I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Dec 2020. There were 3 interview rounds.
posted on 19 Oct 2023
I applied via Job Fair
posted on 26 Mar 2024
I applied via Approached by Company and was interviewed before Mar 2023. There were 3 interview rounds.
Oil-filled transformers are better due to higher efficiency and lower maintenance requirements. Test runs should include insulation resistance, turns ratio, and load testing.
Oil-filled transformers are better than dry-type transformers due to higher efficiency and lower maintenance requirements.
Test runs should include insulation resistance testing to check for any insulation breakdown.
Turns ratio testing should be con...
The Blast Furnace is equipped with multiple RIO panels and a variety of DI/DO and AI/AO channels.
The Blast Furnace typically has several RIO panels installed for monitoring and control purposes.
The number of DI/DO channels provided in a Blast Furnace can vary depending on the specific setup and requirements.
During commissioning, major problems may include issues with sensor calibration, communication errors, or softwar...
I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
I achieved a 150% increase in sales target by implementing a new marketing strategy.
Set ambitious but achievable targets
Analyzed market trends and customer behavior
Implemented a new marketing strategy focusing on customer engagement
Provided training and motivation to the sales team
Regularly monitored progress and made adjustments as needed
I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2022. There were 2 interview rounds.
To make a budget for a project, identify all expenses and allocate funds accordingly.
Identify all expenses including labor, materials, equipment, and any other costs
Estimate the cost of each expense and allocate funds accordingly
Consider any potential risks or unexpected expenses and allocate contingency funds
Regularly review and adjust the budget as needed throughout the project
Use budgeting software or tools to help ...
The rate of RCC, reinforcement, or shuttering can be analyzed through various factors.
Factors affecting the rate of RCC include the type of concrete mix, the size and shape of the structure, and the location of the project.
Reinforcement rates depend on the type and size of the reinforcement used, as well as the complexity of the design.
Shuttering rates are influenced by the type of material used, the size and shape of ...
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Assistant Manager
27
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Larsen & Toubro Limited
Jindal Steel and Power
Steel Authority Of India