

How was your last interview experience?

Share interview

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Mechanical testing
  • Q2. Like Api audit , NABL audit , ISO and safety
  • Q3. Quality manual,Quality objective, histogram,sop
  • Q4. Standards and specification
  • Q5. Internal audit,capa,moc,policy,

Interview Preparation Tips

Interview preparation tips for other job seekers - Job Responsibilities • Preparation update & Maintaining documentation as per ISO 9001:2015 quality management’s system requirements. Engaged in preparing the quality assurance plan, manufacturing procedure specification (MPs) as per the customer specification & reviewing of process chart for every work order released in shop floor. • Involved in preparation of system documents like Quality Manual, Quality system procedure, Control future for all Department documents. • Prepare all standard operating procedures of each working station as per API & ISO and maintaining same in one location in system to seen to every plant user. • Coordination for all the internal audit and external audit as per schedule with auditor and maintain all documents. • Analyzing the customer complaints by root cause analysis, corrective actions, preventive actions (preparation & implementation). • Follow up and comply of corrective action taken by the individual departments in case of any NCR issued during the audit. • Conducting plant surveillance audits during order execution.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Not Selected

I applied via Company Website

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(6 Questions)

  • Q1. Qc testing & chemical preparation
  • Q2. All qc incoming & out going material known testing done
  • Q3. All qc out going material to be complain attend near in party ( for testing) All qc incoming material to be joint analysis attend near in both party ( for testing)
  • Q4. Material stock yard visiting to do everyday Railway side visiting to do everyday
  • Q5. All qc finish product material to be complain attend from party
  • Q6. Stock yard & railway side visiting will be everyday

Interview Preparation Tips

Topics to prepare for Jindal Steel and Power QA QC Engineer interview:
  • Sponge Iron
  • Pellet Plant
  • Ferro Alloys
  • Benefication
  • Raw Material
  • Coal washery
Interview preparation tips for other job seekers - All qc testing & chemical preparation done
All ncoming & out going material testing done

I applied via Company Website and was interviewed before May 2018. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is lean and six sigma
  • Ans. 

    Lean and Six Sigma are methodologies used to improve processes and reduce waste.

    • Lean focuses on eliminating waste and increasing efficiency in processes

    • Six Sigma focuses on reducing defects and improving quality

    • Both methodologies use data analysis and continuous improvement to achieve their goals

    • Example: Lean can be used to streamline a manufacturing process by eliminating unnecessary steps

    • Example: Six Sigma can be use...

  • Answered by AI
  • Q2. 7 QC tools, DI pipe, metalargical

Interview Preparation Tips

Don't join Rashmi Metaliks, poor work culture, salary not in a time.. Management is worse..
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Discussed at infrastructure

Round 2 - Technical 

(3 Questions)

  • Q1. Technical field related questions
  • Q2. HR related questions.
  • Q3. AI related questions
Round 3 - HR 

(1 Question)

  • Q1. HR related questions
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to check the motor
  • Ans. 

    To check the motor, you can perform various tests and inspections to ensure it is functioning properly.

    • Check for any physical damage or wear on the motor casing

    • Inspect the wiring connections for any loose or damaged wires

    • Measure the voltage and current going into the motor to ensure it is within the specified range

    • Test the motor's insulation resistance to check for any faults

    • Run the motor under load to see if it operat

  • Answered by AI
  • Q2. How to do power analysis
  • Ans. 

    Power analysis involves measuring and analyzing the electrical power consumption of a system or device.

    • Identify the components of the system or device that consume power.

    • Measure the current and voltage across these components using appropriate instruments.

    • Calculate the power consumption using the formula P = VI, where P is power, V is voltage, and I is current.

    • Analyze the power consumption data to identify any ineffici...

  • Answered by AI
  • Q3. What is tranfamer
  • Ans. 

    A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers are used to increase or decrease voltage levels in electrical circuits.

    • They consist of two coils of wire, known as the primary and secondary coils.

    • Examples of transformers include power transformers used in electrical substations and voltage transformers in electronic devices.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I need to Mony
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via JSL's own Job portal. and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(12 Questions)

  • Q1. What is Pipe Layout.
  • Ans. 

    Pipe layout refers to the arrangement and positioning of pipes in a system to ensure efficient flow of fluids or gases.

    • Pipe layout involves determining the route, size, and elevation of pipes within a system.

