posted on 9 Apr 2023
I applied via Campus Placement and was interviewed before Apr 2022. There were 3 interview rounds.
Basic Level Aptitude and technical test
Group of 8 people in GD. Non eliminating Round. Given a random topic
There are several types of welding processes, including MIG, TIG, Stick, Flux-Cored, and Submerged Arc Welding.
MIG (Metal Inert Gas) welding uses a wire electrode and a shielding gas to join two pieces of metal together.
TIG (Tungsten Inert Gas) welding uses a tungsten electrode and a shielding gas to create a precise and clean weld.
Stick welding, also known as Shielded Metal Arc Welding (SMAW), uses a consumable electr...
A universal joint is a mechanical device that allows two rotating shafts to be connected at an angle.
It is also known as a U-joint or Cardan joint.
It is commonly used in vehicles to connect the drive shaft to the transmission and differential.
It allows for the transmission of power and torque between non-aligned shafts.
It consists of a cross-shaped component with bearings at each end that allow for rotation.
The angle b...
2 stroke engines have a power stroke every revolution, while 4 stroke engines have a power stroke every other revolution.
2 stroke engines have a simpler design and are lighter than 4 stroke engines.
2 stroke engines have a higher power-to-weight ratio than 4 stroke engines.
4 stroke engines are more fuel efficient and produce less emissions than 2 stroke engines.
Examples of 2 stroke engines include chainsaws and dirt bik...
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Jun 2021. There were 5 interview rounds.
I appeared for an interview before Feb 2023.
PPAP stands for Production Part Approval Process. It is a standardized process in the automotive industry to ensure suppliers meet quality requirements.
PPAP is a set of documents and requirements that must be submitted by suppliers to demonstrate their ability to meet customer specifications.
Elements in PPAP checklist include: design records, engineering change documents, process flow diagram, control plan, measurement...
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Aug 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
PPAP levels, FMEA, SPC, and Control Plan are quality management tools used in manufacturing.
PPAP (Production Part Approval Process) levels are used to ensure that manufactured parts meet customer requirements.
FMEA (Failure Mode and Effects Analysis) is a tool used to identify and prevent potential failures in a product or process.
SPC (Statistical Process Control) is a method of monitoring and controlling a process to e...
I appeared for an interview in Jun 2024.
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Why ur change the previous job?
TPM stands for Total Productive Maintenance, JH stands for Job Hazard Analysis, and QM stands for Quality Management.
TPM is a systematic approach to equipment maintenance that aims to maximize productivity and minimize downtime.
JH is a process of identifying and analyzing potential hazards in a job or work environment to prevent accidents and injuries.
QM involves the activities and processes used to ensure that product...
Root cause analysis is performed by identifying the underlying cause of a problem or issue.
Identify the problem or issue
Gather relevant data and information
Analyze the data to identify potential causes
Use techniques like the 5 Whys or Fishbone Diagram
Verify the root cause through testing or further investigation
Implement corrective actions to address the root cause
I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
Root cause can be established by identifying the underlying reason for a problem or issue.
Gather data and information related to the problem
Analyze the data to identify patterns and trends
Use tools like fishbone diagrams or 5 whys to dig deeper into the issue
Identify the root cause and develop a plan to address it
Monitor progress and adjust the plan as needed
Process problem is related to the steps taken to complete a task while quality problem is related to the outcome of the task.
Process problem is related to the steps taken to complete a task
Quality problem is related to the outcome of the task
Process problem can be identified by analyzing the steps taken to complete a task
Quality problem can be identified by analyzing the outcome of the task
Examples of process problem i...
based on 1 interview
Interview experience
Assistant Manager
134
salaries
| ₹5 L/yr - ₹13.5 L/yr |
Junior Manager
94
salaries
| ₹5 L/yr - ₹10.5 L/yr |
Deputy Manager
74
salaries
| ₹9.6 L/yr - ₹15.3 L/yr |
Manager
38
salaries
| ₹12 L/yr - ₹19.2 L/yr |
Engineer
35
salaries
| ₹3.5 L/yr - ₹10 L/yr |
Hero Motors Company
Daimler India Commercial Vehicles
Bajaj Motors
Audi