Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Dec 2021. There were 2 interview rounds.
Recent projects and deliverables
I applied via Naukri.com and was interviewed in Aug 2021. There were 5 interview rounds.
Africa is a continent with 54 countries, each with its own unique culture, history, and natural resources.
Africa has 54 countries
The largest country in Africa is Algeria
The most populous country in Africa is Nigeria
Egypt is known for its ancient pyramids and Sphinx
South Africa is known for its wildlife and natural beauty
Kenya is known for its wildlife and safaris
Ethiopia is known for its coffee and ancient history
Ghana...
I appeared for an interview before Apr 2022.
A cooling tower is a device used to remove heat from a building or industrial process.
The function of a cooling tower is to cool down water or other fluids by extracting heat from them.
Cooling towers are commonly used in HVAC systems, power plants, and industrial processes.
They work by evaporating a small portion of the water, which removes heat and cools down the remaining water.
The cooled water is then circulated bac...
To dismantle a boiler feed pump, follow these steps
Isolate the pump from the power source and drain the water from the system
Remove the coupling and motor from the pump
Disconnect the suction and discharge piping from the pump
Remove the bolts and nuts that hold the pump casing together
Lift the casing off the pump and remove the impeller and shaft
Inspect and clean all parts before reassembling or replacing
I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.
Interview pending kindly review my profile
Coding test pending.kindly updated now
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
There was no proper question in the aptitude test and no support received on queries from HR
I handled my previous job by effectively delegating tasks, providing support to team members, and ensuring goals were met.
Delegated tasks based on team members' strengths and workload
Provided support and guidance to team members when needed
Monitored progress towards goals and made adjustments as necessary
I can adopt various methods such as setting clear goals, providing regular feedback, fostering teamwork, and implementing effective communication strategies.
Setting clear goals and expectations for team members
Providing regular feedback and performance evaluations
Fostering teamwork and collaboration among team members
Implementing effective communication strategies such as regular team meetings and open-door policy
There are various types of engines used in construction equipment.
Diesel engines are commonly used in construction equipment due to their high torque and fuel efficiency.
Gasoline engines are also used in smaller construction equipment.
Electric engines are becoming more popular for their low noise and zero emissions.
Hybrid engines combine the benefits of both diesel and electric engines.
Some construction equipment may a...
I appeared for an interview before May 2016.
I have strong leadership and communication skills that are better suited for a non-technical role.
I excel in managing teams and resolving conflicts
I have a knack for strategic planning and decision-making
I enjoy interacting with customers and providing excellent service
posted on 25 Oct 2017
I appeared for an interview before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
based on 8 reviews
Rating in categories
Production Engineer
37
salaries
| ₹2.3 L/yr - ₹7.2 L/yr |
Quality Engineer
21
salaries
| ₹1.6 L/yr - ₹4.6 L/yr |
Senior Engineer
20
salaries
| ₹5 L/yr - ₹7.9 L/yr |
Assistant Manager
19
salaries
| ₹5.4 L/yr - ₹8.4 L/yr |
Engineer
18
salaries
| ₹3 L/yr - ₹6.2 L/yr |
African Industries
Ashapura Group Of Industries
Nava Limited
Toyota Tsusho