    • Consideration must be given to factors such as pressure drop, flow rate, and accessibility for maintenance.

    • Proper pipe layout can optimize system performance and minimize potential issues such as leaks or blockages

  • Answered by AI
  • Q2. Why Position Displacement Pumps are used for Hydraulic.
  • Ans. 

    Position displacement pumps are used for hydraulic systems due to their ability to provide precise control over fluid flow and pressure.

    • Position displacement pumps offer accurate and repeatable flow rates, making them ideal for applications requiring precise control.

    • These pumps are capable of maintaining constant pressure, which is crucial in hydraulic systems to ensure consistent performance.

    • Position displacement pump...

  • Answered by AI
  • Q3. Brief about pipe scheduled.
  • Ans. 

    Pipe schedule refers to the wall thickness of pipes used in various industries.

    • Pipe schedule is a way to standardize the thickness of pipes for different applications.

    • It is denoted by a number followed by 'S' (e.g. Schedule 40, Schedule 80).

    • Higher schedule numbers indicate thicker walls for higher pressure applications.

    • Pipe schedules are important for ensuring compatibility and safety in piping systems.

  • Answered by AI
  • Q4. Procedure of Replacement of Pump in a Hydraulic System.
  • Ans. 

    The procedure for replacing a pump in a hydraulic system involves draining the system, disconnecting the old pump, installing the new pump, and refilling the system.

    • Drain the hydraulic system to prevent spills and contamination.

    • Disconnect the old pump from the system by removing any connecting hoses or pipes.

    • Install the new pump in the same location as the old pump, ensuring proper alignment and connection.

    • Refill the h...

  • Answered by AI
  • Q5. How System Pressure is set in a Hydraulic system.
  • Ans. 

    System pressure in a hydraulic system is set using a pressure relief valve or a pressure regulator.

    • System pressure can be set using a pressure relief valve which opens to release excess pressure.

    • A pressure regulator can also be used to control the pressure by adjusting the setting.

    • The pressure setting is typically determined based on the requirements of the hydraulic system and the components used.

    • Monitoring devices su...

  • Answered by AI
  • Q6. What is TIG welding and why is it widely used in Jointing Hydraulic Pipes.
  • Ans. 

    TIG welding is a welding process that uses a non-consumable tungsten electrode to produce the weld. It is widely used in jointing hydraulic pipes due to its precision and clean welds.

    • TIG welding stands for Tungsten Inert Gas welding.

    • It uses a non-consumable tungsten electrode to create the weld.

    • TIG welding produces high-quality, clean welds with minimal spatter.

    • The process allows for precise control over the welding ar...

  • Answered by AI
  • Q7. What are the procedures of cleaning pipe lines.
  • Ans. 

    Cleaning pipe lines involves various procedures such as flushing, pigging, and chemical cleaning.

    • Flushing involves using water or air pressure to remove debris and buildup from the pipes.

    • Pigging uses a device called a 'pig' to scrape the inside of the pipe and push out any blockages.

    • Chemical cleaning involves using specific chemicals to dissolve and remove stubborn deposits in the pipes.

    • Regular maintenance and inspecti...

  • Answered by AI
  • Q8. What is NAS value and why its important to achieve with in standard limits.
  • Ans. 

    NAS value is a measure of network-attached storage performance and reliability, important to achieve within standard limits for optimal data storage and access.

    • NAS value stands for Network-Attached Storage value, which measures the performance and reliability of a storage system.

    • It is important to achieve NAS value within standard limits to ensure optimal data storage and access speeds.

    • Exceeding NAS value limits can re...

  • Answered by AI
  • Q9. How Conveyor alignment is done.
  • Ans. 

    Conveyor alignment is done by adjusting the idlers and pulleys to ensure the belt runs straight and centered on the conveyor frame.

    • Check for any misalignment by observing the belt's position on the idlers.

    • Adjust the idlers and pulleys to ensure the belt runs straight and centered.

    • Use alignment tools such as laser alignment devices for precision.

    • Regularly inspect and maintain the conveyor system to prevent misalignment ...

  • Answered by AI
  • Q10. What are the factors and its requirements to procure a Conveyor belt.
  • Ans. 

    Factors and requirements for procuring a conveyor belt

    • Consider the type of material being transported

    • Determine the required capacity and speed of the conveyor belt

    • Evaluate the environment where the conveyor belt will be used (e.g. temperature, humidity)

    • Assess the maintenance and operating costs of the conveyor belt

    • Check the safety features and regulations compliance of the conveyor belt

    • Look into the reputation and reli...

