Sterlite Power Grid Ventures Project Engineer Interview Questions and Answers

Updated 18 Dec 2021

Sterlite Power Grid Ventures Project Engineer Interview Experiences

1 interview found

I applied via Walk-in and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. To pull up brasing what machine is used
  • Ans. 

    A brazing torch is used to pull up brazing.

    • Brazing torch is a handheld tool that uses a mixture of fuel gas and oxygen to heat the metal to the required temperature.

    • The heat melts the brazing rod, which then flows into the joint and solidifies to form a strong bond.

    • Common types of brazing torches include oxy-acetylene, oxy-propane, and oxy-MAPP.

    • The torch is used to heat the joint until the brazing material melts and fl...

  • Answered by AI
  • Q2. What is the ratio of m20
  • Ans. 

    The question is incomplete and unclear. Please provide more information.

    • The question needs to specify what the ratio is referring to.

    • M20 is a grade of concrete used in construction.

    • The ratio of M20 concrete is typically 1:1.5:3 (cement:sand:aggregate).

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Lean about technical terms and basic think

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Basic Electrical Question as I am selected as GET
  • Q2. Losses in transformer, Parallel operations of Transmission, Difference between power transformer & distribution transformer.
  • Ans. 

    Losses in transformer, parallel operations of transmission, difference between power transformer & distribution transformer.

    • Losses in transformer include copper losses and iron losses.

    • Parallel operations of transmission lines involve synchronizing the voltage and frequency of the connected systems.

    • Power transformers are used in high voltage transmission systems, while distribution transformers are used in low voltage d

  • Answered by AI
  • Q3. Types of insulator used in Transmission & distribution line.
  • Ans. 

    Types of insulators used in transmission & distribution lines include pin type, suspension type, strain type, shackle type, and post type insulators.

    • Pin type insulators: used for low voltage distribution lines

    • Suspension type insulators: used for high voltage transmission lines

    • Strain type insulators: used to withstand mechanical stress

    • Shackle type insulators: used for supporting conductors at angles

    • Post type insulators:

  • Answered by AI
Interview experience
4
Good
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 6 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical related to your department
Round 3 - Technical 

(1 Question)

  • Q1. Technical related
Round 4 - HR 

(1 Question)

  • Q1. Basic PI and background
Round 5 - One-on-one 

(1 Question)

  • Q1. Technical with Global higher authority
Round 6 - HR 

(1 Question)

  • Q1. Basic and joining negotiations
Round 1 - Technical 

(1 Question)

  • Q1. Boiler and BOP equipment and its functioning
  • Ans. 

    Boiler and BOP equipment are crucial components of power plants that generate electricity.

    • Boiler is responsible for generating steam by burning fuel, which is then used to turn turbines and generate electricity.

    • BOP (Balance of Plant) equipment includes pumps, fans, and other auxiliary systems that support the operation of the boiler and turbines.

    • BOP equipment also includes systems for water treatment, ash handling, and...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Basic background detail and ex work documents

Interview Preparation Tips

Interview preparation tips for other job seekers - Shall have knowledge of power plant
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Basic Electrical Question as I am selected as GET
  • Q2. Losses in transformer, Parallel operations of Transmission, Difference between power transformer & distribution transformer.
  • Ans. 

    Losses in transformer, parallel operations of transmission, difference between power transformer & distribution transformer.

    • Losses in transformer include copper losses and iron losses.

    • Parallel operations of transmission lines involve synchronizing the voltage and frequency of the connected systems.

    • Power transformers are used in high voltage transmission systems, while distribution transformers are used in low voltage d

  • Answered by AI
  • Q3. Types of insulator used in Transmission & distribution line.
  • Ans. 

    Types of insulators used in transmission & distribution lines include pin type, suspension type, strain type, shackle type, and post type insulators.

    • Pin type insulators: used for low voltage distribution lines

    • Suspension type insulators: used for high voltage transmission lines

    • Strain type insulators: used to withstand mechanical stress

    • Shackle type insulators: used for supporting conductors at angles

    • Post type insulators:

  • Answered by AI

I applied via Referral and was interviewed in Nov 2017. There were 2 interview rounds.

Interview Preparation Tips

General Tips: Interview was good. Interviewer will judge your depth of skills in your field. They want punctual, dedicated employee in their organization. You should have knowledge of computer skills very well. The main thing is their follow up for their project.
Skills: Communication, Body Language, Problem Solving, Analytical Skills, Leadership, Presentation Skills, Time Management, Decision Making Skills
Duration: 1-4 weeks

Sterlite Power Grid Ventures Interview FAQs

What are the top questions asked in Sterlite Power Grid Ventures Project Engineer interview?

Some of the top questions asked at the Sterlite Power Grid Ventures Project Engineer interview -

  1. To pull up brasing what machine is u...read more
  2. What is the ratio of m...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 211 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
NTPC Interview Questions
4.2
 • 159 Interviews
Torrent Power Interview Questions
3.7
 • 125 Interviews
Inox Wind Interview Questions
3.7
 • 37 Interviews
JSW Energy Interview Questions
4.1
 • 26 Interviews
View all
Sterlite Power Grid Ventures Project Engineer Salary
based on 6 salaries
₹3.9 L/yr - ₹8.3 L/yr
15% more than the average Project Engineer Salary in India
View more details

Sterlite Power Grid Ventures Project Engineer Reviews and Ratings

based on 2 reviews

2.1/5

Rating in categories

3.6

Skill development

1.4

Work-life balance

1.4

Salary

1.0

Job security

3.6

Company culture

1.0

Promotions

1.4

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
15 salaries
unlock blur

₹6 L/yr - ₹11.5 L/yr

Manager
14 salaries
unlock blur

₹9.2 L/yr - ₹20 L/yr

Chief Manager
10 salaries
unlock blur

₹15 L/yr - ₹31.3 L/yr

Project Engineer
6 salaries
unlock blur

₹3.8 L/yr - ₹8.3 L/yr

Engineer
5 salaries
unlock blur

₹3.5 L/yr - ₹5.1 L/yr

Explore more salaries
Compare Sterlite Power Grid Ventures with

Adani Transmission

3.7
Compare

Power Grid Corporation of India

4.4
Compare

Tata Power

3.9
Compare

Reliance Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview