Filter interviews by
I applied via Referral and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
posted on 28 Aug 2022
I applied via Referral and was interviewed in Feb 2022. There were 3 interview rounds.
I applied via LinkedIn
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
posted on 4 Oct 2024
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There were 2 interview rounds.
Yes, I am interested in joining the plant as a Senior Manager.
I have experience in managing teams and projects
I am excited about the opportunity to contribute to the growth and success of the plant
I am confident in my ability to lead and make strategic decisions
I have led cross-functional teams to successfully launch multiple products, resulting in increased market share and revenue growth.
Led cross-functional teams in product launches
Achieved increased market share and revenue growth
Implemented successful strategies for product development
Collaborated with stakeholders to drive project success
posted on 12 Oct 2023
Electrical engineering involves designing, developing, and maintaining electrical systems, while power transmission projects focus on transmitting electricity over long distances.
Electrical engineering encompasses a wide range of disciplines, including power generation, transmission, and distribution.
Power transmission projects involve designing and implementing systems to efficiently transmit electricity from power pl...
I applied via Approached by Company and was interviewed in Dec 2023. There were 2 interview rounds.
The size of t& p's refers to the dimensions or measurements of the t& p's.
The size of t& p's can be determined by measuring their length, width, and height.
For example, if the t& p's are rectangular in shape, their size can be described as 10 inches long, 5 inches wide, and 3 inches high.
Alternatively, if the t& p's are cylindrical, their size can be described as having a diameter of 2 inches and a height of 6 inches.
Loss of conductor in stringing work refers to the accidental detachment or breakage of the conductor during the process of stringing it.
Loss of conductor can occur due to improper handling or tensioning during stringing.
It can also happen if the conductor is damaged or weakened before or during the stringing process.
Loss of conductor can lead to power outages, equipment damage, and safety hazards.
Proper training, equip...
posted on 11 Dec 2024
Coding questions based on core Java and DSA
based on 1 review
Rating in categories
Project Engineer
5
salaries
| ₹3 L/yr - ₹5.2 L/yr |
Quality Manager
4
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Senior Engineer
3
salaries
| ₹6.1 L/yr - ₹6.1 L/yr |
Project Manager
3
salaries
| ₹6.4 L/yr - ₹6.5 L/yr |
Junior Engineer
3
salaries
| ₹1.1 L/yr - ₹1.8 L/yr |
Jindal Group Of Companies
Ms Agarwal Foundries
Patton International
Shri Mahavir Ferro Alloys