Filter interviews by
I applied via Referral and was interviewed in Apr 2022. There were 2 interview rounds.
Module testing involves testing individual units or modules of a software application.
Identify the individual modules to be tested
Develop test cases for each module
Execute the test cases and record the results
Fix any issues found during testing
Repeat the process for each module until all are tested
Transformer maintenance involves regular inspection, cleaning, and testing to ensure optimal performance and prevent breakdowns.
Inspect transformer components for signs of wear and tear
Clean transformer components to prevent buildup of dirt and debris
Test transformer oil for impurities and replace if necessary
Check for loose connections and tighten as needed
Monitor transformer temperature and vibration levels
Perform re...
Top trending discussions
I applied via Company Website and was interviewed before May 2021. There was 1 interview round.
Impedance is the measure of opposition to the flow of electric current in a circuit. DGR fundamental refers to the Dielectric Withstand Voltage test.
Impedance is measured in ohms and is the combination of resistance, capacitance, and inductance in a circuit.
DGR fundamental is a test to determine the maximum voltage a material can withstand without breaking down.
Basics of impedance include understanding the relationship...
I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
Impedance is the total opposition to the flow of alternating current in a circuit, while reactance is the opposition to the flow of alternating current caused by capacitance or inductance.
Impedance is a combination of resistance and reactance in a circuit.
Reactance is the opposition to the flow of alternating current caused by capacitance or inductance.
Capacitive reactance is the opposition to the flow of alternating c...
Plant load factor is calculated by dividing the actual energy generated by the maximum possible energy that could have been generated.
Plant load factor = Actual energy generated / Maximum possible energy that could have been generated
Maximum possible energy is calculated by multiplying the rated capacity of the plant with the number of hours in a given time period
Plant load factor is expressed as a percentage
It is used...
I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Apr 2023. There were 3 interview rounds.
GK AND OTHER KNOWLEDGE
I appeared for an interview before Nov 2016.
Yes, I am willing to work at any location for the Senior Engineer position.
I am open to relocating for the right opportunity
I have experience working in different locations
I am flexible and adaptable to new environments
I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.
I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.
I am adaptable and can quickly assess a situation to determine the best course of action.
I have strong problem-solving skills and can think creatively to find solutions in ad
Senior Manager
25
salaries
| ₹16.4 L/yr - ₹35 L/yr |
Senior Engineer
18
salaries
| ₹4.5 L/yr - ₹9 L/yr |
Deputy Manager
16
salaries
| ₹7 L/yr - ₹16 L/yr |
Manager
15
salaries
| ₹14 L/yr - ₹21 L/yr |
Assistant Manager
13
salaries
| ₹5 L/yr - ₹13 L/yr |
Suzlon Group
Adani Power
Adani Group
NTPC