Premium Employer

i

This company page is being actively managed by Tata Projects Team. If you also belong to the team, you can get access from here

Tata Projects Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Tata Projects Quaity Control Engineer Interview Questions and Answers for Freshers

Updated 26 Sep 2024

Tata Projects Quaity Control Engineer Interview Experiences for Freshers

1 interview found

Quaity Control Engineer Interview Questions & Answers

user image Krishna Mani Tripathi

posted on 20 Jul 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. What application of curing compound
  • Ans. 

    Curing compounds are used in construction to retain moisture in concrete during the curing process.

    • Curing compounds are applied to the surface of freshly placed concrete to prevent moisture loss.

    • They form a membrane that retains moisture and allows the concrete to properly cure.

    • Curing compounds help in reducing cracks, improving strength, and enhancing durability of concrete.

    • Examples of curing compounds include acrylic

  • Answered by AI
  • Q2. Required Slump Value of pumping concrete
  • Ans. 

    The required slump value of pumping concrete depends on the distance and height of the pump.

    • The required slump value for pumping concrete increases with the distance and height the concrete needs to be pumped.

    • A higher slump value is needed for longer horizontal distances and taller vertical heights.

    • Consult the concrete mix design specifications and pump manufacturer guidelines for the recommended slump value.

  • Answered by AI
  • Q3. What aggregate crossing value
  • Ans. 

    Aggregate crossing value is a measure used in quality control to assess the strength of aggregates in construction materials.

    • Aggregate crossing value is a parameter used to evaluate the quality of aggregates in construction materials.

    • It is calculated by determining the percentage of aggregate particles that pass through specific sieve sizes.

    • A higher aggregate crossing value indicates a higher quality of aggregates.

    • Aggr...

  • Answered by AI
Round 2 - HR 

(3 Questions)

  • Q1. What Is the your notice period
  • Q2. What is the your acceptation
  • Q3. Hou can joined this company
Round 3 - Group Discussion 

Commen friendly description, the joine date & document review etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Very nice experience in the during experience & gain the confidence level.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Previous job description
  • Q2. Technical knowledge regarding the duty
  • Q3. Command over the roles and responsibilities
  • Q4. Accuracy and productivity
  • Q5. Employer capabilities
  • Q6. Able to handle the pressure
  • Ans. 

    Yes, I am able to handle pressure effectively by staying organized, prioritizing tasks, and maintaining a positive attitude.

    • I stay organized by creating to-do lists and setting realistic deadlines for tasks

    • I prioritize tasks based on deadlines and importance to ensure timely completion

    • I maintain a positive attitude by focusing on solutions rather than problems and seeking support from colleagues when needed

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to be part of this SP group and your resume will get more attention to the HR

I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Basic questions

Interview Preparation Tips

Interview preparation tips for other job seekers - candidates which were recruited by JMC in the year 2018 are getting less payments than the students recruited in the year 2019. The same happened to me and I left just because casual behavior from the management.

I applied via Approached by Company and was interviewed in Oct 2018. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Baching plant Rmu Tamrock Shotcrete machine Grouting pumps Layout of project Crusher plant
  • Q2. Why you want to join Why you want to leave Why we hire you
  • Ans. 

    I want to join to further develop my skills, seeking new challenges. I am leaving for career growth opportunities. You should hire me for my experience and expertise.

    • Seeking new challenges and opportunities for skill development

    • Leaving for career growth and advancement

    • Experience and expertise in the field

    • Ability to contribute effectively to the team and projects

  • Answered by AI

Interview Preparation Tips

General Tips: Be positive
Be prepared
Be calm
Don't be stressed


Skills: Communication, Problem Solving, Leadership, Time Management
Duration: <1 week

I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About site handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be good technical knowledge

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical round - depends on your sector and manager . Else no technical questions. Ready to travel . Married or not . Over...

Interview Preparation Tips

Topics to prepare for TCE Senior Engineer interview:
  • Basic
Interview preparation tips for other job seekers - Check out on going projects of your stream, opportunities to learn and grow , do bit of Market survey with respect to salary, job responsibilities . And main important is your team .
All the best

I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About structur like, Shuttring and steel dia wise wait per/m special gravity of cement & aggregate, related QC

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions, and previous company experience
Round 3 - One-on-one 

(7 Questions)

  • Q1. Technical questions, previous company experience
  • Q2. Concrete grade, site management
  • Q3. Site execution questions
  • Q4. Shuttering , reinforcement questions
  • Q5. Concrete grades ,qty taken
  • Q6. Finishing works Tiles ,granite plastering
  • Q7. Block work and finishing works

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly

Tata Projects Interview FAQs

How many rounds are there in Tata Projects Quaity Control Engineer interview for freshers?
Tata Projects interview process for freshers usually has 3 rounds. The most common rounds in the Tata Projects interview process for freshers are Technical, HR and Group Discussion.
What are the top questions asked in Tata Projects Quaity Control Engineer interview for freshers?

Some of the top questions asked at the Tata Projects Quaity Control Engineer interview for freshers -

  1. What application of curing compo...read more
  2. Required Slump Value of pumping concr...read more
  3. What aggregate crossing va...read more

Tell us how to improve this page.

Tata Projects Quaity Control Engineer Interview Process for Freshers

based on 1 interview

Interview experience

5
  
Excellent
View more
Join Tata Projects Simplify. Create.

Interview Questions from Similar Companies

KEC International Interview Questions
4.0
 • 318 Interviews
TCE Interview Questions
3.8
 • 253 Interviews
Saint-Gobain Interview Questions
4.0
 • 174 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
GMR Group Interview Questions
4.0
 • 84 Interviews
View all
Tata Projects Quaity Control Engineer Salary
based on 15 salaries
₹4 L/yr - ₹8.4 L/yr
86% more than the average Quaity Control Engineer Salary in India
View more details

Tata Projects Quaity Control Engineer Reviews and Ratings

based on 3 reviews

3.5/5

Rating in categories

3.5

Skill development

2.8

Work-life balance

2.1

Salary

3.5

Job security

2.1

Company culture

2.1

Promotions

2.1

Work satisfaction

Explore 3 Reviews and Ratings
Deputy Manager
1.2k salaries
unlock blur

₹5.8 L/yr - ₹17.5 L/yr

Assistant Manager
727 salaries
unlock blur

₹4 L/yr - ₹14.8 L/yr

Manager
416 salaries
unlock blur

₹8 L/yr - ₹22 L/yr

Senior Engineer
395 salaries
unlock blur

₹3.5 L/yr - ₹13.5 L/yr

Senior Manager
340 salaries
unlock blur

₹10.4 L/yr - ₹32.5 L/yr

Explore more salaries
Compare Tata Projects with

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare

KEC International

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview