Filter interviews by
I was interviewed before Nov 2023.
To troubleshoot a laminator heater coil issue, check for power supply, continuity of the coil, and potential damage or wear.
Check power supply to the heater coil
Test continuity of the coil using a multimeter
Inspect the coil for any signs of damage or wear
Replace the coil if necessary
NPN sensors are commonly used due to their cost-effectiveness, versatility, and ease of integration.
Cost-effective compared to PNP sensors
Versatile in various applications
Easy to integrate with different systems
Commonly available in the market
A capacity sensor is a device that measures the amount of a substance or material that can be held or stored in a given space.
Capacity sensors are commonly used in industries such as manufacturing, agriculture, and logistics to monitor and control the amount of materials in tanks, silos, or containers.
These sensors can be based on various technologies such as ultrasonic, radar, or pressure sensors to accurately measure...
Capacity sensors measure the amount of a substance or material that can be held or contained.
Capacity sensors can be used to monitor levels of liquids, gases, or solids in tanks or containers.
They work by detecting changes in pressure, weight, or volume to determine the amount of substance present.
Examples include ultrasonic sensors for measuring liquid levels in tanks, pressure sensors for monitoring gas levels, and w...
Troubleshooting problems involves identifying the root cause and implementing solutions.
Identify the symptoms of the problem
Gather relevant information and data
Isolate the root cause through systematic testing and analysis
Implement solutions based on findings
Test the solutions to ensure the problem is resolved
MS 100 stringer is a manual stringer machine while AM 050FS stringer is a fully automatic stringer machine.
MS 100 stringer is manual, requires operator intervention
AM 050FS stringer is fully automatic, operates without manual intervention
MS 100 stringer may have lower throughput compared to AM 050FS stringer
Safety equipments used in laminator machine include emergency stop button, safety guards, safety interlocks, and warning signs.
Emergency stop button for immediate shutdown in case of emergency
Safety guards to prevent access to moving parts
Safety interlocks to ensure machine stops when guards are opened
Warning signs to alert operators of potential hazards
DMR can be controlled by setting up access controls, monitoring usage, and implementing encryption.
Set up access controls to restrict who can view, edit, or delete data in the DMR.
Monitor usage to track who is accessing the DMR and what actions they are taking.
Implement encryption to protect the data in the DMR from unauthorized access.
Regularly review and update access controls, monitoring processes, and encryption me
EVA stands for Economic Value Added, a financial performance measure that calculates the profit generated by a company's operations after accounting for the cost of capital.
EVA is calculated by subtracting the cost of capital from the company's net operating profit after tax (NOPAT).
It is used to determine if a company is creating value for its shareholders above and beyond the cost of capital.
Positive EVA indicates th...
Safety equipment in lamination can be checked by monitoring thermostat, oil pressure, and float level.
Check thermostat for proper functioning by setting it to desired temperature and observing if it maintains the temperature.
Monitor oil pressure in the lamination machine to ensure it is within the recommended range for safe operation.
Inspect oil float level to make sure it is at the correct level for proper lubrication
Top trending discussions
I applied via Referral
posted on 23 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
Scope in project management refers to the boundaries of the project, including deliverables, tasks, and goals.
Scope defines what will be included and excluded in the project
It helps in setting clear expectations for stakeholders
Scope creep occurs when additional work is added to the project without proper approval
Scope verification ensures that all deliverables have been completed as per the scope statement
I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.
Expanded market coverage by 30% and developed new partnerships with key industry players.
Implemented targeted marketing strategies to reach new customer segments
Established relationships with distributors in untapped regions
Launched new product lines to address specific market needs
Collaborated with industry influencers to increase brand visibility
Costing and estimation assignment for Senior Engineer position
Understand the scope of the project and gather all relevant information
Break down the project into smaller tasks and estimate the time and cost for each task
Consider factors such as materials, labor, equipment, and overhead costs
Use historical data or industry benchmarks to validate your estimates
Provide a detailed cost breakdown and justification for your e
Computer software skills
Estimation & costing related work
I was interviewed in Dec 2022.
Switch configuration involves setting up VLANs, port security, QoS, and other settings to optimize network performance.
Access the switch's command line interface (CLI) using a console cable or remote access software
Configure VLANs to segment network traffic and improve security
Enable port security to prevent unauthorized access to the network
Set up Quality of Service (QoS) to prioritize network traffic and ensure criti...
L2 and L3 switches are network devices used for packet switching. L2 operates at the data link layer and L3 at the network layer.
L2 switch operates at the data link layer and forwards packets based on MAC addresses
L3 switch operates at the network layer and forwards packets based on IP addresses
L2 switch is used for LAN networks while L3 switch is used for both LAN and WAN networks
L2 switch is faster than L3 switch as ...
MPLS is a protocol used for efficient packet forwarding in a network. It is used in WANs and service provider networks.
MPLS stands for Multiprotocol Label Switching
It is used to improve the speed and efficiency of network traffic routing
MPLS uses labels to identify the path that packets should take through the network
It is commonly used in WANs and service provider networks to provide Quality of Service (QoS) and traff...
VLANs are virtual LANs that allow network administrators to group devices together based on their functions or departments.
VLANs are used to segment a network into smaller, more manageable groups.
They can be created using network switches or routers.
Each VLAN has its own broadcast domain and can be configured with its own security policies.
VLANs can be created based on different criteria such as department, location, o...
I was interviewed before Feb 2024.
I applied via Job Fair and was interviewed before Apr 2023. There was 1 interview round.
Regarding electrical project related discussion
posted on 20 Jan 2022
I applied via Recruitment Consultant and was interviewed in Dec 2021. There was 1 interview round.
I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.
Some of the top questions asked at the Swelect Energy Systems Senior Engineer L2 interview -
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Service Engineer
61
salaries
| ₹1.1 L/yr - ₹4.2 L/yr |
Junior Engineer
31
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Engineer
16
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
Design Engineer
10
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Assistant Manager
9
salaries
| ₹4.5 L/yr - ₹6.5 L/yr |
Waaree Energies
Adani Green Energy
Vikram Solar
Azure Power