I applied via Approached by Company and was interviewed in Jun 2017. There were 5 interview rounds.
The vendor qualification procedure involves several steps from start to finish.
Identify the need for a vendor
Define the vendor qualification criteria
Invite vendors to submit their qualifications
Evaluate vendor qualifications
Select qualified vendors
Negotiate and finalize contracts
Monitor vendor performance
Review and update vendor qualifications periodically
The specification procedure involves investigation and supporting guidelines.
The specification procedure involves defining the requirements and specifications for a project or product.
Investigation is conducted to gather information and analyze the needs and constraints.
Supporting guidelines provide instructions and recommendations for carrying out the specification procedure.
Examples of supporting guidelines include t
I applied via Approached by Company and was interviewed in Oct 2024. There were 2 interview rounds.
posted on 6 Oct 2024
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
HVAC system stands for Heating, Ventilation, and Air Conditioning system, which is used to control the temperature, humidity, and air quality in a building.
HVAC systems regulate indoor air quality by providing ventilation, maintaining temperature, and controlling humidity levels.
They consist of components such as furnaces, air conditioners, heat pumps, ductwork, thermostats, and air filters.
Examples of HVAC systems inc...
Periodic qualification involves obtaining certifications and licenses to ensure competency and compliance with industry standards.
HVAC engineers should regularly update their certifications and licenses to stay current with industry regulations.
Continuing education courses can help HVAC engineers stay up-to-date on the latest technologies and best practices.
Some examples of certifications for HVAC engineers include EPA...
Chiller is a device that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chiller absorbs heat from a process water stream and transfers it to a refrigerant.
The refrigerant then carries the heat to the condenser where it is released.
The chilled water is circulated through the building to cool the air or equipment.
Chillers can be air-cooled, water-cooled, or evaporatively cooled.
Commo...
Maintain differential pressure by adjusting airflow, sealing leaks, and monitoring equipment.
Adjust airflow using dampers or variable frequency drives to balance pressure
Seal leaks in ductwork or building envelope to prevent pressure loss
Monitor equipment regularly to ensure proper functioning and make adjustments as needed
Cooling tower discharge pressure is the pressure at which water is discharged from the cooling tower.
Cooling tower discharge pressure is typically measured in pounds per square inch (psi) or inches of water column (in. WC).
The discharge pressure is influenced by factors such as the flow rate of water, the height of the cooling tower, and the design of the tower.
Maintaining the correct discharge pressure is important fo...
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
Loading autoclave properly involves following proper procedures to ensure sterilization of equipment.
Ensure items are properly arranged inside autoclave to allow for proper steam circulation
Check that items are not overcrowded to ensure even sterilization
Follow manufacturer's guidelines for loading autoclave based on type of equipment being sterilized
posted on 9 Oct 2024
I applied via Walk-in and was interviewed in Sep 2024. There was 1 interview round.
posted on 3 Oct 2024
Was asked to create an AE output using the raw data
posted on 12 Aug 2024
I applied via Campus Placement and was interviewed in Jul 2024. There were 2 interview rounds.
General Aptitude test in science and technology
posted on 1 Dec 2024
Requirements of dossier
ICH Guideline,
posted on 30 Sep 2024
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
Passion for creativity, strategic thinking, and connecting with consumers drove me to choose a career in marketing.
Passion for creativity and strategic thinking
Enjoy connecting with consumers and understanding their needs
Excited about the dynamic and ever-changing nature of the marketing industry
based on 2 reviews
Rating in categories
Production Manager
3
salaries
| ₹16.8 L/yr - ₹19.3 L/yr |
Lee Pharma
VWR International
Ferring Pharmaceuticals
West Coast Pharmaceuticals