  • Answered by AI
  • Q11. Types of Coupling uses and the procedure of alignment.
  • Ans. 

    Couplings are used to connect two shafts together while allowing for some degree of misalignment. Alignment is crucial for proper functioning.

    • Types of couplings include rigid, flexible, fluid, and magnetic couplings.

    • Procedure for alignment involves checking shaft alignment using tools like dial indicators, laser alignment systems, or straightedges.

    • Alignment process includes adjusting shims, moving machinery, and rechec...

  • Answered by AI
  • Q12. What is a Rapid wagon loading system.
  • Ans. 

    A rapid wagon loading system is a technology used to quickly load goods onto train wagons for transportation.

    • Utilizes automated machinery to load goods efficiently

    • Reduces loading time significantly compared to manual loading

    • Commonly used in industries such as mining, agriculture, and logistics

    • Examples include conveyor belt systems, robotic arms for loading, and automated palletizing systems

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Machine transmission distribution
  • Q2. Electric generation
  • Q3. Electric measurement

Interview Preparation Tips

Interview preparation tips for other job seekers - Junior electric Engineer
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Electrical department
  • Q2. What is MCC PCC PANEL
  • Ans. 

    MCC stands for Motor Control Center and PCC stands for Power Control Center. They are electrical panels used to control and distribute power to motors and other electrical equipment.

    • MCC panels are used to control and distribute power to motors in industrial settings.

    • PCC panels are used to control and distribute power to various electrical equipment.

    • Both panels play a crucial role in ensuring efficient and safe operatio...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. (1) tell your self, (2) Passt company work, (3) what is VFD and it's diagram, (4) Electrical maintenance related questions
  • Q2. Motor related questions
  • Q3. MCC and PCC panel
Round 3 - HR 

(1 Question)

  • Q1. (1) Salary discussion, (2) Experience related questions
Contribute & help others!
anonymous
You can choose to be anonymous

Tata Steel Interview FAQs

How many rounds are there in Tata Steel QA QC Engineer interview?
Tata Steel interview process usually has 3 rounds. The most common rounds in the Tata Steel interview process are HR, Resume Shortlist and Technical.

Recently Viewed

SALARIES

NAU Spa

No Salaries

SALARIES

Growthally Advisors

SALARIES

RVN Group

REVIEWS

VSM Software

No Reviews

SALARIES

Alphaslate Technology

No Salaries

SALARIES

JPC & Associates

Tell us how to improve this page.

Tata Steel QA QC Engineer Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

Anonymously discuss salaries, work culture, and many more

Get Ambitionbox App

Interview Questions from Similar Companies

JSW Steel Interview Questions
3.9
 • 577 Interviews
Jindal Stainless Interview Questions
4.2
 • 202 Interviews
JSW Group Interview Questions
3.9
 • 106 Interviews
Jindal Saw Interview Questions
4.0
 • 97 Interviews
Rashmi Metaliks Interview Questions
3.4
 • 76 Interviews
Viraj Profiles Interview Questions
3.8
 • 72 Interviews
View all
Tata Steel QA QC Engineer Salary
based on 34 salaries
₹2.2 L/yr - ₹9.5 L/yr
14% less than the average QA QC Engineer Salary in India
View more details

Tata Steel QA QC Engineer Reviews and Ratings

based on 8 reviews

4.1/5

Rating in categories

4.0

Skill development

3.6

Work-life balance

3.1

Salary

4.0

Job security

3.1

Company culture

2.6

Promotions

3.7

Work satisfaction

Explore 8 Reviews and Ratings
Manager
1.6k salaries
unlock blur

₹6 L/yr - ₹20.5 L/yr

Assistant Manager
1.4k salaries
unlock blur

₹5.2 L/yr - ₹15.5 L/yr

Senior Manager
1.2k salaries
unlock blur

₹9.2 L/yr - ₹35 L/yr

Junior Engineer
907 salaries
unlock blur

₹2 L/yr - ₹10 L/yr

Associate Engineer
882 salaries
unlock blur

₹2 L/yr - ₹7.8 L/yr

Explore more salaries
Compare Tata Steel with

JSW Steel

3.9
Compare

Steel Authority Of India

4.1
Compare

Vedanta Limited

3.8
Compare

ArcelorMittal Nippon Steel

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent