Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by Sterling & Wilson Team. If you also belong to the team, you can get access from here

Sterling & Wilson Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Sterling & Wilson Assistant Manager- Purchase Interview Questions and Answers for Experienced

Updated 29 Oct 2021

Sterling & Wilson Assistant Manager- Purchase Interview Experiences for Experienced

1 interview found

I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About my previous experience and the present challenges which needs to be addresed before accepting the offer.

Interview Preparation Tips

Interview preparation tips for other job seekers - Sincere advice is do not get panic while attending interview attend with free of mind do not answer any question vaguely be open minded.

Interview questions from similar companies

Interview Preparation Tips

Round: Test
Experience: Almost all questions asked were from design section because the company was offering us design engineering jobs. Half of the questions you can attempt from applying your +2 basics, free body diagrams, projections etc.

Overall I found the paper checks your imaginative skills applied in engineering rather than formula oriented (mugged up) questions.
Tips: Be strong with your basics, that will help a lot
Duration: 60 minutes
Total Questions: 30

Round: Technical Interview
Experience: The tech team was great. Well experienced but very frank guys who will ease you during the interview. So all the best for your performance
Tips: Specially try to give correct answer or atleast the correct approach (preferably basic approach) for the questions you did wrong in the written test.

General Tips: Be positive and confident, always try to show your positive side & your improving nature
Skills: 12th class basic fundamentals, Engineering Drawing, Machine Drawing , Design engineering
College Name: NIT WARANGAL

I appeared for an interview before Jul 2016.

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 60

Round: Test
Duration: 30 minutes
Total Questions: 20

College Name: Bengal Institute of Technology and Management

I appeared for an interview before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. What is leveling
  • Ans. 

    Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.

    • Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.

    • It involves the use of leveling instruments such as a level, theodolite, or laser level.

    • The process typically includes setting up benchmarks or reference points, taking readings at different...

  • Answered by AI
  • Q2. What is dia of six mm
  • Ans. 

    The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.

    • The diameter is the distance across the center of a circle, passing through the circumference.

    • A six mm diameter can be visualized as a circle with a width of six millimeters.

    • It is a common measurement used in various industries, including engineering and manufacturing.

    • For example, a six mm diameter steel rod w...

  • Answered by AI
  • Q3. What is formula of lep
  • Ans. 

    LEP stands for Load Equivalent Factor for Pavement design.

    • LEP is used in pavement design to determine the load-carrying capacity of the pavement.

    • The formula for LEP depends on the specific design method being used.

    • For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))

    • Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...

  • Answered by AI

I applied via Campus Placement and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Technical questions asked in surveying,Strength of materials and some practical questions of my internships
  • Q2. UNIT WEIGHT Of steel
  • Ans. 

    The unit weight of steel refers to the weight of a specific volume of steel.

    • Unit weight is typically measured in pounds per cubic foot or kilograms per cubic meter.

    • The unit weight of steel can vary depending on the type and grade of steel.

    • For example, the unit weight of mild steel is approximately 7850 kilograms per cubic meter.

    • The unit weight of stainless steel is higher, ranging from 7480 to 8000 kilograms per cubic ...

  • Answered by AI
  • Q3. Question regarding cube test like what is strength of cube in 28 days
  • Ans. Fck +3(fck is grade of concrete) It is used when concrete casting quantity is greater than 30 meter cube and fck +4 ( when concrete casting quantity is less than 30 meter cube
  • Answered Anonymously
  • Q4. Slump test

Interview Preparation Tips

Interview preparation tips for other job seekers - See lecture civil guruji and strong command on technical subjects

Interview Questionnaire 

2 Questions

  • Q1. Tell me about your project?
  • Q2. Simply introduced your project.

I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. MEP Electrical Engineer with over 11 years experience.
  • Q2. If any requirment? Then will contact me

Interview Preparation Tips

Interview preparation tips for other job seekers - I have good knowledge of MEP Project.

I appeared for an interview in Sep 2021.

Interview Questionnaire 

1 Question

  • Q1. B.tech project

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basic Technical questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Role and responsibility of Project Manager
  • Ans. 

    Project Manager is responsible for planning, executing, and closing projects within budget and timeline.

    • Developing project plans and schedules

    • Managing project resources and budget

    • Monitoring project progress and addressing any issues

    • Communicating with stakeholders and team members

    • Ensuring project goals are met within scope and quality standards

  • Answered by AI
  • Q2. Describe Launching of O.W. Girder
  • Ans. 

    Launching of O.W. Girder involves carefully positioning and securing the girder in place for construction purposes.

    • Ensure proper alignment of the girder with the existing structure

    • Use cranes or other heavy machinery to lift and place the girder in position

    • Secure the girder using bolts or welding for stability

    • Inspect the girder for any defects or damage before launching

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company for Railway project
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Why your cgpa is less in 1st year ?
  • Q2. Tell about your strong subject.

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of subjects must be known for engineering.

Tell us how to improve this page.

Interview Questions from Similar Companies

Tractebel Interview Questions
4.1
 • 42 Interviews
Neilsoft Interview Questions
3.5
 • 41 Interviews
View all
Sterling & Wilson Assistant Manager- Purchase Salary
based on 13 salaries
₹5.6 L/yr - ₹10.1 L/yr
7% less than the average Assistant Manager- Purchase Salary in India
View more details

Sterling & Wilson Assistant Manager- Purchase Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

3.9

Skill development

4.0

Work-life balance

4.0

Salary

3.1

Job security

3.9

Company culture

2.9

Promotions

3.0

Work satisfaction

Explore 2 Reviews and Ratings
Electrical Engineer
259 salaries
unlock blur

₹1.8 L/yr - ₹8.4 L/yr

Senior Engineer
239 salaries
unlock blur

₹3.2 L/yr - ₹9.1 L/yr

Project Engineer
198 salaries
unlock blur

₹2.4 L/yr - ₹8.5 L/yr

Assistant Manager
187 salaries
unlock blur

₹4.3 L/yr - ₹17 L/yr

Deputy Manager
146 salaries
unlock blur

₹5.7 L/yr - ₹22 L/yr

Explore more salaries
Compare Sterling & Wilson with

Simplex Infrastructures

3.4
Compare

Aarvee Associates

3.9
Compare

Nasser S. Al Hajri Corporation

3.6
Compare

Ramky Infrastructure

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview