Filter interviews by
Be the first one to contribute and help others!
posted on 15 Jan 2025
I applied via AmbitionBox and was interviewed in Dec 2024. There were 5 interview rounds.
posted on 22 Jan 2025
posted on 16 Jan 2025
posted on 12 Nov 2024
I applied via Recruitment Consulltant and was interviewed in Oct 2024. There was 1 interview round.
posted on 13 Nov 2024
I applied via Walk-in and was interviewed in Oct 2024. There was 1 interview round.
To check the motor, you can perform various tests and inspections to ensure it is functioning properly.
Check for any physical damage or wear on the motor casing
Inspect the wiring connections for any loose or damaged wires
Measure the voltage and current going into the motor to ensure it is within the specified range
Test the motor's insulation resistance to check for any faults
Run the motor under load to see if it operat
Power analysis involves measuring and analyzing the electrical power consumption of a system or device.
Identify the components of the system or device that consume power.
Measure the current and voltage across these components using appropriate instruments.
Calculate the power consumption using the formula P = VI, where P is power, V is voltage, and I is current.
Analyze the power consumption data to identify any ineffici...
A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers are used to increase or decrease voltage levels in electrical circuits.
They consist of two coils of wire, known as the primary and secondary coils.
Examples of transformers include power transformers used in electrical substations and voltage transformers in electronic devices.
posted on 28 Aug 2024
I was interviewed in Jul 2024.
Transformer is a static device is change is ac voltage one level and another level but no change in frequency the work in mutual induction method.
Sailent type rotor and cylinder type rotor of uses in syuchronus machine.
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
The machine name at my current company is XYZ-2000 and it has a capacity of 500 units per hour.
Machine name: XYZ-2000
Capacity: 500 units per hour
posted on 12 May 2024
Main power work distribution involves managing the distribution of electrical power throughout a construction site.
Coordinate with electricians to ensure proper installation and maintenance of power distribution systems
Monitor power usage and troubleshoot any issues that arise
Ensure compliance with safety regulations and protocols
Plan for future power needs and upgrades
Examples: overseeing the installation of temporary...
based on 7 reviews
Rating in categories
Production Engineer
4
salaries
| ₹3.2 L/yr - ₹5.2 L/yr |
Foreman
4
salaries
| ₹2.4 L/yr - ₹4.7 L/yr |
Electrical Engineer
3
salaries
| ₹3.6 L/yr - ₹5.4 L/yr |
Tata Steel
JSW Steel
Jindal Steel and Power
ArcelorMittal Nippon Steel