Filter interviews by
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
Loading autoclave properly involves following proper procedures to ensure sterilization of equipment.
Ensure items are properly arranged inside autoclave to allow for proper steam circulation
Check that items are not overcrowded to ensure even sterilization
Follow manufacturer's guidelines for loading autoclave based on type of equipment being sterilized
Top trending discussions
I applied via Campus Placement and was interviewed in Aug 2021. There were 3 interview rounds.
Yes, I have experience as a shift encharge and can handle the responsibilities effectively.
I have previously worked as a shift encharge in my previous job.
I am familiar with the duties and responsibilities of a shift encharge.
I am capable of managing and supervising the team during the shift.
I can ensure that the production targets are met and quality standards are maintained.
I can handle any issues or emergencies that...
I applied via Referral and was interviewed in Feb 2022. There was 1 interview round.
Expected CTC is negotiable based on company standards and job responsibilities.
Expected CTC is dependent on various factors such as job role, experience, skills, and industry standards.
The company may have a fixed salary range for the position, but it can be negotiable based on the candidate's qualifications.
It is important to research the industry standards and the company's compensation policies before discussing the...
posted on 21 Oct 2023
I applied via Walk-in and was interviewed in Apr 2023. There were 4 interview rounds.
The operational activities of important equipment on the floor shop are managed by the Production Officer.
The Production Officer oversees the usage and maintenance of all equipment on the floor shop.
They ensure that all equipment is functioning properly and efficiently.
Examples of equipment may include machines, tools, computers, and vehicles.
The Production Officer may schedule maintenance, repairs, and upgrades for th
Involve many departments like
QC , QA , Engineering and production
I applied via Naukri.com and was interviewed in Sep 2022. There were 2 interview rounds.
The Knapp test kit is used to evaluate the visual inspection process through a machine.
The Knapp test kit helps in assessing the accuracy and efficiency of visual inspection processes performed by machines.
It can be used to identify any potential issues or defects in the inspection process.
The kit typically includes various tools and materials to simulate different inspection scenarios.
Results from the Knapp test kit c...
A clean room can be made by controlling air flow, using proper filtration systems, maintaining cleanliness, and implementing strict protocols.
Control air flow to prevent contaminants from entering the room
Use HEPA filters to remove particles from the air
Regularly clean surfaces and equipment to prevent buildup of dust and debris
Implement strict protocols for entering and exiting the clean room
Viable and non-viable monitoring involves assessing the presence of living and non-living organisms in a production environment.
Viable monitoring involves counting living organisms such as bacteria or fungi using culture-based methods.
Non-viable monitoring involves measuring total microbial counts, including both living and dead organisms, using methods like ATP bioluminescence.
Regular monitoring helps ensure product q...
Cleaning validation is performed to ensure that the cleaning process effectively removes residues from equipment.
Identify critical cleaning steps and equipment to be validated
Establish acceptance criteria for residue limits
Select appropriate analytical methods for detection
Perform cleaning verification tests before validation
Document all procedures and results for regulatory compliance
The number of tests available for tunnel and filling machine validation varies depending on the specific requirements of the production process.
The number of tests for tunnel and filling machine validation can range from a few basic tests to a comprehensive validation protocol.
Common tests include functionality testing, performance testing, and validation of critical process parameters.
The number of tests may also depe...
posted on 11 Jan 2021
I applied via Naukri.com and was interviewed in Oct 2021. There were 4 interview rounds.
posted on 11 Jan 2021
I applied via Naukri.com and was interviewed before Jan 2020. There was 1 interview round.
I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2021. There were 2 interview rounds.
Distillation columns are classified based on their internal structure and operation.
Distillation columns can be classified as batch or continuous columns.
Common types of distillation columns include simple distillation columns, fractional distillation columns, and steam distillation columns.
The type of distillation column used depends on the specific separation requirements and properties of the components being separa
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Officer
49
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Executive
20
salaries
| ₹4 L/yr - ₹7 L/yr |
Senior Executive
9
salaries
| ₹6.2 L/yr - ₹10 L/yr |
Senior Officer
8
salaries
| ₹3 L/yr - ₹4.6 L/yr |
QA Officer
6
salaries
| ₹2.1 L/yr - ₹2.7 L/yr |
Symbiotec Pharmalab
Aspiro Pharma
Med Manor Organics
Umedica Laboratories