Upload Button Icon Add office photos

Collins Aerospace

Compare button icon Compare button icon Compare

Filter interviews by

Collins Aerospace Project Engineer Interview Questions and Answers

Updated 27 Sep 2023

Collins Aerospace Project Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Sep 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Years of experience
  • Q2. Reason for leaving previous company
  • Q3. Months of notice period.
Round 3 - Technical 

(2 Questions)

  • Q1. Previous job role description
  • Q2. Case study examples
  • Ans. 

    Case study examples showcase problem-solving skills and experience in real-world scenarios.

    • Provide a brief overview of the case study

    • Explain the problem or challenge faced

    • Detail the approach taken to solve the problem

    • Discuss the results and outcomes achieved

    • Highlight key learnings or takeaways from the case study

  • Answered by AI
Round 4 - One-on-one 

(2 Questions)

  • Q1. Questions on approach and attitude
  • Q2. Questions on people management
Round 5 - HR 

(2 Questions)

  • Q1. Salary negotiation
  • Q2. Joining procedure

Interview Preparation Tips

Interview preparation tips for other job seekers - Na

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Working of NVR and troubleshooting of same
  • Ans. 

    NVR stands for Network Video Recorder, used for recording and storing video footage from IP cameras.

    • NVR records video footage from IP cameras onto a hard drive or storage device.

    • Troubleshooting NVR involves checking network connections, power supply, and storage capacity.

    • Common issues include network connectivity problems, insufficient storage space, and power supply failures.

  • Answered by AI
  • Q2. What is earthing
  • Ans. 

    Earthing is the process of connecting electrical systems to the ground to prevent electric shock and protect equipment.

    • Earthing helps to prevent electric shock by providing a path for fault currents to flow safely into the ground.

    • It also helps to protect electrical equipment from damage caused by lightning strikes or power surges.

    • Earthing is essential in electrical systems to ensure safety and proper functioning.

    • Exampl...

  • Answered by AI
  • Q3. How to check input and output voltage
  • Ans. 

    To check input and output voltage, use a multimeter to measure the voltage at the input and output terminals of the device.

    • Set the multimeter to the voltage measurement setting.

    • Connect the black probe to the ground terminal and the red probe to the input terminal to measure input voltage.

    • Repeat the process for the output terminal to measure output voltage.

    • Ensure the voltage readings are within the specified range for t

  • Answered by AI
  • Q4. Colour coding of cat6 cable
  • Ans. 

    Cat6 cables are typically color coded for easy identification and organization.

    • Cat6 cables are often color coded according to the TIA/EIA-568-B standard

    • The standard color code for Cat6 cables includes solid colors like blue, orange, green, and brown, as well as striped versions of those colors

    • Color coding helps in quickly identifying and organizing cables in a network setup

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - A good company with friendly atmosphere

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Referral and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Explain linkedlist and its advantages
  • Ans. 

    A linked list is a data structure where each element points to the next element, allowing for dynamic size and efficient insertion/deletion.

    • Each element (node) in a linked list contains data and a reference to the next node

    • Advantages include dynamic size, efficient insertion/deletion, and no need for contiguous memory allocation

    • Examples: Singly linked list, doubly linked list, circular linked list

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Honeywell Technology Solutions Project Engineer interview:
  • Java

Skills evaluated in this interview

I applied via Referral and was interviewed in Jul 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. 1.Control system subject topic questions. 2)what is your favourite subject in b.tech 3) what is lead and lag compensator and explain it 4) what is under damped system 5) if any program write in embedded sy...

Interview Preparation Tips

Interview preparation tips for other job seekers - I am answering the questions after that sir will be explained what's is work and salary topic.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Many technical questions related to project management. M
Round 2 - One-on-one 

(1 Question)

  • Q1. Initially started with technical again. But then started to know more about myself and my family.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. What is your strength

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare and research well about company
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Project Origens Observation Profile s.
Round 3 - Group Discussion 

Project Origens to any Observation profile Topics.

Round 4 - Case Study 

Industrial Project Observation to any requirement Case Study.

Round 5 - Assignment 

Industrial Project Order/ Contact or Regular Working environment assignment to sustain.

Round 6 - One-on-one 

(1 Question)

  • Q1. Project management of HR Round manuals.
Round 7 - Coding Test 

Project Origens to Observation expected
Question Coding Test.

Round 8 - Aptitude Test 

Project Origens to Observation and expectations Profile forcast sustain
Aptitude Test Manual s.

Round 9 - Technical 

(1 Question)

  • Q1. Project management required technical Manuals for profile sustain environment.

Interview Preparation Tips

Interview preparation tips for other job seekers - To,
The HR Project Manager,
BARC RTI ,
Mumbai.
Sub :- Regarding Inter Planet Project Geography Origens Observation RTI Act 2005 Order to sustain profile manual.

Thanks and regarding
M Madhan MBA
BARC RTI Project Act 2005 Order.

I was interviewed in May 2022.

Round 1 - One-on-one 

(1 Question)

  • Q1. What is your plan for bringing new project for the organization?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident not over confident.Be bold and timid if you don't have answer.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about your self?
  • Q2. Que will be base on resume

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are working in small size company then it's good to join this company but if you are already in good big MNC company then don't come......
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Related to CCTV projects
  • Q2. Boom barrier loop detection?
Round 3 - HR 

(1 Question)

  • Q1. Salary related questions answers

Interview Preparation Tips

Interview preparation tips for other job seekers - take answers prepare technical stick on salary negotiation

Collins Aerospace Interview FAQs

How many rounds are there in Collins Aerospace Project Engineer interview?
Collins Aerospace interview process usually has 5 rounds. The most common rounds in the Collins Aerospace interview process are HR, Resume Shortlist and Technical.
How to prepare for Collins Aerospace Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Collins Aerospace. The most common topics and skills that interviewers at Collins Aerospace expect are Aerospace, Health Insurance, Leasing, CAPM and Continuous Improvement.
What are the top questions asked in Collins Aerospace Project Engineer interview?

Some of the top questions asked at the Collins Aerospace Project Engineer interview -

  1. Case study examp...read more
  2. Questions on people managem...read more
  3. Joining proced...read more

Tell us how to improve this page.

Collins Aerospace Project Engineer Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Indian Army Interview Questions
4.7
 • 151 Interviews
GE Interview Questions
4.2
 • 106 Interviews
Boeing Interview Questions
3.9
 • 84 Interviews
AIRBUS Interview Questions
3.7
 • 73 Interviews
View all
Collins Aerospace Project Engineer Salary
based on 7 salaries
₹6.5 L/yr - ₹26 L/yr
195% more than the average Project Engineer Salary in India
View more details

Collins Aerospace Project Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

5.0

Skill development

2.0

Work-life balance

2.0

Salary

4.0

Job security

4.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Lead Engineer
544 salaries
unlock blur

₹6.8 L/yr - ₹20.1 L/yr

Senior Leader Engineer
420 salaries
unlock blur

₹9.8 L/yr - ₹30 L/yr

Associate Engineer
384 salaries
unlock blur

₹4 L/yr - ₹13 L/yr

Design Engineer
220 salaries
unlock blur

₹4.1 L/yr - ₹12 L/yr

Lead Software Engineer
198 salaries
unlock blur

₹6.2 L/yr - ₹19.2 L/yr

Explore more salaries
Compare Collins Aerospace with

Boeing

3.9
Compare

AIRBUS

3.7
Compare

Tata Lockheed Martin Aerostructures

3.8
Compare

Raytheon

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview