i
Spark Minda
Filter interviews by
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Explain the Words: Think about this from another person's perspective. ...
Top trending discussions
posted on 19 Jan 2018
I applied via Naukri.com and was interviewed before Aug 2020. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.
Types of gearboxes include manual, automatic, and CVT. Common thread types are metric, imperial, and pipe threads. M8 bolt requires 6.8mm drill and M8 tap. Types of bearing assembly include ball bearings, roller bearings, and sleeve bearings.
Types of gearboxes: manual, automatic, CVT
Types of threads: metric, imperial, pipe threads
For M8 bolt: 6.8mm drill and M8 tap
Types of bearing assembly: ball bearings, roller bearin
Pump function refers to the operation of a pump, which is a device that moves fluids through mechanical action. 5S and TPM are methodologies for improving efficiency and maintenance in a workplace.
Pump function involves the movement of fluids through mechanical action, such as in a water pump or oil pump.
There are different types of pumps, including centrifugal pumps, positive displacement pumps, and submersible pumps.
...
Types of ball screws, checking and removing backlash, parameters to check for spindle breakdown
Types of ball screws include precision ground, rolled, and miniature ball screws
To check backlash in a ball screw, use a dial indicator to measure the axial movement of the screw without rotation
Backlash in a ball screw can be removed by adjusting the preload or replacing worn components
Parameters to check for spindle breakdo...
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
posted on 18 Nov 2024
Related to manufacturing
Manufacturing of gears involves various processes including grinding which can be done through different types of grinding machines.
Gears can be manufactured through processes like hobbing, shaping, milling, and grinding.
Grinding is the process of removing material from a workpiece using a grinding wheel.
Types of grinding machines used for gear manufacturing include cylindrical grinding machines, centerless grinding ma...
based on 1 interview
Interview experience
Assistant Manager
409
salaries
| ₹4.1 L/yr - ₹15.7 L/yr |
Senior Engineer
235
salaries
| ₹2.2 L/yr - ₹10.1 L/yr |
Deputy Manager
235
salaries
| ₹6.8 L/yr - ₹23.5 L/yr |
Quality Engineer
225
salaries
| ₹1.4 L/yr - ₹5.7 L/yr |
Engineer
174
salaries
| ₹2.2 L/yr - ₹6 L/yr |
JBM Group
Subros
Endurance Technologies
Gabriel India