Rankine Cycle is a thermodynamic cycle used in steam power plants to convert heat energy into mechanical work.
Rankine Cycle is a theoretical cycle that consists of four processes: compression, heat addition, expansion, and heat rejection.
It is commonly used in steam power plants to generate electricity.
The cycle begins with the compression of a working fluid (usually water) in a pump.
The compressed fluid then enters a ...
Top trending discussions
Nitrogen gas is used in accumulators due to its inert properties and ability to maintain pressure for extended periods of time.
Nitrogen gas is inert, meaning it does not react with other substances, making it ideal for maintaining pressure without causing corrosion or contamination.
It is also non-flammable, which reduces the risk of fire hazards in accumulator systems.
Nitrogen gas has a stable temperature range, allowi...
Accumulator is used in WTG to store excess energy generated by the wind turbine for later use.
Accumulator helps in smoothing out the power output from the wind turbine.
It allows for energy storage when the demand is low and release of stored energy when the demand is high.
Accumulators can also help in providing backup power during periods of low wind.
Examples of accumulators used in WTG include batteries, flywheels, an
Numerical, logical reasoning, verbal ability
General topic on current affair in power sector
I applied via Walk-in and was interviewed in Aug 2023. There were 3 interview rounds.
posted on 19 Feb 2022
I applied via Walk-in and was interviewed in Oct 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
Overhauling procedure of turbine and generator involves disassembly, inspection, repair, and reassembly.
Disassemble turbine and generator components
Inspect components for wear and damage
Repair or replace damaged components
Reassemble components and test for proper function
posted on 5 Feb 2015
Interview experience
based on 36 reviews
Rating in categories
Senior Engineer
266
salaries
| ₹4.1 L/yr - ₹9 L/yr |
Engineer
187
salaries
| ₹2.8 L/yr - ₹9.9 L/yr |
Assistant Manager
185
salaries
| ₹5.2 L/yr - ₹12.5 L/yr |
Deputy Manager
162
salaries
| ₹6.2 L/yr - ₹16 L/yr |
Manager
92
salaries
| ₹8.9 L/yr - ₹26 L/yr |
Thermax Limited
Siemens
BGR Energy Systems
BHEL