Premium Employer

i

This company page is being actively managed by Tata Advanced Systems Team. If you also belong to the team, you can get access from here

Tata Advanced Systems Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Tata Advanced Systems Project Engineer Interview Questions, Process, and Tips

Updated 14 Apr 2024

Top Tata Advanced Systems Project Engineer Interview Questions and Answers

Tata Advanced Systems Project Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Working of NVR and troubleshooting of same
  • Ans. 

    NVR stands for Network Video Recorder, used for recording and storing video footage from IP cameras.

    • NVR records video footage from IP cameras onto a hard drive or storage device.

    • Troubleshooting NVR involves checking network connections, power supply, and storage capacity.

    • Common issues include network connectivity problems, insufficient storage space, and power supply failures.

  • Answered by AI
  • Q2. What is earthing
  • Ans. 

    Earthing is the process of connecting electrical systems to the ground to prevent electric shock and protect equipment.

    • Earthing helps to prevent electric shock by providing a path for fault currents to flow safely into the ground.

    • It also helps to protect electrical equipment from damage caused by lightning strikes or power surges.

    • Earthing is essential in electrical systems to ensure safety and proper functioning.

    • Exampl...

  • Answered by AI
  • Q3. How to check input and output voltage
  • Ans. 

    To check input and output voltage, use a multimeter to measure the voltage at the input and output terminals of the device.

    • Set the multimeter to the voltage measurement setting.

    • Connect the black probe to the ground terminal and the red probe to the input terminal to measure input voltage.

    • Repeat the process for the output terminal to measure output voltage.

    • Ensure the voltage readings are within the specified range for t

  • Answered by AI
  • Q4. Colour coding of cat6 cable
  • Ans. 

    Cat6 cables are typically color coded for easy identification and organization.

    • Cat6 cables are often color coded according to the TIA/EIA-568-B standard

    • The standard color code for Cat6 cables includes solid colors like blue, orange, green, and brown, as well as striped versions of those colors

    • Color coding helps in quickly identifying and organizing cables in a network setup

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - A good company with friendly atmosphere

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Related to CCTV projects
  • Q2. Boom barrier loop detection?
Round 3 - HR 

(1 Question)

  • Q1. Salary related questions answers

Interview Preparation Tips

Interview preparation tips for other job seekers - take answers prepare technical stick on salary negotiation

Project Engineer Interview Questions Asked at Other Companies

asked in Wipro
Q1. Triangle Star Pattern Task Your task is to print a triangle patte ... read more
asked in Wipro
Q2. Encode The String Problem Statement Given a string S of length N, ... read more
asked in Wipro
Q3. Binary to Decimal Conversion Challenge Transform a given binary n ... read more
asked in Wipro
Q4. Mindbending Product Problem Statement You are given an array ARR ... read more
asked in Wipro
Q5. Difference between compiler and interpreter. Why do you apply to ... read more

Interview questions from similar companies

Interview Questionnaire 

3 Questions

  • Q1. What is android architecture stack?
  • Ans. 

    Android architecture stack is a set of layers that make up the Android operating system.

    • The stack includes four main layers: Linux kernel, native libraries, Android runtime, and application framework.

    • The Linux kernel provides low-level system functionality.

    • Native libraries are written in C or C++ and provide access to hardware-specific features.

    • The Android runtime includes the Dalvik virtual machine and core libraries.

    • ...

  • Answered by AI
  • Q2. What is AIDL?
  • Ans. 

    AIDL stands for Android Interface Definition Language, used for inter-process communication in Android.

    • AIDL is used to define the interface between client and service in Android.

    • It allows communication between different processes in Android.

    • AIDL is used to pass complex data types between processes.

    • AIDL is similar to Remote Procedure Call (RPC) in other programming languages.

    • Example: AIDL is used in Android to implement...

  • Answered by AI
  • Q3. What is hash set and hash map
  • Ans. 

    Hash set and hash map are data structures used to store key-value pairs for efficient retrieval.

    • Hash set stores unique values without any specific order.

    • Hash map stores key-value pairs and allows fast retrieval of values based on keys.

    • Both use hashing to map keys to their corresponding values.

    • In Java, HashSet and HashMap are implementations of these data structures.

