Filter interviews by
Top trending discussions
I was interviewed before Apr 2023.
I applied via campus placement at National Defence Academy (NDA), Pune and was interviewed before May 2022. There were 3 interview rounds.
I failed to meet a project deadline due to poor time management.
I took on too many tasks and did not prioritize effectively.
I communicated with my team and superiors about the delay and took responsibility for my mistake.
I created a new plan with realistic deadlines and delegated tasks to team members.
The project was completed successfully within the new timeline.
I have over 10 years of experience in management roles, with a focus on operations and team leadership.
Started as a team leader at XYZ company, overseeing a team of 10 employees
Promoted to Operations Manager at ABC company, responsible for managing daily operations and improving efficiency
Most recently served as Senior Manager at DEF company, leading a team of 20 and implementing new strategies to increase revenue
Recei...
I bring a unique combination of strategic thinking, leadership, and technical expertise to the table.
Expertise in developing and executing strategic plans to achieve business goals
Proven track record of leading high-performing teams and driving results
Strong technical background in [relevant field], allowing me to effectively communicate with technical teams and understand complex issues
Excellent communication and inte...
Typical market sizing
I applied via Recruitment Consultant and was interviewed in Jan 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
I am a Senior Engineer with 10+ years of experience in designing and implementing complex systems.
10+ years of experience in engineering
Specialize in designing and implementing complex systems
Strong problem-solving skills
Proficient in various programming languages such as Java, Python, and C++
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges and learning opportunities
Seeking better work-life balance
Interested in working with new technologies or industries
I handle manpower by delegating tasks effectively, providing clear instructions, and offering support and guidance when needed.
Delegate tasks based on team members' strengths and expertise
Provide clear instructions and expectations for each task
Offer support and guidance to team members when needed
Regularly communicate with team members to ensure progress and address any issues
Recognize and reward team members for thei
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Identify the tasks required to complete a process
Determine the cycle time for each task
Assign tasks to workstations based on cycle time to balance workload
Adjust as needed to optimize efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of wo
Electrostatic Discharge (ESD) is the sudden flow of electricity between two electrically charged objects caused by contact, an electrical short, or dielectric breakdown.
ESD can damage electronic components and devices, leading to malfunctions or complete failure.
It can occur when a person touches a metal object after walking on a carpet, or when connecting/disconnecting cables or components.
Preventive measures include ...
I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.
I have over 10 years of experience in senior executive roles, leading teams and driving strategic initiatives.
Led cross-functional teams to successfully launch new products
Developed and implemented strategic plans to drive revenue growth
Managed key client relationships to ensure customer satisfaction
Implemented cost-saving measures to improve operational efficiency
PPAP (Production Part Approval Process) is a standardized process in the automotive industry to ensure suppliers meet quality standards before production.
PPAP is used in the automotive industry to establish confidence in suppliers and their production processes.
It involves submitting documentation such as design records, process flow diagrams, control plans, and measurement system analysis.
PPAP also includes parts subm...
Problem solving method involves identifying the issue, analyzing possible solutions, selecting the best one, and implementing it.
Identify the problem or issue at hand
Gather relevant information and data
Brainstorm potential solutions
Evaluate each solution based on feasibility and effectiveness
Select the best solution and create an action plan
Implement the chosen solution and monitor its effectiveness
I applied via Approached by Company and was interviewed in Sep 2023. There were 3 interview rounds.
Energy auditing is the process of assessing energy usage in a building or facility to identify opportunities for energy efficiency improvements.
Identifying energy consumption patterns
Assessing energy efficiency of equipment and systems
Recommendations for energy saving measures
Cost-benefit analysis of proposed improvements
Energy meters used in utilities measure the amount of electricity consumed by a household or business.
Types of energy meters include electromechanical meters, electronic meters, and smart meters
Reading is taken by recording the numbers displayed on the meter, usually in kilowatt-hours
Meter specifications include accuracy class, voltage range, current range, and communication protocols
Examples of energy meter manufactur...
Case study questions for specific role
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.
OEE stands for Overall Equipment Effectiveness, a metric used to measure the efficiency of manufacturing processes.
OEE takes into account three factors: availability, performance, and quality.
It is calculated by multiplying availability, performance, and quality percentages.
OEE helps identify areas for improvement in production processes.
For example, if a machine has an availability of 90%, performance of 80%, and qual
based on 6 reviews
Rating in categories
Junior Engineer
130
salaries
| ₹1.7 L/yr - ₹4.2 L/yr |
Assistant Manager
93
salaries
| ₹5.7 L/yr - ₹12.8 L/yr |
Senior Engineer
88
salaries
| ₹3.8 L/yr - ₹8.4 L/yr |
Engineer
56
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Quality Engineer
53
salaries
| ₹1.5 L/yr - ₹4.7 L/yr |
Flex
Sanmina Sci
Jabil Circuit India
Celestica