Tests to identify soil compaction
Proctor compaction test
Sand cone test
Core cutter test
Nuclear density test
Plate load test
BOQ stands for Bill of Quantities, which is a document that lists all the materials, labor, and equipment needed for a construction project.
BOQ is used to estimate the cost of a project and to ensure that all necessary materials and labor are accounted for.
It includes detailed information about the quantities and specifications of each item needed for the project.
BOQ is typically prepared by a quantity surveyor or an e...
There are mainly three types of footings used in industrial building foundation.
The three types of footings are isolated footing, combined footing, and raft footing.
Isolated footing is used for individual columns, combined footing is used for two or more columns, and raft footing is used for the entire building.
The choice of footing type depends on the soil condition, load-bearing capacity, and the size of the building...
A BBS contains details about the quantity and size of reinforcement bars used in a construction project.
Quantity and size of reinforcement bars
Spacing and location of reinforcement bars
Type of reinforcement bars used
Details about stirrups and ties
Details about hooks and bends
Details about lap lengths
Major items used in an industrial building include structural components, HVAC systems, electrical systems, plumbing, and fire protection.
Structural components such as steel beams, columns, and concrete slabs
HVAC systems for heating, ventilation, and air conditioning
Electrical systems including wiring, panels, and lighting fixtures
Plumbing for water supply, drainage, and waste disposal
Fire protection systems such as sp
Top trending discussions
I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.
Technical questions about civil engineering works
The question is unrelated and consists of three different topics: frog, area of triangle, and types of tiles.
Frog is an amphibian with smooth, moist skin and long hind legs adapted for leaping.
The area of a triangle is calculated by multiplying the base by the height and dividing by 2.
There are various types of tiles such as ceramic, porcelain, mosaic, glass, etc.
I have experience in the field of civil engineering and currently working for a company.
I have a Bachelor's degree in Civil Engineering.
I have worked on various construction projects, including residential and commercial buildings.
I am proficient in using software such as AutoCAD and Revit for designing and drafting.
I have experience in conducting site inspections and ensuring compliance with building codes and regulat...
I applied via Walk-in and was interviewed before Aug 2021. There was 1 interview round.
based on 3 reviews
Rating in categories
Billing Engineer
6
salaries
| ₹5.4 L/yr - ₹6.6 L/yr |
Site Engineer
6
salaries
| ₹2.4 L/yr - ₹4.3 L/yr |
Civil Site Engineer
6
salaries
| ₹1.4 L/yr - ₹6 L/yr |
Project Manager
5
salaries
| ₹8.4 L/yr - ₹13.2 L/yr |
Store Incharge
5
salaries
| ₹3 L/yr - ₹3.8 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Tata Projects
Simplex Infrastructures