Filter interviews by
I appeared for an interview in Feb 2025.
Understanding product types and production methods is crucial for effective supervision in any industry.
Types of products can be categorized into consumer goods (e.g., electronics, clothing) and industrial goods (e.g., machinery, raw materials).
Production methods include batch production (e.g., bakery items), mass production (e.g., automobiles), and custom production (e.g., bespoke furniture).
Lean manufacturing focuses...
Bearings are mechanical components that reduce friction between moving parts, enhancing efficiency and performance in various applications.
1. Ball Bearings: Used in electric motors and bicycles for smooth rotation.
2. Roller Bearings: Common in heavy machinery and automotive applications for load support.
3. Thrust Bearings: Designed to handle axial loads, used in gearboxes and turbines.
4. Magnetic Bearings: Used in high...
Valves control fluid flow in various applications, each type serving specific functions in systems.
Gate Valve: Used for on/off control, ideal for high-pressure applications.
Globe Valve: Provides good throttling capability, commonly used in flow regulation.
Ball Valve: Offers quick shut-off, widely used in plumbing and gas applications.
Butterfly Valve: Lightweight and compact, suitable for large volume flow control.
Check...
I appeared for an interview in Oct 2024, where I was asked the following questions.
Understanding permit processes in safety management ensures effective hazard identification and risk assessment.
Permit to Work (PTW): A formal document ensuring that work is done safely, e.g., hot work permits for welding.
Hazard Identification and Risk Assessment (HIRA): Systematic process to identify hazards and assess risks, e.g., evaluating chemical exposure.
Job Safety Analysis (JSA): A tool to identify hazards asso...
I appeared for an interview in Oct 2024, where I was asked the following questions.
SOLAR INDUSTRIES INDIA interview questions for popular designations
I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.
Led a team in developing a mobile app for tracking fitness goals and progress.
Managed a team of 5 developers and designers
Implemented gamification features to increase user engagement
Integrated with wearable devices for real-time data tracking
Green field projects face challenges such as lack of existing infrastructure, resource allocation, and regulatory hurdles.
Lack of existing infrastructure can lead to delays and increased costs.
Resource allocation may be difficult due to competing priorities within the organization.
Regulatory hurdles, such as obtaining permits and approvals, can slow down the project timeline.
Environmental impact assessments may be requ
Previous CTC includes both fixed and variable components.
Previous CTC consisted of a fixed salary component and a variable component based on performance or targets.
For example, if the fixed salary was $50,000 and the variable component was 10% of the annual sales, the total CTC would be $50,000 + (10% of sales).
Seeking new challenges and opportunities for growth.
Looking for a new challenge to further develop my skills and knowledge.
Interested in exploring different industries and gaining diverse experience.
Seeking opportunities for career advancement and personal growth.
Get interview-ready with Top SOLAR INDUSTRIES INDIA Interview Questions
I appeared for an interview in Apr 2023, where I was asked the following questions.
There are several types of inventory, including raw materials, work-in-progress, finished goods, and maintenance supplies.
Raw Materials: Basic materials used in production, e.g., steel for manufacturing.
Work-in-Progress (WIP): Items that are in the production process, e.g., partially assembled cars.
Finished Goods: Completed products ready for sale, e.g., packaged electronics.
Maintenance, Repair, and Operations (MRO): S...
As a Warehouse Manager, I currently oversee a team of 15 employees, ensuring efficient operations and safety protocols.
Team Size: I manage a team of 15 warehouse staff, including pickers, packers, and forklift operators.
Training: I conduct regular training sessions to enhance skills and ensure safety compliance.
Performance Monitoring: I implement KPIs to track productivity and address any performance issues promptly.
Sa...
I appeared for an interview in Feb 2025, where I was asked the following questions.
Calibration is the process of adjusting and verifying the accuracy of measurement instruments to ensure reliable results.
Ensures measurement accuracy: For example, calibrating a thermometer to ensure it reads the correct temperature.
Involves comparison: Instruments are compared against a standard reference to identify discrepancies.
Regular intervals: Calibration should be performed at regular intervals to maintain accu...
An error is a deviation from accuracy or correctness, often leading to unintended outcomes in processes or systems.
Errors can occur in various forms, such as human errors, system errors, or procedural errors.
Example: A typographical error in a document can lead to miscommunication.
Example: A software bug that causes a program to crash is a system error.
Errors can be classified as critical, major, or minor based on thei
I appeared for an interview in Feb 2025, where I was asked the following questions.
I applied via Approached by Company and was interviewed in Jan 2024. There were 3 interview rounds.
Delivery is the process of transporting goods or items from one location to another.
Delivery involves the movement of goods or items
It can be done through various means such as shipping, courier services, or personal transportation
Delivery can be for both commercial and personal purposes
Examples of delivery include delivering packages to customers, transporting goods from a warehouse to a store, or delivering food orde
LIFO (Last In, First Out) and FIFO (First In, First Out) are inventory management methods used to track the flow of goods.
LIFO: The last item added to inventory is the first one to be sold or used.
FIFO: The first item added to inventory is the first one to be sold or used.
LIFO is commonly used when the cost of goods is rising, as it allows for higher inventory valuation.
FIFO is commonly used when the cost of goods is f...
SCM Summary is a concise overview of the supply chain management process.
SCM Summary provides a high-level understanding of the key components and activities involved in supply chain management.
It includes information about procurement, production, inventory management, logistics, and distribution.
The summary highlights the flow of goods, information, and finances throughout the supply chain.
It helps in identifying bot...
100 MCQ Question for Supply chain Management
Top trending discussions
The duration of SOLAR INDUSTRIES INDIA interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 19 interviews
Interview experience
based on 427 reviews
Rating in categories
Executive Production
130
salaries
| ₹2.5 L/yr - ₹5.3 L/yr |
Senior Executive
122
salaries
| ₹3 L/yr - ₹8 L/yr |
Executive
95
salaries
| ₹2.6 L/yr - ₹6.1 L/yr |
Assistant Manager
87
salaries
| ₹4.2 L/yr - ₹11.7 L/yr |
Production Supervisor
78
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Indian Army
Indian Air Force
Tata Advanced Systems
Hindustan Aeronautics