posted on 24 Apr 2024
Water treatment process involves several steps to remove impurities and make water safe for consumption.
Coagulation and flocculation to remove particles
Sedimentation to settle out solids
Filtration to remove remaining particles
Disinfection to kill bacteria and viruses
pH adjustment to control acidity or alkalinity
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
posted on 30 Nov 2023
I appeared for an interview before Nov 2022.
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
posted on 22 Feb 2022
I applied via Walk-in
About your job, location, CTC
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 13 reviews
Rating in categories
Electrical Engineer
259
salaries
| ₹1.8 L/yr - ₹8.4 L/yr |
Senior Engineer
239
salaries
| ₹3.2 L/yr - ₹9.1 L/yr |
Project Engineer
198
salaries
| ₹2.4 L/yr - ₹8.5 L/yr |
Assistant Manager
187
salaries
| ₹4.3 L/yr - ₹17 L/yr |
Deputy Manager
146
salaries
| ₹5.7 L/yr - ₹22 L/yr |
Simplex Infrastructures
Aarvee Associates
Nasser S. Al Hajri Corporation
Ramky Infrastructure