Improving the process involves identifying bottlenecks, streamlining workflows, implementing automation, and seeking feedback from stakeholders.
Identify bottlenecks in the current process and address them accordingly
Streamline workflows to eliminate unnecessary steps and improve efficiency
Implement automation tools to reduce manual tasks and increase productivity
Seek feedback from stakeholders to understand pain points
Handling work load requires effective time management, prioritization, delegation, and communication.
Prioritize tasks based on urgency and importance
Break down large tasks into smaller, manageable chunks
Delegate tasks to team members based on their strengths and workload capacity
Communicate clearly with colleagues and supervisors about workload and deadlines
Use tools like to-do lists, calendars, and project management
posted on 8 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Reheater protection is a safety measure to prevent damage to the reheater in a power plant.
Reheater protection is necessary to prevent overheating and damage to the reheater.
It involves monitoring the temperature and pressure of the reheater and shutting down the system if necessary.
Reheater protection can be achieved through the use of sensors, alarms, and automatic shutdown systems.
Examples of reheater protection sys...
Cold start procedure is the process of starting a system or machine from a completely shut down state.
Check power source and ensure it is connected properly
Turn on the machine or system
Check for any error messages or warnings
Allow the machine or system to warm up or stabilize before use
Perform any necessary system checks or tests before use
HP Lp bypass system is a feature in HP printers that allows the printer to continue printing even if one of the ink cartridges is empty.
HP Lp bypass system is designed to prevent printing from stopping due to an empty ink cartridge.
When the printer detects an empty cartridge, it automatically switches to the bypass mode and uses the remaining cartridges to continue printing.
This feature is particularly useful in situat...
The condenser vacuum should be maintained at a level between 28-29 inches of mercury.
The vacuum level is important for efficient operation of the condenser.
The ideal vacuum level is between 28-29 inches of mercury.
If the vacuum level is too low, it can cause reduced efficiency and increased energy consumption.
If the vacuum level is too high, it can cause damage to the condenser.
Regular monitoring and maintenance of the...
Scoop control refers to the process of managing the amount of material being scooped or loaded onto a vehicle or machine.
It involves monitoring the weight and volume of the material being loaded.
Scoop control is important for ensuring safety and preventing overloading.
Examples of machines that use scoop control include excavators, bulldozers, and front-end loaders.
I applied via Company Website and was interviewed in Mar 2021. There were 3 interview rounds.
I was interviewed in Oct 2023.
Interview experience
based on 1 review
Rating in categories
Senior Engineer
281
salaries
| ₹4.1 L/yr - ₹9.5 L/yr |
Engineer
187
salaries
| ₹2.8 L/yr - ₹9.9 L/yr |
Assistant Manager
185
salaries
| ₹5.9 L/yr - ₹12.5 L/yr |
Deputy Manager
165
salaries
| ₹6.2 L/yr - ₹16 L/yr |
Manager
92
salaries
| ₹8.9 L/yr - ₹22.3 L/yr |
Thermax Limited
Siemens
BGR Energy Systems
BHEL