  • Answered by AI

Skills evaluated in this interview

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Major questions on my past work responsibilities and projects, stlc, defect life cycle, tools used, test case writing, techniques, test plan, agile methodologies

Interview Preparation Tips

Interview preparation tips for other job seekers - Web interview on Aug 2021
Got interview through recruitment consultancy from naukri

I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How types of welding?
  • Ans. 

    There are several types of welding including MIG, TIG, Stick, and Flux-Cored welding.

    • MIG welding uses a wire electrode and a shielding gas to join two pieces of metal together.

    • TIG welding uses a tungsten electrode and a filler metal to create a strong weld.

    • Stick welding uses a consumable electrode coated in flux to create a strong bond.

    • Flux-Cored welding uses a wire electrode with a flux core to create a protective shi

  • Answered by AI
  • Q2. Difference b/w 1st angle & 3rd angle projection?
  • Ans. 

    1st angle projection is used in Europe & 3rd angle projection is used in North America. They differ in placement of views.

    • 1st angle projection places the object in front of the viewing plane while 3rd angle projection places the object behind the viewing plane.

    • In 1st angle projection, the top view is placed below the front view while in 3rd angle projection, the top view is placed above the front view.

    • 1st angle project...

  • Answered by AI
  • Q3. Why u are leaving your past company
  • Q4. What is meant by six sigma
  • Ans. 

    Six Sigma is a data-driven methodology used to improve business processes by reducing defects and variability.

    • Six Sigma aims to achieve a level of quality where the probability of defects is extremely low.

    • It involves a structured approach to problem-solving using statistical analysis.

    • The methodology uses a set of tools and techniques such as DMAIC (Define, Measure, Analyze, Improve, Control) and statistical process con...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall it is good, always concentrate on core welding concepts

I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About previous experience
  • Q2. Previous experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience no issues
Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How do you calculate takt time
  • Ans. 

    Takt time is calculated by dividing the available production time by the customer demand.

    • Calculate the total available production time in a specified period (e.g. 1 day)

    • Determine the customer demand for the same period

    • Divide the total available production time by the customer demand to get the takt time

    • Takt Time = Total Production Time / Customer Demand

  • Answered by AI
  • Q2. How do you do line balancing
  • Ans. 

    Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.

    • Identify the tasks required to complete a process

    • Determine the cycle time for each task

    • Assign tasks to workstations based on cycle time and workload

    • Ensure that workstations are balanced to avoid bottlenecks

    • Regularly review and adjust the line balancing to optimize efficiency

  • Answered by AI
  • Q3. How do you to capacity analaysis
  • Ans. 

    Capacity analysis involves evaluating the ability of a system or process to handle a certain amount of workload or demand.

    • Identify the key components of the system or process that contribute to its capacity

    • Collect data on the current workload or demand placed on the system

    • Use mathematical models or simulations to predict how the system will perform under different levels of workload

    • Consider factors such as resource ava...

  • Answered by AI

Tata Advanced Systems Interview FAQs

How many rounds are there in Tata Advanced Systems Project Engineer interview?
Tata Advanced Systems interview process usually has 2 rounds. The most common rounds in the Tata Advanced Systems interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in Tata Advanced Systems Project Engineer interview?

Some of the top questions asked at the Tata Advanced Systems Project Engineer interview -

  1. How to check input and output volt...read more
  2. Working of NVR and troubleshooting of s...read more
  3. What is earth...read more

Tell us how to improve this page.

Tata Advanced Systems Project Engineer Interview Process

based on 3 interviews

Interview experience

4.7
  
Excellent
View more
Join Tata Advanced Systems Delivering End-to-End Innovative Solutions in Aerospace & Defence
Tata Advanced Systems Project Engineer Salary
based on 63 salaries
₹2 L/yr - ₹6.6 L/yr
22% less than the average Project Engineer Salary in India
View more details

Tata Advanced Systems Project Engineer Reviews and Ratings

based on 15 reviews

4.6/5

Rating in categories

4.4

Skill development

4.5

Work-life balance

4.1

Salary

4.5

Job security

4.6

Company culture

3.9

Promotions

4.5

Work satisfaction

Explore 15 Reviews and Ratings
Assistant Manager
521 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Executive
403 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
335 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive
303 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Officer
238 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Tata Advanced Systems with

Larsen & Toubro Limited

4.0
Compare

Bharat Electronics

4.2
Compare

Hindustan Aeronautics

4.3
Compare

Swan Defence and Heavy Industries

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview