I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.
Corona effect is the phenomenon of ionization and luminous discharge around a conductor carrying high voltage in air.
Occurs when the electric field strength around a conductor exceeds the breakdown strength of air
Results in ionization of air molecules and formation of a luminous discharge or corona
Can cause power loss, radio interference, and damage to equipment
Examples include the hissing sound from high voltage power
Generation is the process of producing electricity, transmission is the movement of electricity over long distances, and distribution is the delivery of electricity to consumers.
Generation involves converting energy sources such as coal, natural gas, or wind into electricity.
Transmission involves high voltage power lines that transport electricity over long distances from power plants to substations.
Distribution involv...
The primary side of a transformer can be found by checking the voltage rating on the nameplate.
Check the nameplate for voltage rating
The higher voltage rating is usually the primary side
Use a multimeter to confirm the primary side
Top trending discussions
posted on 10 Jul 2024
RDBMS stands for Relational Database Management System, a type of database management system that stores data in a structured format.
Organizes data into tables with rows and columns
Uses SQL for querying and managing data
Supports ACID properties for data consistency
Examples: MySQL, Oracle Database, SQL Server
I applied via Naukri.com and was interviewed in Sep 2022. There were 3 interview rounds.
Nominal minimum covers for different structures are the minimum thickness of concrete or other materials required to protect the reinforcement from corrosion and provide durability.
Nominal minimum cover is specified to prevent corrosion of reinforcement and ensure structural integrity.
The minimum cover requirements vary depending on the type of structure and its exposure conditions.
For reinforced concrete structures, t...
Inspections for wall plastering include surface preparation, thickness, curing time, and finish.
Check if the surface is clean and free from dust and debris before applying plaster
Ensure the thickness of the plaster is uniform throughout the wall
Check the curing time of the plaster before applying paint or wallpaper
Inspect the finish of the plaster for any cracks or unevenness
Reinforcement checks for structural elements like column beam or slabs
Check for proper placement and spacing of reinforcement bars
Ensure the diameter and grade of reinforcement bars meet design specifications
Check for proper cover of reinforcement bars
Inspect for any damage or corrosion of reinforcement bars
Verify that the reinforcement detailing matches the design drawings
ITP stands for Inspection and Test Plan while MTP stands for Method Statement and Test Plan.
ITP is a document that outlines the inspection and testing activities that will be carried out during a project.
MTP is a document that outlines the methodology and procedures that will be used to carry out a specific task or activity.
ITP is usually prepared by the quality control team while MTP is prepared by the project managem...
posted on 26 Apr 2023
posted on 24 Jan 2024
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
Earthing is the process of connecting electrical equipment or installations to the earth to prevent electric shock and protect against electrical faults.
Earthing involves creating a connection between the electrical system and the earth.
It is done by burying a metal conductor, such as a copper rod, in the ground.
The metal conductor is connected to the electrical system using a wire or cable.
Earthing provides a path for...
The type of DGs used at our site are diesel generators.
Diesel generators are commonly used as backup power sources in various industries.
They are reliable and can provide a continuous power supply during electrical outages.
DGs are often used in remote locations or areas with unreliable grid power.
They require regular maintenance and fuel supply to operate efficiently.
Examples of DGs used at our site include Cummins, Ca
LT line refers to Low Tension line while HT line refers to High Tension line.
LT line carries low voltage and is used for domestic and small-scale commercial purposes.
HT line carries high voltage and is used for industrial and large-scale commercial purposes.
LT line voltage is typically up to 440 volts, while HT line voltage is above 440 volts.
LT lines are usually overhead lines, while HT lines can be both overhead and ...
We used different types of circuit breakers at the site depending on the specific requirements.
We used air circuit breakers (ACBs) for low voltage applications.
For medium voltage applications, we used vacuum circuit breakers (VCBs) or oil circuit breakers (OCBs).
In high voltage installations, we used sulfur hexafluoride (SF6) circuit breakers.
For specialized applications like generator protection, we used differential ...
The size of transformers used at the site varied depending on the specific requirements of the project.
Transformers used at the site were of different sizes based on the power demand of the electrical system.
For smaller projects, transformers with a capacity of around 100 kVA were used.
For medium-sized projects, transformers with a capacity ranging from 250 kVA to 500 kVA were used.
For larger projects, transformers wit...
We used a stationary type batching plant at the site.
We used a stationary type batching plant for our construction project.
The stationary batching plant had a higher production capacity compared to mobile plants.
It was equipped with multiple storage bins for different types of aggregates.
The plant had a conveyor belt system to transfer the aggregates to the mixer.
We used this type of batching plant because it provided
I applied via Naukri.com and was interviewed in Aug 2022. There were 3 interview rounds.
posted on 2 Mar 2022
I applied via AmbitionBox and was interviewed in Oct 2021. There were 2 interview rounds.
There are four members in my family first of my respected father government sarvent then my lovely mother she has been source of inspiration and motivation for me she is house maker other family are one younger sister both are studying
I applied via Campus Placement and was interviewed before Nov 2020. There was 1 interview round.
posted on 10 Jul 2024
RDBMS stands for Relational Database Management System, a type of database management system that stores data in a structured format.
Organizes data into tables with rows and columns
Uses SQL for querying and managing data
Supports ACID properties for data consistency
Examples: MySQL, Oracle Database, SQL Server
I applied via Naukri.com and was interviewed in Sep 2022. There were 3 interview rounds.
Nominal minimum covers for different structures are the minimum thickness of concrete or other materials required to protect the reinforcement from corrosion and provide durability.
Nominal minimum cover is specified to prevent corrosion of reinforcement and ensure structural integrity.
The minimum cover requirements vary depending on the type of structure and its exposure conditions.
For reinforced concrete structures, t...
Inspections for wall plastering include surface preparation, thickness, curing time, and finish.
Check if the surface is clean and free from dust and debris before applying plaster
Ensure the thickness of the plaster is uniform throughout the wall
Check the curing time of the plaster before applying paint or wallpaper
Inspect the finish of the plaster for any cracks or unevenness
Reinforcement checks for structural elements like column beam or slabs
Check for proper placement and spacing of reinforcement bars
Ensure the diameter and grade of reinforcement bars meet design specifications
Check for proper cover of reinforcement bars
Inspect for any damage or corrosion of reinforcement bars
Verify that the reinforcement detailing matches the design drawings
ITP stands for Inspection and Test Plan while MTP stands for Method Statement and Test Plan.
ITP is a document that outlines the inspection and testing activities that will be carried out during a project.
MTP is a document that outlines the methodology and procedures that will be used to carry out a specific task or activity.
ITP is usually prepared by the quality control team while MTP is prepared by the project managem...
based on 11 reviews
Rating in categories
Assistant Engineer
52
salaries
| ₹2.9 L/yr - ₹4.6 L/yr |
Senior Engineer
41
salaries
| ₹3.9 L/yr - ₹7.1 L/yr |
Junior Engineer
35
salaries
| ₹1.6 L/yr - ₹3.9 L/yr |
Senior Store Officer
24
salaries
| ₹3.4 L/yr - ₹5.4 L/yr |
Assistant Manager
18
salaries
| ₹5.2 L/yr - ₹7 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company