Filter interviews by
Experienced project manager with a background in construction and a proven track record of delivering projects on time and within budget.
Over 5 years of project management experience
Strong leadership and communication skills
Proficient in project management software such as Microsoft Project
Managed construction projects including a new office building and a residential complex
My current project involves overseeing the construction of a new office building in downtown area.
Coordinating with architects, engineers, and contractors
Managing project timeline and budget
Ensuring compliance with building codes and regulations
I handle project planning, coordination, budgeting, scheduling, and team management as an Assistant Project Manager.
Project planning and coordination
Budgeting and financial management
Scheduling tasks and deadlines
Team management and communication
Risk assessment and mitigation
Client relationship management
Reinforcement weight can be calculated by multiplying the volume of concrete by the density of the reinforcement material.
Calculate the volume of concrete in cubic meters
Determine the density of the reinforcement material in kg/m^3
Multiply the volume of concrete by the density of the reinforcement material to get the weight in kilograms
Lapping in column is provided at the location of the manufacturing facility.
Manufacturing facility provides lapping in column
Check with the specific manufacturing facility for more details
I applied via Approached by Company and was interviewed in Nov 2022. There were 2 interview rounds.
Tests to identify soil compaction
Proctor compaction test
Sand cone test
Core cutter test
Nuclear density test
Plate load test
BOQ stands for Bill of Quantities, which is a document that lists all the materials, labor, and equipment needed for a construction project.
BOQ is used to estimate the cost of a project and to ensure that all necessary materials and labor are accounted for.
It includes detailed information about the quantities and specifications of each item needed for the project.
BOQ is typically prepared by a quantity surveyor or an e...
There are mainly three types of footings used in industrial building foundation.
The three types of footings are isolated footing, combined footing, and raft footing.
Isolated footing is used for individual columns, combined footing is used for two or more columns, and raft footing is used for the entire building.
The choice of footing type depends on the soil condition, load-bearing capacity, and the size of the building...
A BBS contains details about the quantity and size of reinforcement bars used in a construction project.
Quantity and size of reinforcement bars
Spacing and location of reinforcement bars
Type of reinforcement bars used
Details about stirrups and ties
Details about hooks and bends
Details about lap lengths
Major items used in an industrial building include structural components, HVAC systems, electrical systems, plumbing, and fire protection.
Structural components such as steel beams, columns, and concrete slabs
HVAC systems for heating, ventilation, and air conditioning
Electrical systems including wiring, panels, and lighting fixtures
Plumbing for water supply, drainage, and waste disposal
Fire protection systems such as sp
Top trending discussions
posted on 28 Oct 2022
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 3 interview rounds.
Not applicable , this was final round
posted on 12 Feb 2024
I applied via Walk-in and was interviewed in Jan 2024. There were 4 interview rounds.
They given some topic on gd
They gave some gd questions
I applied via Referral and was interviewed in Feb 2020. There were 6 interview rounds.
Good level question. I have qualified for the next round
Basic to intermediate question, Cleared the test
posted on 22 Jul 2024
I applied via Walk-in and was interviewed before Jul 2023. There were 4 interview rounds.
Coding test duration is 30 to 40 min
on paper pen and topic is simple like related to string,pattern and number's
posted on 6 Dec 2024
I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.
Queue can be implemented using two stacks by maintaining the order of elements in the stacks.
Create two stacks, let's call them stack1 and stack2
When an element is enqueued, push it to stack1
When an element is dequeued, pop all elements from stack1 and push them to stack2
Pop the top element from stack2 and return it as the dequeued element
If stack2 is empty, repeat step 3
To get the front element of the queue, peek the
Left join returns all records from left table and matching records from right table. Full outer join returns all records from both tables.
Left join is used to combine two tables based on a common column.
In left join, all records from the left table are returned along with matching records from the right table.
If there is no match in the right table, NULL values are returned.
Example: SELECT * FROM table1 LEFT JOIN table...
Magic functions are special methods in PHP that start with __. Autoloading is a way to automatically load classes.
Magic functions are used to handle certain events in PHP, such as object creation or property access.
Autoloading allows PHP to automatically load classes when they are needed, without requiring manual includes.
Magic functions can be used in conjunction with autoloading to dynamically load classes or handle
Given three sorted arrays, find common elements.
Create three pointers to traverse each array
Compare the elements at the pointers and move the pointer of the smallest element
If all pointers point to the same element, add it to the result and move all pointers
Repeat until any pointer reaches the end of its array
Check if a number is a power of 2 or not.
A power of 2 has only one bit set in its binary representation.
Use bitwise AND operator to check if the number is a power of 2.
If n is a power of 2, then n & (n-1) will be 0.
based on 2 interviews
Interview experience
based on 28 reviews
Rating in categories
Site Engineer
6
salaries
| ₹2.4 L/yr - ₹4.3 L/yr |
Civil Site Engineer
6
salaries
| ₹1.4 L/yr - ₹6 L/yr |
Project Manager
5
salaries
| ₹8.4 L/yr - ₹13.2 L/yr |
Billing Engineer
5
salaries
| ₹5.4 L/yr - ₹6.6 L/yr |
Civil Engineer
5
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Amazon Sellers Services
Primus Global Technologies
GAMMON INDIA
Practo