Filter interviews by
I applied via Naukri.com and was interviewed before Oct 2020. There were 3 interview rounds.
Top trending discussions
posted on 23 Jan 2024
Depreciation is the decrease in value of an asset over time due to wear and tear, obsolescence, or other factors.
Depreciation is a non-cash expense that is recorded on the income statement.
It is used to allocate the cost of an asset over its useful life.
Depreciation methods include straight-line, declining balance, and units of production.
For example, a company may depreciate a vehicle over 5 years, spreading the cost ...
posted on 22 Jun 2024
Some questions were asked in multiple choice
I applied via Campus Placement and was interviewed before Dec 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Jul 2020. There were 5 interview rounds.
CFMEA stands for Control Failure Mode and Effects Analysis.
CFMEA is a systematic approach used to identify and mitigate potential failures in a process or system.
It involves analyzing failure modes, their causes, and the potential effects on the process or system.
CFMEA helps in prioritizing and implementing control measures to prevent or minimize failures.
It is commonly used in industries such as manufacturing, automot...
System level DFMEA is given main preference.
System level DFMEA considers the entire system and its interactions.
Component level DFMEA focuses on individual components.
System level DFMEA is more comprehensive and effective in identifying potential failures.
Example: In automotive industry, system level DFMEA would consider the entire vehicle and its subsystems.
Example: In medical devices, system level DFMEA would conside...
I applied via Naukri.com and was interviewed before Dec 2019. There were 5 interview rounds.
Implementing lean manufacturing principles, optimizing machine utilization, and investing in automation can improve productivity in machine shops.
Implementing lean manufacturing principles such as 5S, Kaizen, and Kanban can help reduce waste and improve efficiency.
Optimizing machine utilization by scheduling preventive maintenance, reducing setup times, and improving workflow can increase productivity.
Investing in auto...
ABC costing is a method of assigning costs to products based on their consumption of resources. Industrial engineers play a key role in implementing and optimizing ABC costing systems.
ABC costing stands for Activity-Based Costing
It is a method of assigning costs to products based on the resources they consume
Industrial engineers play a key role in implementing and optimizing ABC costing systems
They help identify the ac...
VA/VE stands for Value Analysis/Value Engineering. It is a systematic approach to improve the value of a product or service.
VA/VE aims to reduce costs while maintaining or improving the quality of the product or service.
It involves analyzing the functions of a product or service and identifying areas where costs can be reduced without compromising quality.
Examples of VA/VE projects include redesigning a product to use ...
I applied via Shine and was interviewed before Dec 2020. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
Senior Engineer
292
salaries
| ₹5 L/yr - ₹19 L/yr |
Assistant Manager
212
salaries
| ₹7.9 L/yr - ₹18 L/yr |
Senior Manager
144
salaries
| ₹12 L/yr - ₹40 L/yr |
Deputy Manager
138
salaries
| ₹9.5 L/yr - ₹21.5 L/yr |
Manager
115
salaries
| ₹11.2 L/yr - ₹28 L/yr |
Tata Motors
Maruti Suzuki
Ashok Leyland
Hero MotoCorp