Filter interviews by
I was interviewed in Dec 2024.
If you encounter a problem while answering, please consult your friends sitting nearby.
I applied via Recruitment Consulltant
Glass manufacturing involves melting raw materials, shaping the molten glass, and cooling it to form the final product.
Raw materials such as silica sand, soda ash, and limestone are melted in a furnace at high temperatures.
The molten glass is then shaped using various techniques like blowing, pressing, or drawing.
The shaped glass is cooled slowly in an annealing oven to relieve internal stresses and strengthen the glas...
I applied via Campus Placement and was interviewed in May 2023. There were 3 interview rounds.
Basic information knowledge and company about
posted on 28 Dec 2024
I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
OEE stands for Overall Equipment Effectiveness and is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability is the ratio of operating time to planned production time.
Performance is the ratio of actual production to maximum possible production.
Quality is the ratio of good parts to total parts produced.
OEE = Availability x Performa...
G code and M code are machine codes used in CNC programming to control the movements and functions of a machine tool.
G code is used to control the movements of the machine, such as linear or circular interpolation.
M code is used to control auxiliary functions of the machine, such as turning on or off coolant or spindle rotation.
G codes are typically used for positioning and feed rate control, while M codes are used for...
I have used software to create programs.
I have used software like AutoCAD, SolidWorks, and MATLAB to create programs for production engineering.
Using software allows for more precise and efficient programming compared to manual methods.
Software also helps in simulating and testing programs before implementation.
I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.
Assembly BIW production process involves various parameters to ensure weld quality.
Ensure proper fit-up of components before welding
Maintain correct welding parameters such as voltage, current, and travel speed
Use appropriate shielding gas and welding consumables
Regularly inspect and maintain welding equipment
Implement quality control measures such as visual inspection and non-destructive testing
posted on 3 Feb 2025
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed in Oct 2023. There were 3 interview rounds.
5S is a workplace organization method that improves efficiency and safety. 3M and 3K refer to the principles of Muda, Mura, and Muri in lean manufacturing. KANBAN is a visual scheduling system used to manage production flow.
5S involves Sort, Set in order, Shine, Standardize, and Sustain to create a clean and organized work environment.
3M (Muda, Mura, Muri) are the three types of waste in lean manufacturing - Muda (wast...
Manpower handling refers to managing and overseeing the workforce in a production setting. Kaizen is a continuous improvement philosophy aimed at making small, incremental changes for efficiency.
Manpower handling involves recruiting, training, scheduling, and supervising employees to ensure smooth production operations.
Kaizen is a Japanese term meaning 'continuous improvement'. It focuses on making small, incremental c...
based on 2 interviews
Interview experience
based on 6 reviews
Rating in categories
Assistant Engineer
2.7k
salaries
| ₹1.4 L/yr - ₹4 L/yr |
Deputy Engineer
1.8k
salaries
| ₹1.5 L/yr - ₹4.6 L/yr |
Diploma Trainee Engineer
939
salaries
| ₹1.2 L/yr - ₹3 L/yr |
Engineer
417
salaries
| ₹1.5 L/yr - ₹7 L/yr |
Production Engineer
366
salaries
| ₹1.3 L/yr - ₹6.8 L/yr |
DENSO
MAHLE Behr India
Sanden Vikas
Valeo