I appeared for an interview before Mar 2024, where I was asked the following questions.
Implementing strategic planning, efficient resource management, and innovative technologies can significantly reduce project costs.
Conduct thorough project planning to identify potential cost-saving opportunities early.
Utilize advanced project management software to track expenses and optimize resource allocation.
Negotiate better rates with suppliers and contractors to lower material and labor costs.
Implement lean manu...
I have extensive experience in instrumentation projects within the steel sector, focusing on automation and process optimization.
Led a project to implement a new DCS system, improving process control and reducing downtime by 15%.
Worked on the installation of advanced sensors for temperature and pressure monitoring, enhancing safety and efficiency.
Collaborated with cross-functional teams to integrate instrumentation wit...
Implementing strategic measures can significantly reduce project costs in instrumentation for the steel sector.
Conduct a thorough cost analysis to identify areas of overspending.
Utilize value engineering to optimize design and reduce material costs.
Negotiate bulk purchasing agreements with suppliers to lower material costs.
Implement lean project management techniques to minimize waste and improve efficiency.
Invest in t...
When a skip car gets tripped, I will immediately assess the situation, ensure the safety of personnel, investigate the cause of the trip, and take necessary actions to rectify the issue.
Assess the situation: Determine the extent of the trip and any potential hazards.
Ensure safety: Evacuate personnel from the area and secure the skip car to prevent further accidents.
Investigate the cause: Examine the skip car's componen...
Coke rush refers to the rapid combustion of coke in a blast furnace, while coke mesh is a measure of the size distribution of coke particles.
Coke rush occurs when coke particles burn too quickly, leading to reduced efficiency and increased emissions in the blast furnace.
Coke mesh is determined by the size of the coke particles, which affects the permeability and porosity of the coke bed in the blast furnace.
Coke mesh s...
To revive a chilled furnace, you need to follow a specific procedure.
Inspect the furnace for any visible damage or blockages
Check the fuel supply and ensure it is sufficient
Restart the furnace by igniting the pilot light or heating element
Monitor the temperature and adjust the settings as needed
Perform regular maintenance to prevent future issues
Seeking new challenges and opportunities for growth.
Looking for new challenges and opportunities to grow professionally
Interested in exploring different industries or technologies
Seeking a company with better work-life balance or benefits
Want to relocate to a different city or country for personal reasons
Top trending discussions
I applied via Naukri.com and was interviewed in Aug 2021. There were 5 interview rounds.
Africa is a continent with 54 countries, each with its own unique culture, history, and natural resources.
Africa has 54 countries
The largest country in Africa is Algeria
The most populous country in Africa is Nigeria
Egypt is known for its ancient pyramids and Sphinx
South Africa is known for its wildlife and natural beauty
Kenya is known for its wildlife and safaris
Ethiopia is known for its coffee and ancient history
Ghana...
I appeared for an interview before Apr 2022.
A cooling tower is a device used to remove heat from a building or industrial process.
The function of a cooling tower is to cool down water or other fluids by extracting heat from them.
Cooling towers are commonly used in HVAC systems, power plants, and industrial processes.
They work by evaporating a small portion of the water, which removes heat and cools down the remaining water.
The cooled water is then circulated bac...
To dismantle a boiler feed pump, follow these steps
Isolate the pump from the power source and drain the water from the system
Remove the coupling and motor from the pump
Disconnect the suction and discharge piping from the pump
Remove the bolts and nuts that hold the pump casing together
Lift the casing off the pump and remove the impeller and shaft
Inspect and clean all parts before reassembling or replacing
I applied via Recruitment Consulltant and was interviewed before Sep 2023. There were 2 interview rounds.
I use various tools for purchase such as procurement software, vendor management systems, and e-procurement platforms.
Procurement software
Vendor management systems
E-procurement platforms
As an Associate, my role involves supporting senior team members, conducting research, analyzing data, and assisting with project management.
Supporting senior team members in various tasks
Conducting research and gathering data for projects
Analyzing data to provide insights and recommendations
Assisting with project management tasks such as scheduling and coordination
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
PTP process stands for Procure-to-Pay process, which involves the steps from purchasing goods/services to making payment.
PTP process starts with requisitioning of goods/services by a department.
Next step involves obtaining quotes, selecting a vendor, and creating a purchase order.
Goods/services are received, and invoices are matched with the purchase order.
Payment is made to the vendor based on the invoice.
The process ...
I applied via Recruitment Consulltant and was interviewed in Dec 2021. There were 2 interview rounds.
Recent projects and deliverables
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
I am a highly motivated individual with a strong background in management and customer service.
I have over 5 years of experience in management roles, including leading teams of up to 20 employees.
I am skilled in problem-solving and conflict resolution, and have a proven track record of improving customer satisfaction ratings.
I am also experienced in training and development, having created and implemented successful tr...
My KRA in my last company was to increase sales revenue by 15% within the first quarter.
My KRA was to increase sales revenue by 15% within the first quarter
I achieved this by implementing a new sales strategy and training the sales team
I also analyzed market trends and identified new opportunities for growth
Regularly monitored and reported on sales performance to senior management
based on 54 reviews
Rating in categories
Assistant Manager
10
salaries
| ₹4 L/yr - ₹10 L/yr |
Assistant Engineer
10
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Mechanical Engineer
9
salaries
| ₹2.5 L/yr - ₹3.2 L/yr |
Electrical Engineer
7
salaries
| ₹2 L/yr - ₹4 L/yr |
Junior Manager
7
salaries
| ₹3.5 L/yr - ₹4.8 L/yr |
African Industries
Nava Limited
Rio Tinto
Pilot Industries